The superstructure of the bridge was fabricated by the King Iron Bridge Company of Cleveland, Ohio. The builders completed the bridge in September 1885 at a cost of $3,295.[2] The total length of the bridge is 149.9 feet (45.7 m). The deck width is 16.1 feet (4.9 m). The vertical clearance above the deck is 14.2 feet (4.3 m).[3]