Although the Ring Rail Line opened on 1 July 2015, the airport railway station opened only on 10 July 2015, and only the Tietotie exit was accessible at this time. Because the exit was the one farther away from the terminal, a temporary shuttle bus was operated until the elevators for the passenger terminal-side exit were completed in December 2015.[2] The escalators for the terminal-side exit were finally brought into use on 17 March 2016.[3]
Future proposals
As part of ongoing plans for high-speed rail in Finland, Helsinki Airport station would be linked to Helsinki Central via a direct tunnel (a project known as Lentorata), surfacing at Kerava and continuing to Tampere Central, at an estimated cost of €5.5 billion.[4]