Msikaba Bridge
Msikaba Bridge | |
|---|---|
| Coordinates | 31°17′45.07″S 29°47′35.74″E / 31.2958528°S 29.7932611°E |
| Carries | |
| Crosses | Msikaba River |
| Locale | Lusikisiki, Eastern Cape, South Africa |
| Characteristics | |
| Design | Cable-stayed steel deck |
| History | |
| Construction cost | R1.65 billion[1] |
| Opened | Expected End of 2025[2][needs update] |
| Inaugurated | November 2017 |
| Location | |
![]() Interactive map of Msikaba Bridge | |
The Msikaba Bridge is a cable-stayed steel deck bridge, currently under construction, spanning the Msikaba River, near Lusikisiki in the Eastern Cape of South Africa. The Msikaba Bridge forms part of the N2 Wild Coast road (N2WC) project, which aims to improve the travel time between Durban and East London for heavy freight vehicles.[2]
The making of this epic bridge was shown in the National Geographic show "Building Impossible With Daniel Ashville" in Episode 2 of Season 1.[3]
Bridge design
Designed by the Danish firm Dissing+Weitling, the bridge when complete will have a main span of 580m supported from a pair of 127m-tall pylons. The deck will be 194m above the valley floor, making it the third highest bridge in Africa.[4]

Contract award
In 2017 the South African National Roads Agency (SANRAL) awarded the tender for the bridge's construction to the Concor Mota-Engil Joint Venture (CMEJV), which comprises Concor, a South African-based construction company, and Mota-Engil, a Portuguese construction company at a cost of US$118 million.[5]
Construction timeline
It is estimated that 28 000 cubic metres of concrete, 2 700 tons of structural steel and 2 500 tons of cables will be needed during construction. The balance of works contained in the contract which includes construction of 1,5 km of approach roadworks on either side of the bridge. Expressed in quantities, this will include 650,000 m³ of bulk earthworks of which 430,000 m³ is hard rock, a conventional three span bridge and four in-situ concrete culverts crossing some of the tributaries.[6][7][4][8] A temporary gondola lift system will reduce travel time between opposite sides of the bridge during construction.[9]


See also
References
- ^ "Mtentu bridge to cost Sanral R1.65bn". Retrieved 6 January 2018.
- ^ a b "A look at South Africa's new mega bridge – under construction in the Eastern Cape". Retrieved 20 August 2023.
- ^ Channel, National Geographic. "Building Impossible with Daniel Ashville Microsite". www.natgeotv.com. Retrieved 10 October 2023.
- ^ a b Venter, Irma. "Work resumes on N2 Msikaba bridge project". www.engineeringnews.co.za.
- ^ https://businesstech.co.za/news/business/743953/r5-8-billion-mega-bridges-for-south-africa-taking-shape/
- ^ Shem Oirere. "Msikaba Span Contract Let By South Africa Road Agency | 2018-10-17 | Engineering News-Record". Enr.com. Retrieved 10 November 2020.
- ^ "Construction of Msikaba Bridge resumes - Bridge Design & Engineering (Bd & e)". www.bridgeweb.com. 26 May 2020.
- ^ "Progress being made on South Africa's R1.6 billion mega-bridge".
- ^ Arnoldi, Marleny (6 July 201). "Sanral to install cable car for staff at Msikaba". Engineering News. Creamer Media. Retrieved 17 August 2021.
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.