Columbia Basin Project

The Columbia Basin Irrigation Project

The Columbia Basin Project (or CBP) in Central Washington, United States, is the irrigation network that the Grand Coulee Dam makes possible. It is the largest water reclamation project in the United States, supplying irrigation water to over 670,000 acres (2,700 km2) of the 1,100,000 acres (4,500 km2) large project area, all of which was originally intended to be supplied and is still classified irrigable and open for the possible enlargement of the system. Water pumped from the Columbia River is carried over 331 miles (533 km) of main canals, stored in a number of reservoirs, then fed into 1,339 miles (2,155 km) of lateral irrigation canals,[1] and out into 3,500 miles (5,600 km) of drains and wasteways.[2] The Grand Coulee Dam, powerplant, and various other parts of the CBP are operated by the Bureau of Reclamation. There are three irrigation districts (the Quincy-Columbia Basin Irrigation District, the East Columbia Basin Irrigation District, and the South Columbia Basin Irrigation District) in the project area, which operate additional local facilities.[3]

History

The U.S. Bureau of Reclamation was created in 1902 to aid development of dry western states. Central Washington's Columbia Plateau was a prime candidate—a desert with fertile loess soil and the Columbia River passing through.

Competing groups lobbied for different irrigation projects; a Spokane group wanted a 134 miles (216 km) gravity flow canal from Lake Pend Oreille while a Wenatchee group (further south) wanted a large dam on the Columbia River, which would pump water up to fill the nearby Grand Coulee, a formerly-dry canyon-like coulee.

After thirteen years of debate, President Franklin D. Roosevelt authorized the dam project with National Industrial Recovery Act money. (It was later specifically authorized by the Rivers and Harbors Act of 1935, and then reauthorized by the Columbia Basin Project Act of 1943 which put it under the Reclamation Project Act of 1939.)[3] Construction of Grand Coulee Dam began in 1933 and was completed in 1942. Its main purpose of pumping water for irrigation was postponed during World War II in favor of electrical power generation that was used for the war effort. Additional hydroelectric generating capacity was added into the 1970s. The Columbia River reservoir behind the dam was named Franklin Delano Roosevelt Lake in honor of the president. The irrigation holding reservoir in Grand Coulee was named Banks Lake.

After World War II the project suffered a number of setbacks. Irrigation water began to arrive between 1948 and 1952, but the costs escalated, resulting in the original plan, in which the people receiving irrigation water would pay back the costs of the project over time, being repeatedly revised and becoming a permanent water subsidy. In addition, the original vision of a social engineering project intended to help farmers settle on small landholdings failed. Farm plots, at first restricted in size, became larger and soon became corporate agribusiness operations.[1]

The original plan was that a federal agency similar to the Tennessee Valley Authority would manage the entire system. Instead, conflicts between the Bureau of Reclamation and the Department of Agriculture thwarted the goal of both agencies of settling the project area with small family farms; larger corporate farms arose instead.[1]

The determination to finish the project's plan to irrigate the full 1,100,000 acres (4,500 km2) waned during the 1960s. The estimated total cost for completing the project had more than doubled between 1940 and 1964, it had become clear that the government's financial investment would not be recovered, and that the benefits of the project were unevenly distributed and increasingly going to larger businesses and corporations. These issues and others dampened enthusiasm for the project, although the exact motives behind the decision to stop construction with the project about half finished are not known.[1]

Geology

Drumheller Channels, 10 miles (16 km) south of Potholes Reservoir, are examples of channeled scablands

The Columbia Basin in Central Washington is fertile due to its loess soils, but large portions are a near desert, receiving less than ten inches (254 mm) of rain per year. The area is characterized by huge deposits of flood basalt, thousands of feet thick in places, laid down over a period of approximately 11 million years, during the Miocene epoch.[4] These flood basalts are exposed in some places, while in others they are covered with thick layers of loess.

