You can help expand this article with text translated from the corresponding article in Korean. (September 2022) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Korean Wikipedia article at [[:ko:경인선]]; see its history for attribution.
You may also add the template {{Translated|ko|경인선}} to the talk page.
The Gyeongin Line was the first railway line built on the Korean peninsula. It was opened by the Keijin Railway Company between Noryangjin, on the shore of the Han River across from Seoul, Geumchon, in Incheon, on September 18, 1899.[2] Soon after, the line was extended across the Han River into Seoul Station, and beyond Geumchon to the port of Incheon. When the construction of the Gyeongbu Line was completed from Busan to Guro on January 1, 1905, the Seoul-Guro section of the Gyeongin Line became part of the Gyeongbu Line.[2] The remaining Gyeongin Line from Guro to Incheon is 27.0 km (16.8 mi) long.[2]
Following the 1961 coup, the Supreme Council for National Reconstruction started South Korea's first five-year plan, which included a construction program to complete the railway network, to foster economic growth.[3] As part of the program, from November 1963, two additional tracks were laid to the north of the existing tracks from Yeongdeungpo station on the Gyeongbu Line to Dongincheon station.[3] The 27.8 km (17.3 mi) of new tracks, also called Gyeonginbuk Line, entered service on September 18, 1965.[3]
The line was among the first in South Korea to be electrified with the 25 kV/60 Hz ACcatenary system, when two tracks over the 38.9 km (24.2 mi) between Seoul and Incheon entered service on August 15, 1974, for the Seoul Subway Line 1.[4] Electrification of the second two tracks started with the 14.9 km (9.3 mi) from Guro to Bupyeong, which went into service on January 29, 1999.[4] The 5.6 km (3.5 mi) until Juan followed on March 15, 2002, and the final 6.6 km (4.1 mi) on December 21, 2005.[4]
Operation
Korail operated regular passenger service along the Gyeongin Line until the electrification of the line in the early 1970s, when passenger service was integrated into Seoul Subway Line 1. Line 1 trains using the Gyeongin Line provide up to ten trains an hour per direction, with services towards Guro, Cheongnyangni, Dongmyo, Seongbuk, Chang-dong, Uijeongbu, Yangju, Dongducheon and Soyosan.[5]