Energy in Croatia describes energy and electricity production, consumption and import in Croatia.
As of 2021, Croatia imported about 52.9% of the total energy consumed annually: 80% of its oil demand, 67% of its gas, 32.5% of its electricity and 100% of its coal needs.[1]
Croatia satisfies its electricity needs largely from hydro and thermal power plants, and partly from the Krško nuclear power plant, which is co-owned by Croatian and Slovenian state-owned power companies. Renewable energies account for approximately 28.5% of Croatia's energy mix.[1]
Electricity
Hrvatska elektroprivreda (HEP) is the national energy company charged with production, transmission and distribution of electricity.
Production
At the end of 2021, the total available power of power plants on the territory of the Republic of Croatia was 4,872.9 MW, of which 1,547.2 MW in thermal power plants, 2,200.5 MW in hydropower plants, 986.9 MW in wind power plants and 138.3 MW in solar power plants. For the needs of the electric power system of the Republic of Croatia, 348 MW from NPP Krško is also used (ie 50% of the total available power of the power plant in accordance with the ownership shares).[2]
The total production of electricity in the Republic of Croatia in 2022 was 14,220.5 GWh, whereby 63.7 percent (9,064.9 GWh) was produced from renewable energy sources, including large hydropower plants. In this percentage, large hydropower plants participated with 38.4 percent (5,454.2 GWh), and 25.4 percent (3,610.8 GWh) of electricity was produced from other renewable sources (wind energy, small hydropower plants, biomass, geothermal energy, biogas and photovoltaic systems). Domestic electricity production covered 75.2 percent (14,220.5 GWh) of electricity needs, which in 2022 amounted to 18,915.3 GWh. The import of electricity in 2022 amounted to 11,919.7 GWh, which is 63.0 percent of the total realized consumption. The export of electricity amounted to 7,224.9 GWh, which is 50.8 percent of the total domestic electricity production (14,220.5 GWh).[3]
Hydropower
Croatia has 28 hydropower plants of which 2 are reversible, 2 small size and 1 pumped storage. They are distributed in three production areas: North, West and South with one independent plant, and are HEP's most important source of renewable energy.[4]
Most of Croatian wind energy is produced by companies in private ownership for difference of other types of energy production. Out of 25 wind firms only one is owned by HEP (VE Korlat) while others are mainly owned by private companies or foreign energy coorporations.[5]
There are 7 thermal power plants of which 4 are also heating plants and one is combined cycle power plant.[12] Additionally, the first geothermal power plant was opened in 2019, but there are projects and potential for new ones.[13]
In 2014, HEP built nine solar power plants on the roofs of business buildings. The power plants are located in the office building at the headquarters of HEP in Zagreb and the buildings of the HEP Distribution System Operator. Solar power plants have the status of a privileged producer of electricity, which enables the sale of produced electricity to HROTE at a preferential price. Since 2018, Hrvatska elektroprivreda has started building integrated solar power plants according to the concept of a customer with its own production. This model enables a significant reduction in costs for own consumption of electricity. Most of the produced energy is consumed in the buildings themselves, while the rest of the energy is delivered to the distribution network.[19] HEP's first non-integrated power plant was SE Kaštelir, purchased in 2019 from a private producer, and the first independently built was SE Vis, commissioned in 2020.[20]
55 integrated SPP in the status of customer with own production
2.42
2018–present
Transmission
Croatian transmission grid consists of lines on three different rated voltage levels, namely 400, 220 and 110 kV. Total length of high-voltage lines is 7,763.53 km (4,824.03 mi) while length of medium and low voltage lines is 141,936.9 km (88,195.50 mi).[2]