During the last ice age glaciers shaped the landscape of the Columbia River Plateau. Ice blocked the Columbia River near the north end of Grand Coulee, creating glacial lakes Columbia and Spokane. Ice age glaciers also created Glacial Lake Missoula, in what is now Montana. Erosion allowed glacial Lake Columbia to begin to drain into what became Grand Coulee, which was fully created when glacial Lake Missoula along with glacial Lake Columbia catastrophically emptied.[5] This flood event was one of several known as the Missoula Floods. Unique erosion features, called channeled scablands, are attributed to these amazing floods.

Component units of the project

Grand Coulee Dam Complex and Lake Roosevelt

  • Grand Coulee Dam (1950)[6]
    • Right (north) Powerhouse
    • Left (south) Powerhouse
    • Third Powerhouse (1974) was added as a north wing of the dam from the original Right powerhouse.[7] This addition expanded power generation by 300%.[8]
  • Lake Roosevelt
  • Grand Coulee Pumping-Generating Plant (1953) consist of 12 pump-turbine units and two reversible pump-turbine units.) The reversible pump-turbines are used to move water from Lake Roosevelt into Banks Lake, from which it can be either sent south into the Columbia Basin Irrigation system or returned to Lake Roosevelt by the generating pumps to create additional electricity for the grid.[6]

Feeder Canal, North and Dry Falls Dams, Banks Lake

  • Banks Lake (1951) is an artificial impoundment in the Upper Grand Coulee. It is 27 miles (43 km) long and 1 to 3 miles (1.6 to 4.8 km) wide. The coulee has nearly vertical rock walls up to 600 feet (180 m) high.
    North Dam on Banks Lake with Feeder Canal
    • North Dam, near the town of Grand Coulee, has a maximum height of 145 feet (44 m) and a crest length of 1,400 feet (430 m).
    • Dry Falls, or South Dam, near Coulee City, has a maximum height of 123 feet (37 m) and a crest length of 8,880 feet (2,710 m). The crest elevation of both dams is 1,580 feet (480 m). Project water enters Banks Lake through the Feeder Canal from the Pump-generating plant.[6] The outlet for Banks Lake is the Main Canal near Coulee City. It is near the east abutment of Dry Falls Dam.[6] Banks Lake serves as an equalizing reservoir for storage of water for irrigation and can be used to for power generation.
  • Feeder Canal (1951) links North Dam at northern end of Banks Lake with the siphon outlets for the Grand Coulee Pumping—Generating plants discharge lines. It is 1.6 miles (2.6 km) long running in an open concrete-lined canal, and a twin-barrel concrete cut—and-cover conduit.[6]
  • Main Canal (1951) is 8.3 miles (13.4 km), including 2.4 miles (3.9 km) of lake sections.[6]
  • Bacon Tunnel and Siphon (1950) is a 1,037.5 feet (316.2 m) long sealed Siphon under the eastern extension of the Dry Falls draw.[6]
    Aerial view of Pinto Dam, Washington, USA.
  • Billy Clapp Lake (Pinto Dam – zoned earth & rockfill) (1951) aka (Long Lake Dam) is at the south end of Long Lake Coulee. The reservoir is 6 miles (9.7 km) long and 0.5 miles (0.80 km) wide.[6]
  • Potholes Reservoir

Irrigation

When it was built, Grand Coulee Dam was the largest dam in the world, but it was only part of the irrigation project. Additional dams were built at the north and south ends of Grand Coulee, the dry canyon south of Grand Coulee Dam, allowing the coulee to be filled with water pumped up from the Columbia River. The resulting reservoir, called Banks Lake, is about 30 miles (48 km) long. Banks Lake serves as the CBP's initial storage reservoir. Additional canals, siphons, and reservoirs were built south of Bank Lake, reaching over 100 miles (160 km). Water is lifted 280 feet (85 m) from Lake Roosevelt to feed the massive network.

