The project consists of two main components. The first is a new 16-kilometre (9.9 mi) twin-tunnel rail crossing under Sydney Harbour and through the city to Sydenham with seven new underground stations in central Sydney.[4] The second is the conversion of 11 stations on a portion of the existing Bankstown line on the Sydney Trains network for use by autonomous trains.
When complete, the new track will form part of a single 66-km rail line on the Sydney Metro network. Together with planned improvements to the Main Western line, the project is expected to increase capacity on the Sydney rail network by up to 60%, and allow for the movement of over 100,000 extra commuters across the network every hour.[5]
The project began construction in 2017.[6] The tunnel between Chatswood and Sydenham had been planned to open on 4 August 2024,[7] with the converted portion of the Bankstown line planned to open in 2025.[8] The opening of the Chatswood to Sydenham line was later postponed to 19 August.[9]
Tunnelling was completed in March 2020.[10] In 2023, the state government confirmed the cost of the project had overrun initial estimates by $9 billion to a total cost of $20.5 billion, due to budget blowouts and station redesigns.[11]
The proposal was officially announced by the New South Wales government on 10 June 2014. The proposal was contingent on funding from privatising at least 49% of the state's power infrastructure, which was secured in June 2015.[13][14] Preliminary works involving drilling to depths 70 m (230 ft) below Sydney Harbour commenced on 9 April 2015 to find the alignment for the new Sydney Metro tunnels.[5][15]
Chatswood to Sydenham section
Planning approval for the Chatswood to Sydenham section of the project was received in January 2017.[16] In June 2017, a John Holland, CPB Contractors and Ghella joint venture was awarded the contract to build the twin tunnels from Chatswood to Sydenham.[17][18]
A contract for a major upgrade of Central station was awarded to Laing O'Rourke in March 2018. The project includes construction of two new underground platforms to serve the metro and a new underground concourse called Central Walk. The new platforms will be built beneath platforms 13–14.[19]
In November 2018, a $1.376 billion contract was awarded to an unincorporated joint venture between CPB Contractors and UGL to be known as Systems Connect, which will include the laying of track from Chatswood to Sydenham as well as converting power on the Bankstown line to Metro standards and also the building of further Metro train facilities at Rouse Hill and Marrickville.[21]
From Sydenham, the Sydney Metro takes over the existing Bankstown railway line between Sydenham and Bankstown, which will be converted for use by single-deck autonomous trains with platform-edge doors. Bankstown will become an interchange station between M1 North West & Bankstown and T6 Lidcombe & Bankstown services. The conversion and incorporation of this section of track into Sydney Metro has not been without controversy, with a letter written by four former rail executives John Brew, Ron Christie, Bob O'Loughlin and Dick Day casting doubts on the government's claims of improved reliability as well as warning that commuters west of Bankstown face additional interchange for travel towards the City Circle.[22]
Planning approval of the upgrade of Bankstown line between Sydenham and Bankstown was received in December 2018.[23] Beginning in December 2019, the Bankstown line between Sydenham and Campsie and the Illawarra railway line between Hurstville and Central was closed during certain periods in order to allow the Bankstown line to be converted and upgraded to metro standards.[24][25]
The NSW Legislative Council announced on 22 August 2019 an Inquiry into the "Sydenham - Bankstown Line conversion"[26] examining decision making in relation to the transport project. The Inquiry to be conducted by Portfolio Committee 6 - Transport and Customer Service and chaired by Abigail Boyd released its report on 9 April 2020, recommending that the conversion not take place with Sydney Metro instead to terminate at Sydenham.[27] The NSW Government rejected most recommendations from this report.[28]
In December 2020, Transport for NSW announced it was considering when the Bankstown line closes for conversion to metro in 2024, the Liverpool to City service via Regents Park and Lidcombe will be reinstated and a shuttle branch service will run between Lidcombe and Bankstown.[29] Regents Park will be the main interchange point between both services as the direct train between Bankstown and Liverpool will be withdrawn.[29] Such changes were confirmed in late 2023 with the NSW Government ruling out earlier plans to close stations in the West of Bankstown between Bankstown and Lidcombe/Cabramatta when Sydney Metro City & Southwest opened.[30]
In April 2023, it was confirmed by the government that the conversion of the Bankstown line was delayed by at least twelve months and was expected to open in 2025, after the main CBD tunnel commences operations.[31]