The grid was often the target of attacks during Croatian War of Independence, resulting in frequent black-outs during the period. Since then, the grid has been repaired, and reconnected to synchronous grid of Continental Europe synchronous zones 1 and 2, making it an important transit system again.[24]
Distribution
Under the 2004 Energy law, customers in Croatia are allowed to choose their preferred distributor of electricity. However, HEP Operator distribucijskog sustava or HEP-ODS (a Hrvatska elektroprivreda subsidiary) remains the largest distributor to both industry and households. Its distribution grid is 142,365 km (88,461.51 mi) long, with 26 859 transformers installed, totaling 23,421 MVA of power.[25]
In 2021 there were 2,087,229 customers, 96.2% of which were households.[2]
Development projects
Hydropower
With the implementation of the project HE Senj 2, HEP intends to use the remaining hydro potential in the Lika and Gacka basins by upgrading the existing hydropower system. The project involves the construction of a large reservoir and additional capacity in order to transfer production to the top of the daily chart. This will enable the capacity to inject high regulatory power into the power system with flexible hydro units ready for rapid power change. The construction of the hydroelectric power plant will cost 3.4 billion kuna and will have an installed capacity of 412 MW, while the construction deadline is 2028.[26]
Wind energy
In 2023, Croatia had capacity of 1143 MW of Wind energy.[27] In July 2022, the Spanish company Acciona Energia announced an investment of one hundred million euros in the construction of two wind farms. One will be built in the vicinity of Split, and the other between Šibenik and Knin and will contain 16 wind turbines with a production of 203 GWh of clean electricity per year. The projects named Opor and Boraja 2 will be sufficient to supply 60 thousand households, and the propellers will start spinning at these locations in 2024, after a year and a half of construction and testing. This will avoid the annual emission of 135,000 tons of CO2. In 2013, the same company built the Jelinak wind park worth 48 million euros.[28]
The European Bank for Reconstruction and Development (EBRD) will grant a loan of EUR 43 million to the company Kunovac, jointly owned by the funds Taaleri Energia SolarWind II and ENCRO Kunovac, for the construction and operation of two onshore wind farms in the Zadar region. Zagrebačka banka and Croatian bank for reconstruction and development will participate in the financing with a total loan amount of 126 million euros, and the total network capacity of the two power plants is 111 megawatts, which is enough to power 85,000 households.[29]
In January 2023, the Greek energy company EuroEnergy announced that it was taking over the 114 MW wind farm project in Lika-Senj County. The acquisition reserves the right to expand with an additional 70.5 MW of wind capacity, subject to grid upgrades that can increase production. The value of the project is EUR 150 million and will be realized in the area of Udbina.[30]
The action plan for renewable energy sources at sea is the first comprehensive study that looks at the possibilities of renewable energy development in the Adriatic, and it was financed by the European Bank for Reconstruction and Development. The study considered two technologies: wind farms (stationary and floating) and floating solar farms. Through a spatial analysis of numerous ecological and other technical parameters, the experts came up with data on the possibility of RES development in five zones with an area of 1,260 square kilometers, of which 204 km2 is within the territorial sea. It has been calculated that a 25 GW RES power plant could be installed on that surface. If the area where the medium impact on the landscape is assessed is added to that area, the possible area for RES increases to an additional 1,602 km2 and 44 GW. The development of offshore wind farms in these zones depends on concession agreements between INA and the Republic of Croatia. Also, if hydrocarbon exploitation areas in the central and southern Adriatic are added to that area, a possible 26,000 square kilometers for floating wind power plants and solar power plants will be reached, due to greater depth.[31]