The total amount of the Columbia flow that is diverted into the CBP at Grand Coulee varies a little from year to year, and is currently about 3.0 million acre-feet. This is about 3.8 percent of the Columbia's average flow as measured at the Grand Coulee dam.[9] This amount is larger than the combined annual flows of the nearby Yakima,[10] Wenatchee,[11] and Okanogan[12] rivers. There were plans to double the area of irrigated land, according to tour guides at the dam, over the next several decades. However, the Bureau of Reclamation website states that no further development is anticipated, with 671,000 acres (2,720 km2) irrigated out of the original 1,100,000 acres (4,500 km2) planned.[13]

Interest in completing the Columbia Basin Project's 1,100,000 acres (4,500 km2) has grown in the late 20th and early 21st centuries. One reason for the renewed interest is the substantial depletion of the Odessa aquifer. Agricultural operations within the CBP's boundaries but outside the developed portion have for decades used groundwater pumped from the Odessa aquifer to irrigate crops.[1]

Hydroelectric power

Hydroelectricity was not the primary goal of the project, but during World War II the demand for electricity in the region boomed. The Hanford nuclear reservation was built just south of the project and aluminum smelting plants flocked to the Columbia Basin. A new power house was built at the Grand Coulee Dam, starting in the late sixties, that tripled the generating capacity. Part of the dam had to be blown up and re-built to make way for the new generators. Electricity is now transmitted to Canada and as far south as San Diego.

Environmental impact

One environmental impact has been the reduction in native fish stocks above the dams. The majority of fish in the Columbia basin are migratory fish like salmon, sturgeon and steelhead. These migratory fish are often harmed or unable to pass through the narrow passages and turbines at dams. In addition to the physical barriers the dams pose, the slowing speed and altered course of the river raises temperatures, alters oxygen content, and changes river bed conditions. These altered conditions can stress and potentially kill both migratory and local non-migratory organisms in the river. The decimation of these migratory fish stocks above Grand Coulee Dam would not allow the former fishing lifestyle of Native Americans of the area, who once depended on the salmon for a way of life.

The environmental impacts of the Columbia Basin Project have made it a contentious and often politicized issue. A common argument for not implementing environmental safeguards at dam sites is that post-construction modifications would likely have to be significant. Tour guides at the Grand Coulee dam site, for example, indicate that a "fish ladder might have to be 5 miles (8.0 km) long to get the fish up the 550 feet (170 m) needed, and many fish would die before reaching the upper end" thus no fish ladders were built. Advocates of remedial measures point out that such steps would still be better than the status quo, which has led to marked die-offs and the likely extinction[14] of several types of salmon.

There are a number of issues regarding the runoff of irrigation water. The project region receives about 6 to 10 inches (250 mm) of annual rainfall, while the application of irrigation water amounts to an equivalent 40 to 50 inches (1,300 mm). The original plans did not sufficiently address the inevitable seepage and runoff.[1] In some cases the results are beneficial. For example, numerous new lakes provide recreation opportunities and habitat for fish and game. In other cases agricultural chemicals in the runoff cause pollution.[citation needed]

Economic benefits and costs

The irrigation water provided by this project greatly benefits the agricultural production of the area. North Central Washington is one of the largest and most productive tree fruit producing areas on the planet. Without Coulee Dam and the greater Columbia Basin Project, much of North Central Washington State would be too arid for cultivation.

According to the federal Bureau of Reclamation the yearly value of the Columbia Basin Project is $630 million in irrigated crops, $950 million in power production, $20 million in flood damage prevention, and $50 million in recreation.[15] The project itself involves costs that are difficult to determine. The farms that receive irrigation water must pay for it, but due to insufficient data from the Bureau of Reclamation, it is not possible to compare the total cost paid by the Bureau to the payments received. Nevertheless, the farm payments account for only a small fraction of the total cost to the government, resulting in the project's agricultural corporations receiving a large water subsidy from the government.[1] Critics describe the CBP as a classical example of federal money being used to subsidize a relatively small group of farmers in the American West in places where it would never be economically viable under other circumstances.[1]

