Project name
Sponsoring company
Coordinates
Capacity (MW)
Status
Notes
Canunda Wind Farm
Engie /Mitsui
37°41′49″S 140°22′44″E / 37.697°S 140.379°E / -37.697; 140.379 (Canunda )
46
Operating
Cathedral Rocks Wind Farm
EnergyAustralia/Acciona
34°46′S 135°32′E / 34.76°S 135.54°E / -34.76; 135.54 (Cathedral Rocks )
66
Operating
Clements Gap Wind Farm
Pacific Hydro
33°30′00″S 138°06′00″E / 33.500°S 138.100°E / -33.500; 138.100 (Clements Gap )
56.7
Operating
Opened February 2010[ 2]
Goyder Renewables Zone
Neoen
33°42′S 139°00′E / 33.7°S 139.0°E / -33.7; 139.0 (Goyder Renewable Zone (proposed) )
412.5
Under construction
Goyder South development application released August 2020[ 3] Goyder South application approved in May 2021.[ 4] Early works began in December 2021[ 5] Stage 1 (412.5 MW)
Hallett Wind Farm
AGL Energy
33°23′42″S 138°50′24″E / 33.395°S 138.840°E / -33.395; 138.840 (Brown Hill )
350.7
Operating
Hallett 1 (94.5 MW), Hallett 2 (71.4 MW), Hallett 4 (132.3 MW), Hallett 5 (52.5 MW). Hallett 3 (95 MW) was cancelled.
Hornsdale Wind Farm
Neoen and Megawatt Capital
33°03′29″S 138°32′38″E / 33.058°S 138.544°E / -33.058; 138.544 (Hornsdale )
316.8
Operating
Stage 1 (102.4 MW), 2 (102.4 MW) and 3 (112 MW).
Lake Bonney Wind Farm
Infigen
37°46′S 140°24′E / 37.76°S 140.4°E / -37.76; 140.4 (Lake Bonney )
278.5
Operating
Stage 1 (80.5 MW), 2 (159 MW) and 3 (39 MW).
Lincoln Gap Wind Farm
Nexif Energy
32°37′08″S 137°34′48″E / 32.619°S 137.580°E / -32.619; 137.580 (Lincoln Gap )
212.4
Operating
[ 6] 59 3.6MW turbines. Stage 1 (35 turbines - 126 MW) Completed.
Stage 2 (24 turbines - 86.4 MW) completed in 2022.[ 7]
Mount Millar Wind Farm (Yabmana)
Meridian Energy
33°42′S 136°44′E / 33.70°S 136.74°E / -33.70; 136.74 (Mount Millar )
70
Operating
[ 8]
Port Augusta Renewable Energy Park
Iberdrola
32°34′01″S 137°51′22″E / 32.56694°S 137.85611°E / -32.56694; 137.85611 (Port Augusta Renewable Energy Park (U/C) )
210
Operating[ 9]
Hybrid facility, 210 MW wind, 107 MW solar[ 10]
Snowtown Wind Farm
Tilt Renewables
33°41′S 138°08′E / 33.69°S 138.13°E / -33.69; 138.13 (Snowtown )
368.7
Operating
Stage I & II
Starfish Hill Wind Farm
RATCH-Australia
35°35′02″S 138°08′13″E / 35.584°S 138.137°E / -35.584; 138.137 (Starfish Hill )
33
Operating
Waterloo Wind Farm
EnergyAustralia
34°00′00″S 138°54′00″E / 34.000°S 138.900°E / -34.000; 138.900 (Waterloo )
130.8
Operating
Originally built as 111 MW (2010), upgraded to 130.8 MW (2016).
