Share to: share facebook share twitter share wa share telegram print page

City Centre–Māngere Line

City Centre-Mangere Line (CC2M)
Overview
StatusPlanning
LocaleAuckland, New Zealand
Termini
Stations18
Service
TypeLight Rail
SystemAuckland Light Rail (AT Metro)
Technical
Line length24 km (15 mi)
City Centre–Māngere Line
Wynyard Quarter ferry/water interchangeBus interchange
Te Waihorotiu
Karanga-a-Hape
Universities
proposed station
Dominion Junction
Maungawhau
Kingsland
Wesley
State Highway 20 NZ.svg SH 20
Southwestern
Motorway
Onehunga
Auckland Airport Māngere
State Highway 20 NZ.svg SH 20
Southwestern
Motorway

The City Centre–Māngere Line was a planned Light Rail line in Auckland, New Zealand, intended to be the first line in the Auckland Light Rail network. The planned route for the line travelled from the City Centre to Auckland Airport in Māngere. Final plans were for part of the 24 km line to be underground, with a cost of $14.6 billion which would have made it the single biggest transport project in New Zealand history. The entire Auckland Light Rail project was cancelled by the National-led coalition government in January 2024.[1]

History

Initial proposals (pre 2017)

City Centre Light Rail

Around 2015, Auckland Transport (AT) began investigating light rail as a method of relieving heavy bus congestion on arterial roads. AT's Chief Engineer pointed to the fact that major bus corridors, such as Fanshawe Street and Symonds Street, were carrying as many as 150 buses an hour at the time. AT believed that solutions such as double-decker buses and bus rapid transit would do little to address the issue as they would not provide sufficient capacity in the long-term.[2] Many of these corridors also ran through what were deemed to be "critical locations [that] cannot be served effectively by commuter rail" such as university campuses and the Wynyard Quarter, therefore a solution in-between bus routes and heavy rail would need to be found. Light Rail appeared in the 2015-2025 Auckland Regional Land Transport Plan with Queen Street, Symonds Street, Dominion Road, Sandringham Road, Manukau Road, and Mt Eden Road considered to be the most appropriate corridors for light rail. Incidentally, these were routes that had been served by tram lines up until the mid-1950s.[3]

In early 2016, AT was considering light rail options between the City Centre and the outer Auckland Isthmus. It was proposed that light rail would start with a Wynyard Quarter to Britomart connection, it would then run along Queen Street and Dominion Road to Mt Roskill before terminating at a depot in Sandringham.[4]

Extension to Māngere and Auckland Airport

At around the same time, AT was investigating rapid transit options to Auckland Airport and the surrounding Māngere area. Extending the isthmus light rail line to the airport began to be considered as a possibility in late 2015. A heavy rail connection was the existing preference but AT decided to explore light rail as a potential alternative, comparing the two rail options as part of their investigation.[5]

In early 2016, AT was progressing work to compare extending the planned light rail system or the existing heavy rail system to the Airport and Mangere. Early figures released in a video by AT suggested that a light rail extension performed better than a heavy rail extension on most metrics. Light rail was expected to have a greater catchment (of both people and jobs as well as future growth), a lower cost, and a higher benefit-cost-ratio.[6]

2016 comparison estimates done by AT [6]
Heavy Rail Light Rail
24,000 People living within 800m of station along route 60,000
57,000 Jobs within 800m of station along route 63,000
35–38 minutes Travel time between airport and city centre 46–49 minutes
$1.6-2.0 billion Total infrastructure cost estimate $0.9-1.0 billion
2,760 Hourly capacity (passengers per hour in each direction) 1,630
+20,500 people

+17,700 jobs

Total employment and population growth within catchment +54,000 people

+68,000 jobs

0.3-0.5 Benefit-cost-ratio 0.8-1.2

On 27 June 2016, AT and the NZTA decided that light rail would be the preferred option for a rapid transit connection to the airport. The two transport agencies concluded that an extension of the Onehunga Line to the airport would be too expensive and "poor value for money" when contrasted to light rail. Light rail seemed to be more favored due to the idea of "two for the price of one" where the entire City Centre–Māngere Line could be built for around the same cost as it would take to extend the heavy rail network to the airport.[7][8] The Prime Minister at-the-time, John Key, was supportive of the decision stating that he "would have thought the right decision has been made that other alternatives should be explored."[9]

Several days later, on 30 June 2016, AT released the report examining rapid transit in South-West Auckland and the airport area.[10]