Thermal power
In December 2019, the project of building a new high-efficiency combi-cogeneration unit KKE EL-TO Zagreb began, electric power 150 MW. The construction lasts for three years, and this project will replace part of the dilapidated and obsolete units at the EL-TO Zagreb location.[32] It is expected for a unit to start working in the summer of 2023.
Nuclear power
In 1978, the Adriatic island of Vir was selected as a location for a future nuclear power plant, but these plans were abandoned.[33]
According to reports, since 2009 Croatia has been discussing the option of building a nuclear power plant with Albania, in a location on the shore of Shkodër Lake, on the border with Albania and Montenegro. In April 2009 the Croatian government denied that any agreement had been signed.[34]
In a 2012 poll among 447 Croatian citizens, who were asked "Do you think it is justified to use nuclear energy for the production of electricity?", 42% answered "yes" and 44% answered "no".[35]
In 2021 the Slovenian government has issued an energy permit to GEN Energija for the planning and construction of the second unit of the Krško Nuclear Power Plant, followed by a statement by the Minister of Economy and Sustainable Development of CroatiaTomislav Ćorić that Croatia "will not look benevolently at the construction of the new bloc".[36] In March 2022, Plenković confirmed Croatia's readiness to enter the project of building the second block of the Krško NPP.[37]
Solar power
As of 2021, Croatia had 100 MW of solar power, providing 0.4% of electricity. The potential for solar energy in Croatia is estimated at 6.8 GW, of which 5.3 GW would be accounted for by utility-scale photovoltaic plants and 1.5 GW by rooftop solar systems.[38] Croatia plans to install 1.5 GW of solar capacity by 2024.[39] The total solar power grid-connected capacity in Croatia was 461 MW as 2023.[40]
In May 2023, Acciona Energy announced the construction of the largest solar power plant in Croatia. The new power plant will be spread over three million square meters of rugged state land and will have a capacity of 150 MW, which is enough to meet the needs of around 100,000 households. Its official name is SE Promina.[9]
Battery storage
In September 2022, the European Commission approved state support in the amount of 19.8 million euros for the project of building a large-capacity battery system. The project will be built in Šibenik, and will enter into operation in 2023 with a capacity of 10 MW, and ultimately the capacity will be 50 MW.[41]
Geothermal energy
The results of the geothermal potential research showed that the Virovitica-Podravina County lies on a geothermal basin. The value of the Geothermal Potential Research project in Virovitica-Podravine County, which began in 2019, amounts to 304,169 euros. Therefore, the construction of a geothermal power plant with a capacity of 20 megawatts is planned in that area, which has the potential to become the largest such power plant in Europe. It is designed up to 1,300 meters, and hot water is expected already at 600 meters. An exploratory well was completed in the area of Čađavica, which discovered a geothermal source at a depth of 4,300 meters. The areas of Orahovica, Slatina and Nova Bukovica also have geothermal potential.[42]
^"Energija u Hrvatskoj 2022"(PDF). Energetski institut Hrvoje Požar (in Croatian and English). Ministry of Economy and Sustainable Development, Republic of Croatia. ISSN1848-1787. Retrieved 22 February 2024.
^"Hidroelektrane" [Hydropower plants]. HEP Proizvodnja (in Croatian). Retrieved 30 March 2022.
Macuahuitl Hasil reka ulang macuahuitl dari zaman modern Jenis Macuahuitl Negara asal Meksiko Sejarah pemakaian Masa penggunaan Klasik hingga Pascaklasik (900–1570) Digunakan oleh Peradaban-peradaban Mesoamerika, termasuk AztekPasukan Indian Imperium Spanyol[1] Pada perang Perluasan wilayah Aztek, peperangan di MesoamerikaPenaklukan Kekaisaran Aztek oleh Spanyol Spesifikasi Berat 2,0–3,0 kg Panjang 90–120 cm Tipe pedang Lurus, tebal, bermata dua, lancip Jen…