See also

References

  1. ^ a b c d e f g h Bloodworth, Gina; James White (2008). "The Columbia Basin Project: Seventy-Five Years Later". Yearbook of the Association of Pacific Coast Geographers. 70 (Annual 2008): 96–111. doi:10.1353/pcg.0.0006. ISSN 0066-9628. S2CID 128572803. Retrieved May 30, 2013.
  2. ^ "Project details - Columbia Basin Project". United States Bureau of Reclamation. Archived from the original on February 15, 2015. Retrieved October 25, 2009.
  3. ^ a b https://web.archive.org/web/20141003030357/http://www.usbr.gov/projects/Project.jsp. Archived from the original on October 3, 2014. Retrieved August 5, 2012. {{cite web}}: Missing or empty |title= (help)
  4. ^ Orr (1996), pg. 288.
  5. ^ Orr (1996), pg. 305.
  6. ^ a b c d e f g h Draft Environmental Statement, Columbia Basin Project, Washington; Columbia Basin Project, Ephrata, Washington; Department of the Interior, (INT DES-75-3), Bureau of Reclamation, Department of the Interior; Washington, D.C.; 1975
  7. ^ Roise, Charlene (16 September 2014). "Powerhouse: Marcel Breuer at Grand Coulee". docomomo-us. Retrieved 18 July 2017.
  8. ^ "Grand Coulee Powerplant". U.S. Bureau of Reclamation. Archived from the original on 29 April 2014. Retrieved 11 March 2015.
  9. ^ "Columbia River - Annual Report 2001". www.ijc.org. Archived from the original on December 23, 2017. Retrieved March 16, 2018.
  10. ^ https://pubs.usgs.gov/wdr/2005/wdr-wa-05-1/pdf/wa00103ADR2005_Figure60.pdf [bare URL PDF]
  11. ^ https://pubs.usgs.gov/wdr/2005/wdr-wa-05-1/pdf/wa00103ADR2005_Figure56.pdf [bare URL PDF]
  12. ^ https://pubs.usgs.gov/wdr/2005/wdr-wa-05-1/pdf/wa00103ADR2005_Figure52.pdf [bare URL PDF]
  13. ^ Bureau of Reclamation website Archived December 6, 2008, at the Wayback Machine
  14. ^ NWFS 2003 Update Summary, p.5
  15. ^ "The Story of the Columbia Basin Project". United States Bureau of Reclamation. Archived from the original on May 13, 2009. Retrieved October 25, 2009.

External links

Read more information:

State Secretary for the Imperial Colonial OfficeStaatssekretär des ReichskolonialamtesService flag of the Colonial OfficeLongest servingWilhelm Solf(20 December 1911 – 13 December 1918)Imperial Colonial OfficeStatusAbolishedMember ofThe CabinetReports toThe ChancellorFormation1 April 1890First holderFriedrich Richard Krauel [de]Final holderJohannes BellAbolished20 June 1919 This page lists colonial ministers of Imperial Germany. With the loss of Germany's colonies in the Treaty o…

Further information: 4th millennium BC, 3rd millennium BC, and 2nd millennium BC This article or section possibly contains synthesis of material which does not verifiably mention or relate to the main topic. Relevant discussion may be found on the talk page. (October 2018) (Learn how and when to remove this template message) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and …

Ir. H.Darmansyah HuseinIr. H. Darmansyah Husein sebagai Anggota Dewan Perwakilan Daerah Republik Indonesia periode 2019–2024 Bupati BelitungMasa jabatan30 Desember 2003 – 30 Desember 2008WakilSahani Saleh, BAMasa jabatan30 Desember 2008 – 30 Desember 2013 Informasi pribadiLahir(1954-07-17)17 Juli 1954Gantung, Belitung Timur Kepulauan Bangka BelitungKebangsaanIndonesiaPartai politikPartai Bulan BintangSuami/istriTitiek YoesiatiAlma materInstitut Teknologi BandungPekerjaanP…

Institut Agama Kristen Negeri ManadoJenisPerguruan Tinggi Kristen Negeri di IndonesiaDidirikan2007 (diresmikan tahun 2008)Lembaga indukDirjen Bimas Kristen Kemenag RIRektorDr. Olivia Cherly Wuwung, S.T., M.Pd.AlamatJl. Bougenville, Tateli I, Mandolang, Minahasa, Sulawesi Utara, IndonesiaWarna  UnguNama julukanIAKN ManadoSitus webIAKN Manado Institut Agama Kristen Negeri (IAKN) Manado sebelumnya Sekolah Tinggi Agama Kristen Negeri (STAKN) Manado adalah sebuah perguruan tinggi keagamaan yang …