Advanced Bus Solution

In the first half of 2017, the NZTA investigated an "Advanced Bus Solution" as an intermediate step to the implementation of the City Centre-Māngere Light Rail line. This was reportedly due to the unwillingness of the Fifth National Government to fund light rail, with light rail only a potential follow-up to the "Advanced Bus Solution" after 30 years.[11][12][13]

2017 Election

Auckland light rail featured prominently at the 2017 election, with the Labour Party promising to build light rail from the Wynyard Quarter to Mt Roskill within four years. This would be followed by light rail from Mt Roskill to the airport within ten years.[14] The Green Party was also supportive of the City Centre–Māngere Line, promising light rail to the airport by 2021.[15] This was to be done by fast-tracking the current plans that were not going to be implemented for another 30 years and by investigating additional funding sources (such as land-value capture) to get the $2.3 billion needed to fund the project. The then-transport minister Simon Bridges responded by saying that he didn't think that it was feasible to bring light rail forward to 2021, stating that "We support route protection now, and we want to have a public transport corridor. Moving from bus to light rail is probably a question of when there is demand for it." He also stated that the recently opened Waterview (road) tunnel had already made significant differences to travel times to the airport.[16]

2017–2024

Following the 2017 election the City Centre-Māngere line was a key policy in the formation of the Sixth Labour Government, with the confidence and supply agreement between the Labour Party and the Green Party (one of the two junior partners, alongside New Zealand First) including a promise to begin work on light rail to the airport.[17]

However, by early 2018 it was apparent that the government would not achieve its goal of building the line in time for the 2021 America's Cup and APEC Summit. Instead, it was thought that construction would start in 2020 and be completed by 2025 in a best-case scenario.[18][19]

The government launched the procurement process in May 2018 to investigate and decide on financing and delivery options for the City Centre-Māngere line as well as the Northwest Light Rail Line. It was revealed that the New Zealand Super Fund had already expressed interest in forming an international consortium to design, build, and operate both of the planned lines on the light rail network. The proposal included the fund partnering with CDPQ Infra to deliver the network.[20][21][22]

By January 2022, eventual plans for the City Centre-Māngere line involved a "tunneled light rail" approach, estimated to cost $14.6 billion. This iteration would have seen the line travel through a tunnel from Wynyard Quarter to Mt Roskill before continuing above ground to Māngere and the airport.[23] If implemented it would have been the single largest transport project in New Zealand history, beating out the $4.4 billion City Rail Link currently under construction in central Auckland. The line would have followed a 24 km route, passing through 18 stations.[24] As at December 2023, the project had an estimated cost of $12.6bn and a benefit-cost ratio of 2.4, indicating $2.4 of benefit for every $1 invested. Trains would have run every 5 minutes at peak, with capacity to increase as demand grows.[25]

Comparison of preferred and alternative options (December 2023) - Auckland Light Rail Ltd.[25]
Preferred option Alternative option
Type Light metro (grade separated) Light rail (street-running)
Capacity 19,800 people per hour, per direction 6,990 people per hour, per direction
Travel time Auckland Airport to Wynyard Quarter (CBD) - 38 minutes

Mt. Roskill to University (CBD) - 10 minutes

Auckland Airport to Wynyard Quarter (CBD) - 58 minutes

Mt. Roskill to University (CBD) - 30 minutes (19 min journey + 11 minute walk)

Cost estimate $12.6bn $9.0bn
Benefit-cost ratio (BCR) 2.4 2.4
Urban form 75,000 additional homes

122,000 additional jobs

48,000 additional homes

84,000 additional jobs

Cancellation

The entire Auckland Light Rail project was cancelled by the National-led coalition government on 14 January 2024.[1]

