Metro station in Kolkata, India
Nalban (Also known as Nicco Park )[ 2] is a station of Line 6 of the Kolkata Metro .[ 3] [ 4] [ 5] It is situated at just beside of Nicco Park . It will serve the area of Nalban, Salt Lake Sector IV and surrounding areas in Bidhannagar , Kolkata .[ 6] [ 7] The station is named after its adjacent locality, Nalban.[ 8] [ 9]
Location
This station is located beside Nicco Park on the Salt Lake Bypass branch of Biswa Bangla Sarani at Nalban.[ 10] [ 11] The main elevated structure of the station in the middle of Biswa Bangla Sarani with footover bridges on either side othe road.[ 12] [ 13] It is geographically located at 22°33′40″N 88°24′53″E / 22.5610117°N 88.4147441°E / 22.5610117; 88.4147441 .[ 14] [ 15] The previous station of the station is Gour Kishore Ghosh metro station at a distance of 1.5 km (0.93 mi) and the next station is IT Centre metro station at a distance of 1.5 km (0.93 mi).[ 16] [ 17]
History
This project was sanctioned in the budget of 2010–11 by Mamata Banerjee with a project deadline of six years.[ 18] [ 19] The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore.[ 20] [ 21] It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport .[ 22] [ 23] In October 2011, RVNL awarded Gammon India Limited , the tender for the construction of the metro corridor from VIP Bazar Metro Station to Nicco Park (Nalban metro station),[ 24] [ 25] including stations, as part of Package-II of Line 6.[ 26] [ 27] [ 18] In early 2020s, the construction of the metro station along with the metro line started.[ 28] [ 29] The station is still under construction after structural work completion.[ 30] [ 31] [ 32] [ 33] It is slated to be completed in March 2025.[ 34] [ 32] [ 35] Alongside, there were several delays in filling viaduct gaps between Beleghata and Gour Kishore Ghosh.[ 36] [ 37] These delays were caused due to road blocks as these gaps span over busy Eastern Metropolitan Bypass and Chingrighata crossing.[ 38] [ 39] [ 40] Currently, a 400 m (1,300 ft) viaduct gap between Captain Bhery Lake and Chingrighata crossing is still left to be filled, with current completion target set for March 2025.[ 41] [ 42] [ 43] The station is expected to be operational by mid-2025.[ 44] [ 45]
Station
Structure
Nalban Metro Station is an elevated metro station and has a total of 3 levels.[ 46] [ 47] Station entrances and exits begin or end at the first level or ground level .[ 48] [ 49] Second-level or L1 or intermediate level houses station fare control , station agents, metro vending machines , crossovers, etc.[ 50] The third level or L2 or the final level houses the platforms and rail tracks . The station is 200 meters long and 25 meters wide.[ 16] [ 32] [ 51] [ 17]
The station has four entrances and exits. The station is being built with state-of-the-art technology. In addition to staircases, it will be equipped with lifts and escalators . The station also has drinking water and toilet facilities.[ 16] [ 32] [ 51] [ 52]
layout
Station with two tracks and two side platforms
Power and signal systems
Like other stations and lines of Kolkata Metro , this station has 750 volt DC powered third rail . The electricity system will be used to operate the train.[ 53]
Train movement at this station will be managed by communication based train control signaling system. With this signal system, trains can be operated at intervals of 90 seconds.[ 54]
Services
Services have not started from this station. Currently the station is under construction and is set to be opened in 2025.[ 44] [ 34]
Connections
This section is empty. You can help by
adding to it .
(September 2024 )
See also
References
^ "Metro eyes full orange line operations by march 2025" . Times of India . 26 July 2024.
^ "New System Map of Kolkata Metro" . mtp.indianrailways.gov.in . Retrieved 24 September 2024 .
^ " '7-day traffic block trial run for Metro construction work to end on June 15' " . millenniumpost.in . 14 June 2024.
^ MPost (14 June 2024). " '7-day traffic block trial run for Metro construction work to end on June 15' " . MillenniumPost . Retrieved 24 December 2024 .
^ Desk, Editor (20 August 2023). "SEGMENT LAUNCHING WORK NEAR THE PROPOSED NALBAN METRO STATION STARTED" . IBG News . Retrieved 24 December 2024 .