Koin. Bolesław-Jerzy II (1305/1310 – 7 April 1340) merupakan penguasa Polandia yang berasal dari Wangsa Piast yang pemerintahan aslinya di Kerajaan Rutenia, Galisia. Setelah kematiannya Pertempuran Halych-Volynia dimulai atas suksesi Halych-Volynia. Bolesław lahir pada sekitar tahun 1305 dan 1310.[1] Ayahandanya adalah Trojden I dari Wangsa Piast, Adipati Czersk dan Maria, putri Yuri I, pangeran Galisia. Karena ayahandanya masih menjadi seorang penguasa di dalam tanah-tanah Masovia, …
Biografi ini tidak memiliki sumber tepercaya sehingga isinya tidak dapat dipastikan. Bantu memperbaiki artikel ini dengan menambahkan sumber tepercaya. Materi kontroversial atau trivial yang sumbernya tidak memadai atau tidak bisa dipercaya harus segera dihapus.Cari sumber: Aninditha Cahyadi – berita · surat kabar · buku · cendekiawan · JSTOR (Pelajari cara dan kapan saatnya untuk menghapus pesan templat ini) Aninditha Rahma CahyadiLahirAninditha Rahma Ca…
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada September 2016. Nathaniël Will Informasi pribadiNama lengkap Nathaniël WillTanggal lahir 16 Februari 1989 (umur 35)Tempat lahir Lelystad, BelandaTinggi 1,77 m (5 ft 9+1⁄2 in)Posisi bermain BekInformasi klubKlub saat ini NECNomor 2Karier juni…
Bendera kehormatan Kepala staf militer Prancis Kepala staf militer (Prancis: Chef d'état-major de l'armée de terrecode: fr is deprecated ,[a] CEMAT)[1] merupakan sebuah jabatan kepala militer Angkatan Darat Prancis.[2] Jabatan ini berfungsi mengarahkan staf Angkatan Darat dan bertindak sebagai penasihat utama Kepala staf pertahanan dalam hal-hal yang berhubungan dengan Angkatan Darat.[3] Karena itu, mereka memastikan kesiapan operasional cabang layanan mereka, m…
Keuskupan Agung Kota Hồ Chí MinhArchidiœcesis HochiminhopolitanaTổng Giáo phận Thành Phố Hồ Chí MinhKatolik Katedral Kota Ho Chi MinhLambang Keuskupan Agung Kota Hồ Chí MinhLokasiNegaraVietnamProvinsi gerejawiKota Hồ Chí MinhSufraganDaftar Bà RịaCần ThơÐà LạtLong XuyênMỹ ThoPhan ThiếtPhú CườngVĩnh LongXuân LộcDekanatDaftar Bình AnChí HoàGia ĐịnhGò VấpHóc MônPhú NhuậnPhú ThọSài Gòn Chợ QuánTân ĐịnhTân Sơn Nhì…
Christina Rossetti, potret karya saudaranya Dunia Kedinginan atau In the Bleak Midwinter adalah sebuah kidung Natal yang berdasarkan pada sebuah syair karya penyait Inggris Christina Rossetti. Dengan judul A Christmas Carol, syair tersebut diterbitkan dalam edisi Januari 1872 dari Scribner's Monthly.[1][2] Referensi ^ Petersen, Randy (2014). Be Still, My Soul: The Inspiring Stories behind 175 of the Most-Loved Hymns. Tyndale House Publishers, Inc. hlm. 145. ISBN 9781414…
Dongmenying 东门营DesaGerbang desaNegaraRepublik Rakyat TiongkokMunisipalitasBeijingDistrikDistrik YanqingDaerah administrasi kota prajaZhangshanyingPopulasi • Total970 Dongmenying (Hanzi: 东门营) adalah sebuah desa berpenduduk 970 orang di Distrik Yanqing, Beijing, Tiongkok. Tahun 2018, desa ini masuk dalam daftar 44 desa di Beijing yang ditetapkan sebagai desa tradisional dan harus dilindungi.[1] Pariwisata Kuil Zhenwu. Desa ini merupakan desa terdekat dengan Gua …
Kejuaraan Nasional Squash 2022OlahragaSquashDurasi19–23 Oktober 2022 (2022-10-23)Jumlah penontonDengan penontonMusim Kejuaraan Nasional Squash← 20212023 → Kejuaraan Nasional Squash 2022 adalah musim kedua Kejuaraan Nasional Squash, kompetisi squash kasta tertinggi di Indonesia. Kompetisi ini berlangsung sejak 19 Oktober 2022 hingga selesai pada 23 Oktober 2022. Kompetisi ini diselenggarakan di satu tempat, yaitu Lapangan Squash GBK, Senayan, Jakarta.[1] Squash ini ak…
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada November 2022. Huseyincan CelilHuseyincan Celil (Hussayin Jelil)2001, Istanbul, Turki.Lahir1 Maret 1969Kashgar, Tiongkok Huseyincan Celil (lahir 1 Maret 1969) adalah seorang Uighur yang memegang kewarganegaraan Tiongkok dan Kanada. Ia menjadi subyek kasus pengadilan ko…
KuinginAlbum studio karya The GrooveDirilisJuli 1999GenreFunk, jazz, pop, acid jazzLabelSony Music Entertainment IndonesiaKronologi The Groove Kuingin (1999) Mata, Telinga dan Hati (2001)Mata, Telinga dan Hati2001 Kuingin merupakan sebuah album musik pertama karya The Groove. Dirilis pada tahun 1999. Lagu utamanya ialah Dahulu dan Satu Mimpiku.[1] Daftar lagu Dahulu Kuingin Satu Mimpiku Gadisku Mama Funkier Than Ever Kuasa Cinta B A F Segenap Cintamu Bila Trivia Lagu Dahulu juga diny…