Wattle Point Wind Farm
Infrastructure Capital
35°05′42″S 137°43′44″E / 35.095°S 137.729°E / -35.095; 137.729 (Wattle Point )
90.75
Operating
Willogoleche Wind Farm
Engie
33°23′35″S 138°50′53″E / 33.393°S 138.848°E / -33.393; 138.848 (Willogoleche )
119
Operating
Operating as of 2019.[ 11]
Keyneton
Pacific Hydro
34°34′S 139°13′E / 34.57°S 139.22°E / -34.57; 139.22 (Keyneton (cancelled) )
105[ 12]
Cancelled
Development was required to have commenced by 29 November 2019 and completed by 29 November 2021.[ 13] Expected to produce 325GWh/year.Pacific Hydro cancelled the project in October 2019 when it could not receive a time extension.[ 14]
Elliston Stages 1, 2 and 3 (Tungketta Hill)
Ausker Energies & ANZ Infra Services
33°39′00″S 134°53′24″E / 33.650°S 134.890°E / -33.650; 134.890 (Elliston/Tungketta Hill (proposed) )
200
Planning approval lapsed, new proposal in progress[ 15]
[ 16]
Green Point
Wind Prospect
38°00′S 140°50′E / 38.00°S 140.84°E / -38.00; 140.84 (Green Point (cancelled) )
44
Cancelled
Cancelled 2013[ 17]
Carmody's Hill[ 18]
Pacific Hydro
33°22′S 138°29′E / 33.37°S 138.48°E / -33.37; 138.48 (Carmody's Hill (cancelled) )
175
Possibly cancelled
Planning approval lapsed in 2013[ 19]
Myponga Wind Farm
TrustPower
35°24′00″S 138°27′18″E / 35.400°S 138.455°E / -35.400; 138.455 (Myponga (cancelled) )
35
Cancelled
[ 20]
Vincent North (Sheaoak Flat )
Pacific Hydro
34°42′S 137°48′E / 34.7°S 137.8°E / -34.7; 137.8 (Vincent North (cancelled) )
59
Cancelled
Planning approved in 2004[ 21] extended for two more years in 2008[ 22] Planning approval lapsed 2010[ 23]
Troubridge Point (also known as Wattle Point stage 2)
Origin Energy
35°10′S 137°40′E / 35.16°S 137.67°E / -35.16; 137.67 (Troubridge Point (cancelled) )
30
Cancelled
Wind Prospect sold to Origin Energy in 2004,[ 24] seems to have lapsed by 2008.[ 25]
Ceres
Spark Renewables
34°35′S 137°46′E / 34.58°S 137.77°E / -34.58; 137.77 (Ceres (proposed) )
600
Proposed
Acquired in May 2022[ 26]
Kemmiss Hill
Origin Energy
35°35′S 138°10′E / 35.58°S 138.16°E / -35.58; 138.16 (Kemmiss Hill (cancelled) )
30
Cancelled
Refused planning consent[ 27]
Waitpinga
Waitpinga Wind Farm Pty. Ltd.
35°35′42″S 138°30′18″E / 35.595°S 138.505°E / -35.595; 138.505 (Waitpinga (cancelled) )
50
Cancelled
Application rejected 2005[ 28]
Woakwine
Beacon Energy
37°22′30″S 140°01′48″E / 37.375°S 140.030°E / -37.375; 140.030 (Woakwine )
400
Possibly cancelled
[ 29]
Barn Hill (Red Hill)
RATCH-Australia
33°34′30″S 138°03′36″E / 33.575°S 138.060°E / -33.575; 138.060 (Barn Hill )
120
Possibly cancelled
Not present on website as of September 2021.[ 30]
Kongorong
RATCH-Australia
37°54′00″S 140°33′54″E / 37.900°S 140.565°E / -37.900; 140.565 (Kongorong )
30
Possibly cancelled
Listed as another development of RATCH-Australia in October 2016,[ 31] no longer appears on website as of September 2021.[ 30]
Kulpara
RATCH-Australia
100
Possibly cancelled
Listed as another development of RATCH-Australia in October 2016,[ 31] no longer appears on website as of September 2021.[ 30]
Palmer
Tilt Renewables
34°49′S 139°08′E / 34.81°S 139.13°E / -34.81; 139.13 (Palmer )
300
Development approved
Final appeal against development approval overturned November 2019[ 32] [ 33] Still progressing as of April 2021.[ 34]
Twin Creek Wind Farm
RES Australia
34°18′S 139°03′E / 34.30°S 139.05°E / -34.30; 139.05 (Twin Creek )
183
Development approval[ 35]
[ 36]