The United Kingdom's National Transmission System (NTS) is the network of gas pipelines that supply gas to about forty power stations and large industrial users from natural gas terminals situated on the coast, and to gas distribution companies that supply commercial and domestic users. It covers Great Britain, i.e. England, Wales and Scotland.[1]
History
Origins
The system originated in the construction during 1962–3 of the 200-mile (320 km) high-pressure methane pipeline from Canvey Island (on the Essex coast) to Leeds.[2] Imported liquefied natural gas (LNG) from Algeria was turned into gas at the Canvey terminal and supplied to the pipeline, providing eight of the twelve area gas boards with access to natural gas.[3] The gas was initially used to manufacture town gas, either as a feedstock in gas reforming processes or to enrich lean gases such as that produced by the Lurgicoal gasification process.
The pipeline was 18-inch (460 mm) in diameter and operated at 1,000 pounds per square inch (69 bar). The pipeline had 150 miles (240 km) of spur lines, supplying gas to area boards.[4]
The Gas Council was responsible for this £10 million co-operative scheme and the construction details were a joint effort of the distribution engineers of the area boards.
LNG had first been imported to Canvey from Louisiana in February 1959, and piped to Romford gasworks as feedstock to a reforming plant.[5]
UK natural gas
Natural gas was discovered on the UK continental shelf in 1965 and production started in 1967.[6] The development of offshore natural gas fields is shown in the following table. Shore terminals were built to receive, process, blend and distribute the gas.
With the assured availability of natural gas, a government white paper on fuel policy[7][8] in November 1967 proposed that natural gas should be immediately and more extensively exploited. The Gas Council and area boards began a ten-year programme to convert all users and appliances to operate on natural gas and consequently to discontinue the manufacture of town gas at local gasworks. In a pilot scheme, users on Canvey Island had been converted to natural gas in 1966.[9]
Building the NTS
To exploit the availability of natural gas and to provide for more widespread distribution, construction began of a major new transmission network which became the National Transmission System.[10]
Feeder pipelines – England
Gas from the West Sole field was first dispatched from the Easington terminal on the Yorkshire coast in July 1967, via Feeder No. 1 across the Humber to the East Midland Gas Board's gasworks at Killingholme. It was used to enrich low calorific value manufactured gas. Feeder No. 1 was extended to Totley near Sheffield where it connected to the 18-inch methane pipeline. UK natural gas first entered the NTS in July 1968.[11]
Feeder lines from the North Sea gas terminals to the spine of the NTS were laid and brought into use as the shore terminals were constructed.[3][12][13][14]
North Sea gas first reached Scotland in Spring 1970 at Coldstream via an extension of the Leeds-Newcastle pipeline. This pipeline was then extended to Glenmavis near Coatbridge Lanarkshire (Feeder No. 12) where a natural gas liquefication plant was constructed.[14]
A major set of pipelines were constructed in Scotland in preparation for arrival of gas from the Frigg gas field in 1977. From the St Fergus terminal in Scotland, two 36-inch (900 mm) pipelines (Feeder No. 10 and No. 11) were laid via Bathgate to Partington and Bishop Auckland to connect to the NTS in England, a total pipeline length of 595 miles (950 km). These lines were commissioned in 1976 and cost £140 million. Initially they carried gas from southern England into Scotland until the Frigg field began production via St Fergus in September 1977. Compressor stations are provided at 40 mile (65 km) intervals along the pipelines. A third 36-inch pipeline from St Fergus (Feeder No. 12) was completed in 1978, and a fourth 40-inch (1050 mm) pipeline (Feeder No. 13) in 1982.[15]
Growth of the NTS
The NTS was extended from Leeds to Newcastle upon Tyne in early 1969.[14] This line was extended to Coldstream in spring 1970 and then to Glenmavis, near Coatbridge, Lanarkshire.
