This facility is the fifth downstream hydroelectric plant of six on the Abitibi River. Designed by George F. Hardy Company, the construction of this 349 MW facility began in 1930 and became fully operational in 1936.[1] Hydro One has a 500 kV transmission line along with a 230 kV line that runs south to Sudbury and continues all the way to Toronto to interconnect with the rest of the 500 kV network in Ontario.
In 1930, a colony was established to house the employees of the plant and their families. About 130 people lived in the community which contained 30 homes, a community hall, skating rink, shooting range, school, hospital, general store, post office and church. By 1982, the community had expanded to about 300 residents.[2]