SMP Negeri 1 KemangkonSMP N 1 KEMANGKONInformasiJenisSekolah NegeriAkreditasiAKepala SekolahSri Sulastri, S.PdJumlah kelas24Rentang kelasVII, VIII, IXKurikulumKurikulum 13AlamatLokasiJl. Raya Karangkemiri, Purbalingga, Jawa TengahMoto SMP Negeri (SMPN) 1 Kemangkon, adalah salah satu sekolah menengah pertama negeri yang berada di Kabupaten Purbalingga, Jawa Tengah, Indonesia. SMP Negeri 1 Kemangkon ini merupakan SMP di Kecamatan Kemangkon, Purbalingga. SMPN 1 Kemangkon terkenal karena m…

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: P.O.D. discography – news · newspapers · books · scholar · JSTOR (June 2008) (Learn how and when to remove this template message) P.O.D. discographyStudio albums10Live albums3Compilation albums1Video albums1Music videos26EPs3Singles21Promotional singles3Acoustic a…

1840 Eeuwen: 18e eeuw · 19e eeuw · 20e eeuw Decennia: 1830-1839 · 1840-1849 · 1850-1859 Jaren: << · < · 1839 · 1840 · 1841 · > · >> Jaartelling in verschillende culturen Ab urbe condita: 2593 MMDXCIII Armeense jaartelling: 1289 – 1290ԹՎ ՌՄՁԹ – ՌՄՂ Chinese jaartelling: 4536 – 4537丙亥 – 丁子 Christelijke jaartelling: 1840 MDCCCXL Ethiopische jaartell…

Khan of the Golden Horde from 1257 to 1266 For the Mamluk leader al-Malik al-Sa'id Berke Khan, see Al-Said Barakah. For people with the given name and surname Berke, see Berke (name). This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (June 2013) (Learn how and when to remove this template message) Berke Khanبرکه خان‎Coinage of Berke, Qrim (Crimea) mint…

Indoor exhibition center in New Jersey, United States Asbury Park Convention HallAddress1300 Ocean AvenueLocationAsbury Park, New JerseyPublic transitNJ Transit at Asbury Park station   North Jersey Coast Line NJT Bus: 832, 837 Asbury Park Convention HallU.S. National Register of Historic PlacesNew Jersey Register of Historic Places Show map of Monmouth County, New JerseyShow map of New JerseyShow map of the United StatesLocationOcean Avenue, Asbury Park, New JerseyCoordinates40°13′…

Aire d'attraction de Thizy-les-Bourgs Localisation de l'aire d'attraction de Thizy-les-Bourgs dans la circonscription départementale du Rhône. Géographie Pays France Région Auvergne-Rhône-Alpes Départements - Loire - Rhône Caractéristiques Type Aire d'attraction d'une ville Code Insee 553 Catégorie Aires de moins de 50 000 habitants Nombre de communes 2 soit 1 (Loire) + 1 (Rhône) Population 7 056 hab. (2021) modifier  L'aire d'attraction de Thizy-les-Bourgs est…

Detail Lukisan Dinding di St Michael in Berg am Laim (Munich) Halaman artikel ini diterjemahkan, sebagian atau seluruhnya, dari halaman di en.wikipedia yang berjudul (Tolong cantumkan nama artikel sumber terjemahan). Lihat pula sejarah suntingan halaman aslinya untuk melihat daftar penulisnya. Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat diper…