The Wales Gas Board received natural gas supplies in 1969 through a 24-inch line from Churchover (Rugby) to Swansea via Wormington (an extension to Feeder No. 2). North Wales was also connected in 1969 via a 24-inch/18-inch pipeline from Audley Cheshire to Maelor near Wrexham (an extension to Feeder No. 4).[14]
The South Western Gas Board received natural gas at the end of 1970 from a 24-inch/20-inch pipeline from Wormington to Exeter (Feeder No. 14).[14]
A 30-inch/24-inch extension of Feeder No. 3 runs to the west of London via Slough to Mogador, Surrey, and was commissioned in 1970. An extension of Feeder No. 5 runs from Horndon-on-the Hill, crosses the Thames at Tilbury and runs via Shorne to connect to Mogador, completing the South London ring main which became operational in early 1972.[14]
In addition to these distribution pipelines, in 1971 the area boards began to supply natural gas directly to major consumers. For example, a 24-inch 17 mile 'spine' pipeline was constructed to ICI Ltd at Billingham (designated as part of Feeder No. 6), and the West Midlands Gas Board laid six similar 'spine' mains into industrial districts of Birmingham and the Black Country.[14]
Most of the NTS was built from the late 1960s to the early 1980s.[16]
Growth of the NTS 1966–1983
Years
NTS mileage
Operational gas terminals
Compressor stations
1966/7
320
Canvey
0
1968/9
688
Canvey Easington Bacton
0
1970/1
1898
Canvey Easington Bacton
1
1972/3
2199
Canvey Easington Bacton Theddlethorpe
4
1974/5
2308
Canvey Easington Bacton Theddlethorpe
9
1976/7
2915
Canvey Easington Bacton Theddlethorpe St. Fergus
10
1978/9
3047
Canvey Easington Bacton Theddlethorpe St. Fergus
11
1983
3200
Canvey Easington Bacton Theddlethorpe St. Fergus
14
Later (post-1983) feeder mains not described above include:[17]
NTS Feeder pipelines built after 1983
Feeder No.
From
To
Year commissioned
9
Easington
East Ilsley
1983–86
Brocklesby
Stallingborough
10
Bathgate
Glenmavis
Thrunton
Saltwick
11
Bathgate
Longtown
12
Kirriemuir
Longtown via Bathgate
St Fergus
Aberdeen
14
Barrington
Kenn South
15
Longtown
Warburton
1984
16
Barrow
Lupton
1983
Stapleford Tawney
Stanford Le Hope (near Canvey Island)
17
Theddlethorpe
Hatton
1988
18
Peterborough
Cambridge (via Huntingdon and New Wimpole)
1988–94
Isle of Grain
Gravesend
2008
Matching Green
Rye House
Matching Green
Tilbury
1990
St Neots
Little Barford
19
Easington
Paull
1991
20
Ilchester
Choakford
1989
21
Mawdesley
Alrewas
1992–2001
Carnforth
Burscough
1992
Elworth
Deeside power station
1994
22
Goxhill and Hatton
Peterborough
1993
23
Churchover
Honeybourne
1998–2001
Peterstow
Gilwern
2000
Wormington
Corse
2000
24
St Fergus
Lochside
2001
Easington
Paull
2010
Hatton
Silk Willoughby
2001
25
Bridge Farm
Mickle Trafford
2001
26
Huntingdon
Steppingley
2001
27
Bacton
King's Lynn
2003
Cambridge
Matching Green
2002
28
Herbrandston
Corse
2007
29
Easington
Nether Kellett
2006–08
The NTS now comprises over 7,600 km of welded steel gas pipelines. The Canvey to Leeds line is no longer part of the NTS.
LNG storage sites
In addition to the Canvey Island liquefied natural gas (LNG) import terminal, further LNG storage sites were constructed from the late 1960s.[18] These were peak-shaving facilities used to support the NTS at times of high demand, and to ensure security of gas supplies at strategic locations. When demand was high, liquefied natural gas was pumped from storage tanks, heated in vapourisers to a gaseous state and delivered into the NTS. When demand was low, gas was withdrawn from the NTS and liquefied by cryogenic cooling to minus 162 °C to replenish the storage tanks.
