Cengkareng-Batu Ceper-Kunciran is 14.19 kilometers long, consisting of 4 work sections.[3][4] The four sections are, section 1 Kunciran – IC of Sultan Ageng Tirtayasa for 2.04 km, section 2 IC of Sultan Ageng Tirtayasa – on / off ramp of Benteng Betawi along 3.50 km. Then section 3 is the on / off ramp of Benteng Betawi – IC Husein Sastranegara along 6.50 km, and section 4 IC Husein Sastranegara – Benda Junction along 2.15 km. The toll road was expected to be operational by 2019.[5] The toll road was inaugurated in 1 April 2021 along with the first section of Serpong–Cinere Toll Road.[6]