A multi-system locomotive, also known as a multi-system electric locomotive, multi-system electric multiple unit, or multi-system train, is an electric locomotive which can operate using more than one railway electrification system. Multi-system trains provide continuous journeys over routes which are electrified using more than one system.
Reasons
A multi-system locomotive is useful for providing a single journey over multiple electrification systems without interruption, either from requiring passengers to change trains or from changing locomotives. Such conditions can occur where a train crosses national boundaries and each country has implemented a different electrification system.[1]
Examples
European Union
Prior to 1945 there was no demand for multi-system locomotives in Europe. From the 1950s onwards, the emerging formation of the European Union, and the consequent increase in the amount of cross border traffic, along with the addition of a 25 kV 50 Hz AC system in France in addition to the older 1.5 kV DC system, gave rise to the need for multi-voltage locomotives.[2] Very high capital costs prevent or hinder the adoption of a standard railway electrification system.[3]
At the beginning of the 21st century, railway legislation in Europe (the First Railway Package and Second Railway Package, and the creation of a Trans European Rail Freight Network) liberalised cross border freight traffic, giving rise to a demand for locomotives that could work between European Union countries with different electrification systems. That created a practically new market for multi-voltage locomotives, such as Bombardier's TRAXX.[4] However, the increase in the cost of locomotives and maintenance, along with the expense of installing different safety systems for cross-border work, reduced the economic viability of multi-system vehicles versus the use of single-voltage machines or changing locomotives where electrical systems change.[5]
Electrification in the UK began in a piecemeal fashion. The earliest main line (as opposed to metro and tramway) systems were divided between low voltage third rail (commonly about 600VDC) and overhead systems (a variety of voltages, both DC and AC were used). The third rail systems of this period eventually gave rise to the 750VDC system in the southern part of the UK and a separate area with the same system around Merseyside.
Cheap loans to stimulate economic development in the 1930s gave rise to the several schemes of 1.5kVDC electrification, mostly completed post war, notably between Liverpool Street and Shenfield, and the Woodhead Line. Starting with the West Coast Main Line electrification in the 1960s, the 25kVAC overhead system was adopted for all subsequent mainline electrification in the UK (except for extensions to other existing systems, mostly on the southern third rail network).
In some areas with restricted clearances, particularly in urban areas in east London (converted from 1,500VDC) and on suburban routes around Glasgow, 6.25kV was used. A system known as "Automatic Power Control" was developed to allow trains to automatically switch between the voltages whilst moving. All the driver had to do was shut off power and coast until clear of the neutral section; the system automatically opened the circuit breaker, detected a change in voltage and switched over the transformer to the correct input voltage setting, then closed the circuit breaker. This system proved somewhat unreliable and, with experience, it was found that less clearance was needed for 25kV than had initially been allowed for. This allowed the 6.25kV sections to be converted to 25kV, with the last section, at the London end of the London Tilbury and Southend line, being converted in 1983.
Multi-system trains still operate in the United Kingdom. The British Rail Class 700 electric multiple unit, manufactured by Siemens Mobility, is used on the Thameslink network.[6] It runs north to south from Bedford, using 25kVAC overhead power north of London, and on to Brighton, using 750VDC third-rail power south of London.
Metro-North Railroad utilizes M8 electric multiple units on its New Haven Line, which are capable of using 750VDC Third Rail, 12.5kV 60Hz and 25kV 60Hz overhead electrification. Third rail electrification persists between Grand Central Terminal and Mount Vernon East, while overhead electrification exists from Pelham to New Haven. While traveling between Mount Vernon East and Pelham, trains switch between the third rail and overhead electrification systems without stopping. East of New Haven, M8s operating on Shore Line East make use of the 25kV 60Hz overhead electrification present.