You can help expand this article with text translated from the corresponding article in French. (October 2021) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Consider adding a topic to this template: there are already 1,696 articles in the main category, and specifying|topic= will aid in categorization.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing French Wikipedia article at [[:fr:Ligne rose du métro de Montréal]]; see its history for attribution.
You may also add the template {{Translated|fr|Ligne rose du métro de Montréal}} to the talk page.
The project was initially projected to cost CA$5.9billion and scheduled to open in 2025.[2]. The project was subsequently added to Quebec's 10-year infrastructure plan, and feasibility studies for the line's western section began in June 2021.[3] Since then, the project has been altered and a competing segment on the REM has also been proposed, bringing into question as to what form the Pink Line will take.[4] As of 2025, the status of the project is unknown.
The proposed route of the line would traverse many Montreal neighbourhoods. It would start in Montreal North, and travel southwest through the city, with connections to the blue line extension, Mont-Royal metro station, and Place-des-Arts station. Given this routing, the section from Montreal North to Pie-IX is generally seen as the successor to the cancelled White Line originally proposed in the 1980s. A second phase of the project would travel southwest from Downtown Montreal, through Westmount, the Notre-Dame-de-Grâce neighbourhood, Montreal West, and end at Lachine.[2] This would be the first Montreal Metro line with above-ground stations.
List of stations
The pink line is proposed to have 29 stations, listed in the table below.[5]