The Nebraska Department of RoadsBiennial Report of 1933-34 describes the construction of the underpass as featuring "a complete, modern street light system, and interlocking traffic control signal system, two pedestrian subways, and a grade separation of Dodge Street and Saddle Creek Boulevard."
Built by the Works Progress Administration, over 1,175 cubic yards (898 m3) of dirt were excavated to lower Saddle Creek Road sufficiently to pass under the overpass. The project was completed in 1934,[3] and was designed to accommodate the westernmost addition to Omaha's boulevard system, which was originally called Saddle Creek Boulevard. Saddle Creek Road still utilizes the underpass today as it sits between the Morton Meadows and Dundee neighborhoods. As of 2004 the Underpass was the only property listed on the National Register in either neighborhood, although each one has submitted applications to be listed as a historic district.[4]