Railway line in Suzhou, Jiangsu, China
Line 2 A train of Suzhou Rail Transit Line 2
Status In operation Owner Suzhou Rail Transit Co., Ltd Termini Stations total 35 stations first phase: 22 stations (6 Elevated Stations, 16 Underground Stations) second phase: 13 stations Type Rapid transit System Suzhou Rail Transit Operator(s) Suzhou Rail Transit Co., Ltd Opened December 28, 2013; 11 years ago (2013-12-28 ) Line length 40.4 km (25.1 mi) Number of tracks 2 Character Elevated and Underground Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in )Electrification overhead wire
Line 2 is a north-south line of Suzhou Rail Transit . It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.
History
The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Suzhou North Railway Station to Baodaiqiao South (宝带桥南 ) near Baodai Bridge started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.[ 1]
The 14.347 km (8.915 mi) second phase, running from Qihe to Fuxiang Lu in the north, and from Yinzhong Lu (尹中路 ) to Sangtiandao (桑田岛 ) in the east, commenced trial operations on September 24, 2016.[ 2]
A north extension to Aigehao Road is under construction, and it's expected to open in 2026.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Suzhou North Railway Station — Baodaiqiao South
28 December 2013
26.557 km (16.50 mi)
22
Phase 1
Qihe — Suzhou North Railway Station
24 September 2016
2.2 km (1.37 mi)
2
Phase 2
Baodaiqiao South — Sangtiandao
11.643 km (7.23 mi)
11
Stations
Interchange signage in Guangji Nanlu station
Platform of Dushuhu Neighborhood Center station
Operations
Intervals
Weekdays & Weekends
Period
Time
Intervals
Weekdays morning rush hours (Peak)
7:45 — 9:00
6m10s
Weekdays evening rush hours (Peak)
17:00 — 19:00
6m10s
Weekends daily rush hours (Peak)
11:00 — 20:40
6m10s
Other hours (Normal)
Exclude above rush hours
6m50s
[ 3]
Rolling stock
Fleet numbers
Year Built
Time in service
Builder
Class
Number in service
No of car
Assembly
Rolling stock
Number
Depots
Line assigned
Notes
105 (23 sets)
2013-2015
2014-present
CSR Nanjing Puzhen
B
105 (23 sets)
5
Tc+Mp+M + Mp+Tc
PM061
020101-022305 (0201-0223)
Taiping Yard
2
85 (17 sets)
2014-2016
2016-present
CSR Nanjing Puzhen
B
85 (17 sets)
5
Tc+Mp+M + Mp+Tc
PM080
022401-024005 (0224-0240)
Taiping Yard
2
100 (20 sets)
2022-2023
2023-present
CRRC Nanjing Puzhen
B
100 (20 sets)
5
Tc+Mp+M + Mp+Tc
PM208
022501-026005 (0225-0260)
Taiping Yard
2
References
Line 2 Stations that are proposed, under planning or under construction are shown in italics .
Public transportation in Jiangsu (JS)
Nanjing Metro
Lines in operation Under construction
3 (Phase 3)
4 (Phase 2)
5 (North section)
6
9
10 (Phase 2)
11
S2
S4 (Nanjing section)
S5
Under planning
2 (eastern extension)
3 (Phase 4)
4 (Phase 3)
8
9 (Phase 2)
10 (Phase 3)
16
18
S3 (eastern extension)
S6 (western extension)
Suzhou RT
Lines in operation Under construction
2 (northern extension)
4 (northern extension)
7 (northern extension)
10 (S5)
Under planning
Wuxi Metro
Lines in operation Under construction
S2
4 (Phase 2)
5 (Phase 1)
6 (Phase 1)
Under planning
2 anzhen
5 (Phase 2)
6 (Phase 2)
3 (North extension)
3 (South extension)
3 Branch line
4 (Phase 3)
7
8
Changzhou Metro
Lines in operation Under construction Under planning
Xuzhou Metro
Lines in operation Under construction Under planning
Nantong RT
Shanghai Metro (Jiangsu Section)
Shanghai Suburban Railway (Jiangsu Section)
LRT & trams
Transportation hubs
Int'l airports Railway stations