References

  1. ^ a b "National-led government officially cancels Auckland Light Rail plans". Radio New Zealand. 14 January 2024. Archived from the original on 15 January 2024. Retrieved 14 January 2024.
  2. ^ Slade, Maria (22 January 2015). "Len Brown cool on light rail in Auckland transport plan". Stuff. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  3. ^ "Auckland Regional Land Transport Plan 2015-2025" (PDF). 1 July 2015. Archived from the original (PDF) on 22 April 2017. Retrieved 29 April 2023.
  4. ^ "Light rail". 28 March 2016. Archived from the original on 28 March 2016. Retrieved 29 April 2023.
  5. ^ "Airport and Mangere rail". 17 October 2015. Archived from the original on 17 October 2015. Retrieved 29 April 2023.
  6. ^ a b Lowrie, Matt (5 January 2016). "Light Rail to the Airport". Greater Auckland. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  7. ^ Lowrie, Matt (5 December 2018). "A history of the light rail project". Greater Auckland. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  8. ^ "Heavy rail link from Auckland CBD to airport off the cards, agencies say". Stuff. 27 June 2016. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  9. ^ "Auckland Airport rail dumped". NZ Herald. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  10. ^ "SMART Indicative Business Case (Draft)" (PDF). 30 June 2016. Archived from the original (PDF) on 23 April 2017. Retrieved 29 April 2023.
  11. ^ "Auckland under pressure: Is it broken?". NZ Herald. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  12. ^ Lowrie, Matt (26 March 2017). "Advanced buses not a solution". Greater Auckland. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  13. ^ "Advanced bus solution: final report | Waka Kotahi NZ Transport Agency". www.nzta.govt.nz. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  14. ^ "Labour's plans for light rail to airport". NZ Herald. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  15. ^ "Green Party pledges free public transport for under-19s and light rail to Auckland Airport". Stuff. 21 August 2017. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  16. ^ "Greens want light rail to Auckland Airport in time for America's Cup in 2021". Stuff. 5 July 2017. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  17. ^ "Revealed: Labour and Greens confidence and supply agreement". Newshub. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  18. ^ "Auckland trams not coming until 2025, say experts". NZ Herald. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  19. ^ Lowrie, Matt (9 April 2018). "Accelerating Light Rail Delivery". Greater Auckland. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  20. ^ "NZ Super Fund - NZ Super Fund statement on Auckland Light Rail Project". NZ Super Fund. 8 May 2018. Archived from the original on 30 April 2023. Retrieved 30 April 2023.
  21. ^ Lowrie, Matt (9 May 2018). "Light Rail procurement starts". Greater Auckland. Archived from the original on 30 April 2023. Retrieved 30 April 2023.
  22. ^ "Auckland light rail a step closer". Beehive.govt.nz. Archived from the original on 30 April 2023. Retrieved 30 April 2023.
  23. ^ Niall, Todd (27 January 2022). "Auckland light rail goes for tunnel option with harbour crossing". Stuff. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  24. ^ Lowrie, Matt (31 January 2022). "Sooo… Tunnelled Light Rail". Greater Auckland. Archived from the original on 29 April 2023. Retrieved 29 April 2023.
  25. ^ a b Auckland Light Rail Ltd - Briefing to the Incoming Minister of Transport, December 2023

Read other articles:

BeatlessBerkas:Beatless novel.jpgSampul pada NovelGenreScience fiction[1] Novel serialPengarangSatoshi HaseIlustratorRedjuicePenerbitKadokawa ShotenPenerbit bahasa InggrisNA J-Novel ClubTokyo Otaku ModeMajalahNewtypeTerbit10 Juni 2011 – 10 Juli 2012Volume1 MangaPengarangKilaPenerbitKadokawa ShotenImprintKadokawa Comics Ace ExtraDemografiShōnenTerbit10 Juni 2011 – 10 Juli 2012Volume1 MangaBeatless: DystopiaPengarangKagura UguisuPenerbitKadokawa ShotenMajalahMonthly Shōnen AceDemogra…

Vaidas Baumila Informations générales Nom de naissance Vaidas Jacob Baumila Naissance 28 mars 1987 (36 ans)Vilnius Lituanie Activité principale Chanteur Genre musical Pop, R&B Années actives Depuis 2005 modifier Vaidas Jacob Baumila, né le 28 mars 1987 à Vilnius en Lituanie, est un chanteur lituanien. Le 21 février 2015, il remporte la finale nationale Eurovizijos 2015 en duo avec la chanteuse Monika Linkytė. Ils sont choisis pour représenter la Lituanie au Concours Eurovision …

1957 novel by Jim Thompson The Kill-Off First editionAuthorJim ThompsonCountryUnited StatesLanguageEnglishGenreCrime fictionPublisherLion BooksPublication date1957 The Kill-Off is an American crime novel by Jim Thompson first published in 1957, and reprinted by Vintage Crime/Black Lizard in 1999. The novel is a bleak tale of murder in a small, dying resort town being torn apart by gossip, racism, incest (actual or alleged), alcoholism and financial difficulties. It was adapted into a film in 199…