Import of LNG from Arzew Algeria, original contract for 1 billion m3 (35 billion cu ft) per year of gas. Liquefication 205 tonnes/day, vapourisation 6 × 50 tonnes/hour.[21]
In addition to LNG storage for peak-shaving, several sites had storage facilities for high pressure gas that could be released into, and pressurised from, the NTS. The following sites were operational by 1972.[27]
Isle of Grain, Kent: six 'bullets', 12 ft (3.6 m) diameter, 250 ft (76.2 m) long, capacity 8 million cubic feet (226,000 m3) of gas, operating at up to 1,000 psi (69 bar).
Beckton gasworks, East London: eight 'bullets', 13.5 ft (4.1 m) diameter, 263 ft (80.1 m) long, capacity 5 million cubic feet (142,000 m3) of gas, pressure cycle 350-100 psi (24-6.9 bar).
South Western Gas Board, for Bristol and Cheltenham: eleven 'bullets', 13 ft 6 in (4.1 m) diameter, 311 ft 8 in (95 m) long, total capacity 13 million cubic feet (368,000 m3), pressure cycle 450-40 psi (31-2.76 bar).
Biggin Hill, Kent: seventeen, 42-inch (1.07 m) diameter buried pipes, 1,040 ft (317 m) long, capacity 10 million cubic feet (283,000 m3), operating up to 1,000 psi (69 bar).
Operation
The NTS is the starting point for UK gas distribution. The pipeline system serving houses is not part of the NTS, but is part of the gas distribution network of local distribution zones; the two systems combine to form the UK's gas distribution network.
The two types of gas pipelines in the UK are: large diameter high-pressure (up to 85[28]bar (1200 psi) and 1050 mm (41¼")[28] diameter) pipelines – the type that the NTS uses – and smaller diameter lower pressure pipelines that connect to users who burn gas for heat. The wall thickness of the high-pressure pipelines is up to 0.625 inches (18mm).
Entry
Gas currently enters the NTS from a number of sources:
Imported LNG. Gas is delivered from import terminals at the Isle of Grain and Milford Haven (South Hook and Dragon). The Canvey Island gas terminal ceased importing LNG in 1984.[20]
Storage facilities. These include a mixture of salt cavity storage, onshore LNG storage sites, and formerly the depleted onshore gas field at Rough (via Easington terminal). The onshore storage facilities are listed below. The NTS was formerly supplied by the following decommissioned LNG sites: Ambergate, Derbyshire (closed 1985); Dynevor Arms, Merthyr Tydfil (closed 2009); Glenmavis, Lanarkshire (closed 2012); Partington, Greater Manchester (closed 2012); and Avonmouth, Bristol (closed April 2016).[26]
Gas specification and composition
The specification of gas transported within the NTS is typically within the following parameters (revised April 2023).[29][30][31][32]
Specification of gas in the NTS
Content or characteristic
Value
Gross calorific value
37.0 – 44.5 MJ/m3
Wobbe number*
46.50 – 51.41 MJ/m3
Water dewpoint
<-10 °C @ 85barg
Hydrocarbon dewpoint
<-2 °C
Hydrogen sulphide content*
≤5 mg/m3
Total sulphur content (including H2S)*
≤50 mg/m3
Hydrogen content*
≤0.1% (molar)
Oxygen content*
≤1.0% (molar) pipelines ≤38 barg;
≤0.2% (molar) pipelines >38 barg
Carbon dioxide content
≤2.0% (molar)
Nitrogen content
<5.0% (molar)
Total inerts
<7.0%
Incomplete combustion factor*
—
Soot index*
—
Parameters marked * are specified in the Gas Safety (Management) Regulations 1996.[30] As amended by the Gas Safety (Management) Regulations 2023.[33]
The composition of natural gas in the NTS in 1979 was typically as shown below.[34] The decline of supply from the UK continental shelf since 2000[35] and the sharp increase in LNG imports during the 2021 natural gas supplier crisis have made the composition more variable, though still within the calorific value limits.