^ "চিংড়িঘাটার মেট্রো স্টেশনের কাজ অনেকটা শেষ! রইল অন্দরমহলের ঝাঁ-চকচকে ফার্স্ট লুক" . Hindustantimes Bangla (in Bengali). 28 October 2023. Retrieved 13 November 2024 .
^ "Sec V lane on Salt Lake Bypass in Kolkata to be shut from Sunday in 7-day trial run" . The Times of India . ISSN 0971-8257 . Retrieved 24 December 2024 .
^ "Construction of Gour Kishor Ghosh station going on in full swing" . The Statesman . 8 July 2024.
^ "Metro Railway Kolkata / Indian Railways Portal" . mtp.indianrailways.gov.in . Retrieved 24 September 2024 .
^ "Beleghata-Ruby Section of Kolkata Metro Undergoes Inspection, Here's Why" . News18 . 30 March 2024. Retrieved 8 May 2024 .
^ "Metro Railway Kolkata / Indian Railways Portal" . mtp.indianrailways.gov.in . Retrieved 8 May 2024 .
^ "Kolkata Metro: বাইপাসের উপর 'প্রায় তৈরি' নয়া মেট্রো স্টেশন, কবে জুড়বে গড়িয়া-এয়ারপোর্ট রুট?" . Aaj Tak বাংলা (in Bengali). Retrieved 8 May 2024 .
^ "Kolkata: Bypass Metro Pier at Chingrighata Metro Completes, Traffic to Resume Soon" . Times Now . 4 June 2024. Retrieved 13 November 2024 .
^ "Rail Vikas Nigam Limited plans 4 km extension from Ruby Metro to Beliaghata by puja" . The Times of India . 20 February 2023. ISSN 0971-8257 . Retrieved 8 May 2024 .
^ "Budget boost: Metro eyes full Orange Line ops by March '25" . The Times of India . ISSN 0971-8257 . Retrieved 13 November 2024 .
^ a b c MP, Team (30 September 2023). "Concreting work of Ritwik Ghatak Metro Station nears completion" . www.millenniumpost.in . Retrieved 29 March 2024 .
^ a b railanalysis3 (13 October 2023). "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on in full swing" . Rail Analysis India . Retrieved 29 March 2024 . {{cite web }}
: CS1 maint: numeric names: authors list (link )
^ a b "Rail set to take over East-West" . The Telegraph . Calcutta, India. 8 February 2011. Archived from the original on 13 February 2011.
^ "Kolkata: Bypass-New Town flyover plan with PWD for scrutiny" . The Times of India . ISSN 0971-8257 . Retrieved 24 December 2024 .
^ " "Seven projects meant to change the face of Calcutta are entangled in a web of land politics and pandering. Metro explores the tunnel vision" " . Telegraph india .
^ "Kolkata Metro update: Orange Line's Chingrighata-Sector 5 section inspected by General Manager – Details inside" . Financialexpress . 7 December 2024. Retrieved 24 December 2024 .
^ SNS (29 October 2023). "Metro Railway completes structural work of Gour Ghosh Metro station near Chingrighata" . The Statesman . Retrieved 13 November 2024 .
^ "Kolkata: Salt Lake Bypass flyover plan ready, awaits nod" . The Times of India . ISSN 0971-8257 . Retrieved 24 December 2024 .
^ "বরুণ সেনগুপ্ত মেট্রো স্টেশনের নির্মাণ কাজ তুঙ্গে, অন্দরমহলটা দেখে নিন" . Eisamay (in Bengali). Retrieved 8 May 2024 .
^ "MSN" . www.msn.com . Retrieved 24 December 2024 .
^ "Details of tenders/contracts" (PDF) . Archived from the original (PDF) on 19 March 2020. Retrieved 30 March 2024 .
^ " "Road Ahead….. Projects sanctioned" " . mtp.indianrailways.gov.in . Retrieved 28 March 2024 .
^ " "Construction of VIP Bazar station begins after two years" " .
^ "RVNL gets Nicco Park metro site for 90 days" . The Times of India . ISSN 0971-8257 . Retrieved 24 December 2024 .
^ "Airport-New Garia Metro: Site visit next week to bridge VIP Bazar gap" . The Times of India . 12 March 2023. ISSN 0971-8257 . Retrieved 28 March 2024 .