Sejuta Duka IbuSutradaraArifin C. NoerProduserUmar SitompulDitulis olehMotinggo BoesjePemeranMarini Rudy Salam Doris Callebaute Deddy Sutomo Fara Noor Aedy Moward Fachrul Rozy Niken Basuki Aminah Cendrakasih.SinematograferAdrian SusantoPenyuntingTantra SurjadiTanggal rilis1977Durasi120 menitNegaraIndonesia Sejuta Duka Ibu adalah film Indonesia tahun 1977 dengan disutradarai oleh Arifin C. Noer serta dibintangi oleh Marini, Rudy Salam, Deddy Sutomo, Doris Callebaute dan Fara Noor, Film ini diadap…

YanamMunicipalità (Municipality)LocalizzazioneStato India Territorio Pondicherry DivisioneNon presente DistrettoYanam TerritorioCoordinate16°44′N 82°13′E / 16.733333°N 82.216667°E16.733333; 82.216667 (Yanam)Coordinate: 16°44′N 82°13′E / 16.733333°N 82.216667°E16.733333; 82.216667 (Yanam) Altitudine0[1] m s.l.m. Superficie30 km² Abitanti31 362[3] (2001) Densità1 045,4 ab./km² Altre informazi…

Canadian synchronized swimmer Tracy LittlePersonal informationNationality CanadaBorn (1985-11-26) November 26, 1985 (age 38)Pointe-Claire, CanadaHeight170 cm (5 ft 7 in)Weight56 kg (123 lb)SportSportSwimmingStrokesSynchronized swimmingClubSynchro Élite Medal record Representing  Canada Synchronized swimming World Championships 2011 Shanghai Free routine combination Pan American Games 2007 Rio de Janeiro Team 2011 Guadalajara Team Tracy Little (born Novemb…

Genocide of European Jews by Nazi Germany This article is about the state-sponsored genocide of European Jews during World War II. For all peoples persecuted during this era, see Holocaust victims. Holocaust and Shoah redirect here. For other uses, see Holocaust (disambiguation) and Shoah (disambiguation). The HolocaustPart of World War IIJews arriving at Auschwitz II in German-occupied Poland, May 1944. Most were selected to go to the gas chambers.LocationEurope, primarily German-occupied Polan…

Voce principale: Professional'nyj Futbol'nyj Klub Central'nyj Sportivnyj Klub Armii. CSKA MoscaStagione 2014-2015La squadra del CSKA Mosca il 21 ottobre 2014 contro il Manchester City in una partita di UEFA Champions League Sport calcio Squadra CSKA Mosca Allenatore Leonid Sluckij Presidente Evgenij Giner Prem'er-Liga2º posto Kubok RossiiSemifinale Superkubok RossiiVincitore Champions LeagueFase a gironi Maggiori presenzeCampionato: 4 calciatori[1] (30) Miglior marcatoreCampionato:…

Glacier in northeastern Greenland Britannia GlacierBritannia GletscherSouthern end of the Britannia Glacier and Britannia Lake Sentinel-2 image. The terminus of the Admiralty Glacier is seen in the lower left.Location within GreenlandTypePiedmont glacierLocationQueen Louise LandCoordinates77°11′N 24°00′W / 77.183°N 24.000°W / 77.183; -24.000Width9 km (5.6 mi)TerminusBritannia Lake Britannia Glacier (Danish: Britannia Gletscher) is a glacier in Queen Loui…

2014 Sri Lankan fantasy thriller film Kalpanthe SihinayakPromotional release posterකල්පාන්තයේ සිහිනයක්Directed byChanna Perera[1]Written byKapila Kumara Kalinga, Channa PereraProduced byPearly Wijesinghe, Sunethra Balasuriya, Harsha Gamaethige, Asela AmarasiriStarringChanna Perera Chaithra Chandranth Sanath GunathilakeCinematographyPushpakumara Rajaguru Chandana Jayasinghe Upul PrajathEdited byRavindra LalMusic byRohana Weerasinghe Dinesh SubasingheDis…

Australian Paralympic rower Jeremy McGrathPersonal informationNationality AustraliaBorn (1994-04-21) 21 April 1994 (age 29)SportSportRowingClubBalmain Rowing Club Medal record 2014 Amsterdam Mixed Double Sculls - LTAMix2x Jeremy McGrath (born 21 April 1994)[1] is an Australian Paralympic rower. He represented Australia at the 2016 Rio Paralympics.[2] Personal McGrath was born on 21 April 1994. He was born without a fibula and with a slightly shortened tibia in his right…

