Construction began in 2012 by the Turkish company Polimeks. It became operational in April 2016 and was officially inaugurated on May 5, 2016. Full-scale operations commenced with the opening of the Asian Indoor and Martial Arts Games in Ashgabat on September 17, 2017.
Specifications
The length of the single-track circular line, including the branch to the depot, is 5,180 meters, with the elevation of viaducts and stations ranging from 6 to 20 meters. The line features eight covered elevated stations, designated M1 to M8. Three 25-meter articulated train units manufactured by Intamin operate along the line.
Each train has a capacity of 70 passengers and operates at a speed of 46 km/h, with a maximum speed of 70 km/h. [5]