^ "Man electrocuted at construction site" . The Times of India . 19 February 2024. ISSN 0971-8257 . Retrieved 28 March 2024 .
^ a b c d "শেষের মুখে কলকাতা মেট্রোর আরও ১ স্টেশনের কাজ! ভিতরটা কেমন হল? রইল 'ফার্স্ট লুক' " . Hindustantimes Bangla (in Bengali). 28 September 2023. Retrieved 29 March 2023 .
^ "মেট্রোর পথ করতে নোনাডাঙায় সরছে পুরোনো ভিআইপি বাজার" . Eisamay (in Bengali). Retrieved 28 March 2024 .
^ a b "CRS check till Metropolitan: No Ruby ops on Thurs, Fri" . The Times of India . 27 March 2024. ISSN 0971-8257 . Retrieved 29 March 2024 .
^ "Kolkata: Pipe bridge lifted out of Metro alignment" . The Times of India . 15 July 2020. ISSN 0971-8257 . Retrieved 29 March 2024 .
^ MP, Team (30 October 2023). "Structural work at Gour Kishor Ghosh Metro Station completed" . MillenniumPost . Retrieved 13 November 2024 .
^ "Bypass metro pier 319 ready, RVNL set to hand over Chingrighata site" . The Times of India . ISSN 0971-8257 . Retrieved 13 November 2024 .
^ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing" . The Statesman . Retrieved 13 November 2024 .
^ "Kolkata: New Garia-Airport Metro Work to Affect Traffic Near Chingrighata Junction; Check Advisory" . Times Now . 28 February 2024. Retrieved 13 November 2024 .
^ dev (4 June 2024). "Kolkata Metro Progress RVNL Nears Completion of Second Pier Prepares for Handover - Urban Acres" . Retrieved 13 November 2024 .
^ "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশনের কাজ শেষ পর্যায়ে, ফাস্ট লুকেই হাঁকাল ছক্কা! » Najarbandi 24X7" . najarbandi.in (in Bengali). 29 September 2023. Retrieved 29 March 2024 .
^ "After 6 yrs, Orange line's gap at Metropolitan bridged" . The Times of India . ISSN 0971-8257 . Retrieved 19 November 2024 .
^ "Hanging bridge on Bypass solves Metro problem at Tagore Park" . The Times of India . 3 November 2023. ISSN 0971-8257 . Retrieved 29 March 2024 .
^ a b "Trial run extended beyond Ruby to Metropolitan on Kolkata Metro's Airport Line | Metro Rail Today" . Metro Rail Today: Gateway to Rail & Metro Industry . Retrieved 29 March 2024 .
^ "মেট্রো থেকে বেরিয়েই নিক্কোপার্ক ও পিকনিক স্পট- কেমন দেখতে হচ্ছে নলবন স্টেশন?" . Hindustantimes Bangla (in Bengali). 17 December 2023. Retrieved 24 December 2024 .
^ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing" . The Statesman . Retrieved 13 November 2024 .
^ "Kolkata: Deadline for Orange Line's Phase II extension revised to March 2025 due to construction delays" . propnewstime.com . Retrieved 24 December 2024 .
^ "Metro Railway Kolkata / Indian Railways Portal" . mtp.indianrailways.gov.in . Retrieved 8 May 2024 .
^ dev (19 July 2024). "Rs 727 Cr Sanctioned for Kolkata Flyover - Urban Acres" . Retrieved 24 December 2024 .
^ "Kolkata metro service on New Garia to airport corridor to be extended till Beleghata soon – Details inside" . Financialexpress . 25 June 2024. Retrieved 24 December 2024 .
^ a b "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশন চোখ ধাঁধানো, কাজ প্রায় শেষ, কেমন হল? দেখুন" . Aaj Tak বাংলা (in Bengali). Retrieved 29 March 2024 .
^ "নিউ গড়িয়া-বিমানবন্দর মেট্রো করিডোরে বড় খবর, নতুন স্টেশনের ছবি দেখুন" . Eisamay (in Bengali). Retrieved 29 March 2024 .
^ "Metro Railway Kolkata / Indian Railways Portal" . mtp.indianrailways.gov.in . Retrieved 8 May 2024 .
^ "Metro Railway Kolkata / Indian Railways Portal" . mtp.indianrailways.gov.in . Retrieved 8 May 2024 .