The network is planned to contain six lines, with the first section of MRT Line 6 commencing commercial operations on 29 December 2022, and the other lines being either in planning or under construction.[3][4] The construction of MRT Line 6's second section is scheduled to be completed during 2023.[5] The third phase, which will have an interchange with Line 1, Line 2 and Line 4, is set to be completed by 2026.[6][7][8] Further expansion of MRT Line 6 is planned, with the hope of extending it towards Tongi in Gazipur metropolitan and Savar Upazila. The fares range from minimum ৳20 to maximum ৳100 (for MRT line 6). Passengers can get 10% discount for paying fares on either MRT pass or Rapid Pass. Each of the cards has same facilities.[9]
Lines
Line(s)
Number of Stations
Planned Stations
Structure
Opening date
1
0
21
12 Under Ground 9 Elevated
Planned
2
0
25
Unknown
Planned
4
0
8
Unknown
Planned
5
0
29
Under Ground and Elevated
Unknown
6
16
17
Elevated
2022
Total:
N/A
N/A
Operational stations
This list is sortable. Click on the icon in the column header to change sort key and sort order.