Niki CaroLahirNikola Jean Caro1967Wellington, Selandia BaruKebangsaanSelandia BaruAlmamaterUniversity of AucklandSwinburne University of TechnologyPekerjaanSutradara film, penulis naskahTahun aktif1984–sekarangKarya terkenalWhale RiderThe Zookeeper's WifeSuami/istriAndrew ListerAnak2 Nikola Jean Niki Caro MNZM (lahir 20 September 1966) adalah seorang sutradara dan penulis naskah. Film tahun 2002 buatannya Whale Rider meraih pujian kritis dan memenangkan sejumlah penghargaan di festival-fe…
Halaman ini berisi artikel tentang merek bir. Untuk perusahaan yang membuatnya, lihat Perusahaan Bir Taedonggang. Untuk sungai di Korea Utara, lihat Sungai Taedong. Untuk distrik di Pyongyang, lihat Taedonggang-guyok. Untuk stasiun kereta api, lihat Stasiun Taedonggang. JenisLagerProdusenPerusahaan Bir TaedonggangNegara asalKorea UtaraDiperkenalkan2002Alkohol menurut volume5%[1]WarnaJingga keemasan[2]Rasalager bertekstur penuh sedikit di sisi manis, dengan sisa rasa yang sedikit …
جداريَّة تصور مراحل من حياة يسوع بحسب رواية العهد الجديد. نظرة العهد الجديد لحياة المسيح أو حياة يسوع بحسب العهد الجديد وفقاً للعهد جديد فأن: يسوع المسيح ولد في بيت لحم كما توجب أن يولد بحسب ما تنبأ عنه النبي ميخا. تذكر الاناجيل الأربعة: متى، مرقس، لوقا، ويوحنا شهادات حية مما …
Basilika Katedral Primatial Maria Dikandung Tanpa Noda, Bogotá Ini adalah daftar lengkap Basilika di Kolombia. Basilika adalah gelar yang diberikan kepada beberapa gereja Katolik. Berdasarkan hukum kanonik tidak ada gereja Katolik yang dapat dihormati dengan gelar basilika kecuali mendapatkan hibah apostolik atau berdasarkan kebiasaan dahulu kala.[1] Gelar ini diberikan kepada gereja-gereja besar yang penting sebagai tempat ziarah atau untuk pengabdian tertentu seperti kepada orang suci…
Denis O'HareDi penayangan perdana An Englishman in New York, Festival Film Tribeca, 2009LahirDenis Patrick Seamus O'Hare[1]17 Januari 1962 (umur 62)Kansas City, Missouri, ASAlmamaterNorthwestern University School of CommunicationPekerjaan Pemeran Penyanyi Pengarang Tahun aktif1982–sekarangSuami/istriHugo Redwood (m. 2024)Anak1Situs webdenisohare.com Denis Patrick Seamus O'Hare (lahir 17 Januari 1962) adalah seorang pemeran Amerika yang dikenal a…
Eurovision Song Contest's Greatest Hits Dates Finale 31 mars 2015 (enregistrement) Retransmission Lieu Eventim Apollo, Londres Royaume-Uni Présentateur(s) Graham NortonPetra Mede Superviseur exécutif Jon Ola Sand Télédiffuseur hôte UER, BBC Entracte Riverdance Participants Nombre de participants 16 chansons de 1973 à 2014 Pays diffuseurs Pays avec diffusion incertaine Pays ayant décliné la diffusion Résultat Congratulations : 50 ans du Concours Eurovision de la chanson Eurovisi…
British Labour politician (1887–1962) The Right HonourableThe Lord DaltonPCDalton in 1940Chancellor of the Duchy of LancasterIn office31 May 1948 – 28 February 1950Prime MinisterClement AttleePreceded byThe Lord PakenhamSucceeded byA. V. AlexanderChancellor of the ExchequerIn office27 July 1945 – 13 November 1947Prime MinisterClement AttleePreceded byJohn AndersonSucceeded byStafford CrippsPresident of the Board of TradeIn office22 February 1942 – 23 May 1945Pr…
Moto3KategoriBalap motorNegara atau daerahInternasionalMusim pertama2012Tim15PabrikanGasGas, KTM, Honda, HusqvarnaPemasok banDunlopJuara rider Pedro AcostaJuara konstruktor KTMSitus webMotoGP.com Musim saat ini Kejuaraan Dunia Moto3 (atau biasa disebut Moto3 saja atau nama resminya FIM Moto3 World Championship) merupakan sebuah seri atau kelas dari Grand Prix Sepeda Motor. Kelas Moto3 mulai diperlombakan di musim 2012 dengan adanya perubahan regulasi untuk kelas 125cc. Kelas ini merupakan kelas …
InkigayoLogo digunakan sejak Juni 2022GenreMusik, HiburanPresenterChoi Yeon-junWoonhakPark Ji-huNegara asalKorea SelatanBahasa asliKoreaJmlh. episode1.221 (per 31 Maret 2024)ProduksiLokasi produksiSBS Open HallDurasi70 menitRilis asliJaringanSBS (siaran langsung)SBS M (siaran tunda)SBS funE (siaran tunda)Myx TV (Amerika Serikat)One (Asia Tenggara)Moji (Indonesia)Format gambar1080iFormat audioStereoRilis15 Desember 1991 –17 Oktober 19931 Februari 1998–sekarang Nama KoreaHangulSBS 인기…