Dimitrie Leonida (Stejaru) Hydro Power Plant is a hydropower development on the Bistrița River, near Bicaz, Romania. The project was started and finished in the 1950s. It consists of a dam, a reservoir, and a hydro power plant. The dam is a reinforced concrete structure with a height of 127 m (417 ft). It formed and holds the Bicaz Lake reservoir, also known as Mountain Spring Lake ("Lacul Izvorul Muntelui"). The reservoir is the largest artificial lake in Romania; it manages river levels downstream, provides fishing, attracts tourism, fuels the power plant, and controls flooding. The Oak Hydro-power plant ("Hidrocentrala Stejaru") is equipped with six turbines (four-27.5 MW and two-50 MW turbines) for a total installed capacity of 210 MW. The plant generates an average of 500 GWh of electricity per year, at a capacity factor of 30%; it has produced over 20 billion MWh of electricity in the first 50 years since commissioning. See alsoReferences