Asdrubale MatteiProbabile ritratto di Asdrubale MatteiMarchese di GioveStemma In carica14 giugno 1597 –8 gennaio 1638 SuccessoreGirolamo Mattei Altri titoliPatrizio romano NascitaRoma, 1556 MorteRoma, 8 gennaio 1638 Luogo di sepolturaBasilica di Santa Maria in Aracoeli DinastiaMattei PadreAlessandro Mattei MadreEmilia Mazzatosta ConsorteEleonora RossiCostanza Gonzaga FigliPaoloGirolamoEleonoraMaria AnnaLuigiAlfonsoVittoriaVincenza ReligioneCattolicesimo Asdrubale Mattei (Roma, 1556 …

Disambiguazione – Se stai cercando altri significati, vedi Pernambuco (disambigua). Pernambucostato federato(PT) Estado de Pernambuco (dettagli) (dettagli) LocalizzazioneStato Brasile AmministrazioneCapoluogoRecife GovernatoreRaquel Lyra (PSDB) dal 2023 TerritorioCoordinatedel capoluogo8°03′14″S 34°52′51″W / 8.053889°S 34.880833°W-8.053889; -34.880833 (Pernambuco)Coordinate: 8°03′14″S 34°52′51″W / 8.053889°S 34.880833°…

Stasiun Ōishida大石田駅Bangunan Stasiun Oishida pada Oktober 2010Lokasi585 Ōishida-otsu, Ōishida, Kitamurayama District, YamagataJepangKoordinat38°35′44″N 140°22′31″E / 38.595689°N 140.375292°E / 38.595689; 140.375292Koordinat: 38°35′44″N 140°22′31″E / 38.595689°N 140.375292°E / 38.595689; 140.375292Operator JR EastJalur Yamagata Shinkansen ■ Jalur Utama Ōu Letak126.9 km dari FukushimaJumlah peron2 peron sisiInform…

Indonesian animated series This article is about Islamic religious animated series. For television series with same title that aired from 1999 to 2006, see Lorong Waktu (TV series). For scientific concept of traveling through time, see time travel. Lorong WaktuLorong Waktu poster on Vidio.comGenre Animation Science fiction Religion Comedy Based onLorong Waktu by Deddy MizwarWritten byAmiruddin OllandDirected by Deddy Mizwar Freddy Nindan Voices of Deddy Mizwar Santosa Amin Novalina Nasution Open…

Collective group of Roman Catholics martyrs BlessedMartyrs of Prague O.F.M.Martyrs, priests and religiousBornBetween 1541 and 1603VariousDied15 February 1611Prague, Kingdom of BohemiaBeatified13 October 2012, St. Vitus Cathedral, Prague, Czech Republic, by Cardinal Angelo Amato, S.D.B.Feast15 FebruaryAttributesFranciscan habitPalm branch Frederick Bachstein and his thirteen companions (born between 1541 and 1603 – died 15 February 1611) were a collective group of members, both priests and lay …

United States Army general This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Blackshear M. Bryan – news · newspapers · books · scholar · JSTOR (March 2021) (Learn how and when to remove this message) Blackshear M. BryanGeneral Blackshear M. BryanBorn(1900-02-08)February 8, 1900Alexandria, LouisianaDiedMarch 2, 19…

районХромтауский районХромтау ауданы 50°15′28″ с. ш. 58°26′08″ в. д.HGЯO Страна  Казахстан Входит в Актюбинскую область Адм. центр город Хромтау Аким Тлеумуратов Нурхан Жасуланович [1] История и география Дата образования 1935 Площадь 12 900 км² (7-е место) Часов…

Music producer and artist This biography of a living person relies too much on references to primary sources. Please help by adding secondary or tertiary sources. Contentious material about living persons that is unsourced or poorly sourced must be removed immediately, especially if potentially libelous or harmful.Find sources: Offrami – news · newspapers · books · scholar · JSTOR (February 2020) (Learn how and when to remove this message) OfframiBornRami…

Сельское поселение России (МО 2-го уровня)Новотитаровское сельское поселение Флаг[d] Герб 45°14′09″ с. ш. 38°58′16″ в. д.HGЯO Страна  Россия Субъект РФ Краснодарский край Район Динской Включает 4 населённых пункта Адм. центр Новотитаровская Глава сельского посел…

Kembali kehalaman sebelumnya