Austronesian language of Southeast Asia This article is about the language on which Standard Indonesian and Malaysian are based. For the vernacular varieties and dialects of Malay, see Malayic languages. For the standard Malay used in Malaysia, see Malaysian Malay. Not to be confused with Malayalam, a Dravidian language. MalayMalay/Indonesian[1]Bahasa Melayu بهاس ملايوPronunciation[baˈha.sa məˈla.ju]Native toBrunei, East Timor, Indonesia, Malaysia, Singapore, Sou…

Ormesson-sur-MarneNegaraPrancisArondisemenNogent-sur-MarneAntarkomuneCommunautéd'agglomérationdu Haut Val-de-Marne Ormesson-sur-Marne merupakan sebuah komune di pinggiran tenggara Paris, Prancis. Terletak 16.1 km (10 mil) dari pusat kota Paris. Angkutan Ormesson-sur-Marne tidak dilayani oleh stasiun Métro de Paris, RER, atau jaringan rel pinggiran. Stasiun terdekat dengan Ormesson-sur-Marne adalah dua stasiun RER jalur A Paris: Sucy – Bonneuil dan La Varenne – Chennevières. Stasiun …

Lobster buoy hitchCategoryHitchRelatedCow hitch, Buntline hitch, Two half-hitchesReleasingJammingTypical useattaching lines to rings, eyes, posts, rods, and railingsABoK#58, #1714, #1839 Untightened Lobster buoy hitch The lobster buoy hitch is similar to the buntline hitch, but made with a cow hitch around the standing part rather than a clove hitch. Like the buntline hitch, this knot is strong, secure and compact. See also List of knots References Clifford W. Ashley. The Ashley Book of Knots. D…

This article is about the metropolitan area. For the geographic area, see Mahoning Valley (geographic). Metropolitan Statistical Area in Ohio, United StatesMahoning Valley Youngstown–Warren, OH Metropolitan Statistical AreaMetropolitan Statistical AreaDowntown Youngstown as viewed from Wean ParkMap of Youngstown–Warren–Salem, OH CSA   Youngstown–Warren MSA   Salem µSA   City of Youngstown   City of Warren CountryUnited StatesStateOhioLargest…

U Kyaw Nyeinbahasa Burma: ဦးကျော်ငြိမ်းU Kyaw Nyein di bandara Heho, negara bagian Shan Menteri Dalam Negeri Burma ke-1Masa jabatan4 Januari 1948 – 2 April 1949PresidenSao Shwe ThaikPendahuluJabatan dibentukPenggantiNe WinMenteri Urusan Luar Negeri dan Wakil Perdana MenteriMasa jabatan14 September 1948 – 2 April 1949PresidenSao Shwe ThaikPendahuluU Tin Tut (Menteri Luar Negeri)Bo Let Ya (Wakil Perdana Menteri)PenggantiDr. E Maung (Menteri Luar …

この項目には、一部のコンピュータや閲覧ソフトで表示できない文字が含まれています(詳細)。 数字の大字(だいじ)は、漢数字の一種。通常用いる単純な字形の漢数字(小字)の代わりに同じ音の別の漢字を用いるものである。 概要 壱万円日本銀行券(「壱」が大字) 弐千円日本銀行券(「弐」が大字) 漢数字には「一」「二」「三」と続く小字と、「壱」「弐」…

Apparatus used to affix a weapon to an installation or vehicle This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Weapon mount – news · newspapers · books · scholar · JSTOR (June 2022) (Learn how and when to remove this message) A weapon mount is an assembly or mechanism used to hold a weapon (typically a gun) ont…

Расположение семяпочек в цветке морозника вонючего (Helleborus foetidus) Семязача́ток, или семяпо́чка (лат. ovulum), — образование у семенных растений, из которого (обычно после оплодотворения) развивается семя. Представляет собой женский спорангий (мегаспорангий) семенных ра…

Hurricane season in the Atlantic Ocean 1902 Atlantic hurricane seasonSeason summary mapSeasonal boundariesFirst system formedJune 12, 1902Last system dissipatedNovember 6, 1902Strongest stormNameFour • Maximum winds105 mph (165 km/h)(1-minute sustained) • Lowest pressure970 mbar (hPa; 28.64 inHg) Seasonal statisticsTotal storms5Hurricanes3Total fatalities5Total damageUnknownRelated articles 1900–09 Pacific hurricane seasons 1902-19 Pacific typhoon seasons 1900s North In…

Kembali kehalaman sebelumnya