ISRO metro station

ISRO
Namma Metro station
Under Construction of this metro station as of October 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationLRDE Layout, Doddanekundi Bengaluru, Karnataka 560037
Coordinates12°58′08″N 77°42′04″E / 12.96900°N 77.70115°E / 12.96900; 77.70115
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeISRO (TBC)
History
OpeningJune 2026; 18 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Marathahalli Blue Line
(Future Service)
Doddanekundi
Location
Map

ISRO is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro serves mainly the Doddanekundi area, which comprises the ISRO Assembly Integration & Testing Centre in South Bengaluru and the Outer Ring Road, which leads towards Krishnarajapuram in the north and Bellandur in the south. This metro station is slated to become operational around June 2026.[2][3][4][5]

History

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the ISRO metro station, part of the 8.377 km Reach 2A – Package 2 (Kodibeesanahalli - Krishnarajapura) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Station Layout - To Be Confirmed

ISRO track layout (TBC)
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Central Silk Board
Next Station: Marathahalli
Platform #
Northbound
Towards ← Krishnarajapura / KIAL Terminals
Next Station: Doddanekundi
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

References

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. ^ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.