Gas storage is used to manage seasonal and short-term variations in the supply and demand of gas in the UK. Facilities include salt caverns and onshore LNG storage sites (see above). Since 1985, gas has been stored offshore in the depleted Rough gas field, which initially held nine days' supply and was the UK's largest store.[36] This facility, owned by Centrica, was closed in 2017 due to maintenance costs[36] but about 20% of its capacity was reopened in October 2022.[37]
The operational onshore gas storage facilities in Britain are as follows.[38][39][40]
The salt cavity storage facility at Hornsea, East Yorkshire comprises seven cavities at a depth of 6000' (1800 metres), which each store up to 60 million m3 (80 million cu. yd.) of gas at a maximum pressure of 240 bar (3500 psi). The releasable volume of gas is about half of the gross volume. During periods of low demand, gas is compressed into the cavities by electrically driven compressors and fed back onto the NTS at times of peak demand.[21]
Salt cavern storage facilities at Stublach were created by drilling 20" (50 cm) diameter holes through 1000' (300 metres) of rock and 820' (250 metres) of salt. This was followed by inserting metal tubes into the holes and filling the annulus with cement to create a leak-tight seal. Water was injected into the wells to dissolve the salt and create brine which was supplied to local industry for the production of bulk chemicals, such as soda ash and chlorine. The caverns created are about 300' (90 metres) in diameter and 260' (80 metres) tall (each has a volume of 339,300 m3; 443,800 cu. yd.) and are used to hold compressed gas. Stublach is the largest gas storage facility in the UK, containing up to 450 million cubic metres (590 million cubic yards) of gas.[40]
Compressor stations
There are 25 (mostly gas turbine driven) compressor stations and over 25 pressure regulators. Gas moves through the NTS at speeds up to 25 mph (40 km/h), depending on pressures and pipeline diameters. Compressor stations generally operate at a pressure ratio of 1:1.4 – a balance between maintaining pressure and hence flow, and the capital and running cost of the compressors. It also ensures that the temperature rise across the compressors is not high enough to require after-coolers to prevent damage to the pipeline protective coatings. On the pipelines from St Fergus, compressor stations are provided at 40 mile (65 km) intervals; each compresses the gas from about 48 bar (700 psi) at 5 °C (41°F) to 65 bar (950 psi) at 45 °C (113°F).[41]
Offtakes from the NTS include those supplying industrial users, local distribution networks, storage sites and export pipelines.
To about 71 large users such power stations and industry, either on multi-business sites such as Billingham and Runcorn or to individual companies such as INEOS Teesside.
To inland storage sites (see 'Entry') and formerly to the offshore Rough field storage site via the Easington gas terminal.
To the Irish interconnectors; the 24-inch 85 mile (135 km) Scotland-Northern Ireland Pipeline (SNIP) to Ballylumford, Northern Ireland, and the two 24-inch UK-Ireland Interconnectors to Dublin, both via an NTS offtake at Moffat, Scotland.
Gas can be exported to Belgium and the Netherlands via the Interconnector UK and the BBL pipelines, both via the Bacton terminal.
To the Gas Distribution Network of Local Distribution Zones, as follows:[42]
NTS Gas Distribution Network offtakes
National Grid area
Number of LDZ offtakes
Scotland
19
Northern
15
South West
13
East Midlands
13
West Midlands
12
North West
11
East Anglia
11
North East
9
Southern
8
North Thames
5
South East
5
Wales
3
Total
124
Gas distribution network
Companies that own part of this gas network, also known as the Local Transmission System (LTS), are known as gas transporters. Gas enters this network via the NTS through a pressure reduction station to the twelve gas distribution zones in Great Britain within eight distribution networks. The network covers 275,000 km (171,000 mi). The LTS is managed from Hinckley, Leicestershire (former headquarters of the NTS). Financial transactions between gas transporters are managed by Xoserve, based in Solihull, which was a department of National Grid before it became an independent company.
The transmission network is owned by National Gas, which is owned by Macquarie Asset Management (80%) and National Grid plc (20%).[43] Agreement was reached in July 2024 for Macquarie to buy National Grid's stake, giving Macquarie full ownership in the first quarter of 2025 subject to regulatory approval.[44]
The changing ownership of the NTS reflects developments and corporate changes in the UK's gas and energy industries.
Gas Council and area boards, 1962 – 31 December 1972