In response to the recommendation of the Sydney Metro Review, in August 2023 the state government announced the continuation of the Sydney Metro Southwest project, with the conversion of the line between Sydenham and Bankstown requiring a 12-month temporary closure from September 2024 onwards.[32]
In September 2024, the Rail, Tram and Bus Union (RTBU) threatened to go on strike due to what they saw as unreasonable working conditions on Metro services relating to measures such as putting a qualified Sydney Trains driver on every Metro train, and reducing fares to 50 cents as has happened in Queensland.[33]
Cost
In 2020, the Sydney Morning Herald reported that an internal government review found the project had blown out by $4.3 billion for a projected cost of $16.8 billion.[34] Detailed budgeting was not released as part of the business case in 2016, but the project was originally estimated to cost between $11.5 and $12.5 billion.[34][35] These increases were in part driven by unexpected costs of building the underground CBD stations.[34]
The new Labor government of Chris Minns elected in the 2023 state election initiated a broad review into the Sydney Metro projects in April 2023, and announced that internal documents under the previous government of Dominic Perrottet had shown that the City & Southwest project was budgeted to cost $20.5 billion, a $9 billion escalation from the initial projections.[11][36] The ABC reported that further increases were possible before the line is fully completed in 2025.[36]
Route
The project is a major extension of the Metro North West & Bankstown Line, connecting Chatswood–the line's initial terminus–to Sydenham, with new stations at Crows Nest, Victoria Cross, Barangaroo, Martin Place, Pitt Street, Central and Waterloo.[37] At Sydenham, the new line will join the existing Bankstown railway line, which will be converted to allow single-deck autonomous trains to run between Sydenham and Bankstown as part of the Sydney Metro City & Southwest project.
The original list of stations consisted of Crows Nest, Victoria Cross, Martin Place, Pitt Street (now Gadigal), Central, Sydenham and 10 stations on the Bankstown line. Potential additional stations were also proposed for the industrial area of Artarmon (underground), St Leonards, Barangaroo and either the University of Sydney or Waterloo.[37][38] Barangaroo station was confirmed in June 2015 and Waterloo was confirmed in December.[39][40] The other three stations will not be included in the project.
A scoping study into rail investment to service Western Sydney and the proposed Western Sydney Airport was announced by the New South Wales and Australian governments in November 2015.[41] The study's final report was released in March 2018 and included a proposal to extend the Sydney Metro City & Southwest from Bankstown to Liverpool. The extension is unlikely to be built for at least 20 years.[42] Transport for NSW is also considering rapid buses and trackless trams for the corridor[43] although following the 2023 NSW Government election, this Metro extension has been cancelled.[44]
The CBD Rail Link[45] was a component of the now-cancelled Metropolitan Rail Expansion Program (MREP) in Sydney. First announced in 2005, the line was to have started at Redfern Station, travelled under the city centre, crossed under Sydney Harbour, passed through the lower North Shore and ended at the existing Chatswood railway station. It was to have provided the centre section of a planned North West-CBD-South West rail arc connecting major areas of employment with the CBD and airport. Alternative names for the planned route have included the Redfern to Chatswood Rail Link (RCRL), Redfern to Chatswood Harbour Rail Link and MetroPitt.
The proposal was announced by LaborPremierBob Carr on 15 June 2005 (shortly before his resignation), and formed part of the $8 billion Metropolitan Rail Expansion Project (MREP). The MREP consisted of the New South Wales government's $8 billion North West – CBD – South West Line, including the North West Rail Link (to extend from Cheltenham to Rouse Hill), and the spur to Leppington in Sydney's South West. The six kilometre CBD Rail Link was slated to cost $5 billion, and was to include duplicated tracks on the North Shore line between St Leonards and Chatswood. It was to provide a second railway line transversing Sydney Harbour to ease congestion at Town Hall and Wynyard stations, both considerably crowded and unable to be easily expanded, and to reduce travel times between the city and the lower North Shore.
The government's previous plan of constructing an additional CBD underground line was known as MetroWest. It was to have run from Haymarket in the city's Chinatown precinct near Darling Harbour, along the western edge of the city under Sussex or Kent Street and either ended at Wynyard station or continued over the harbour 'strapped' to the Sydney Harbour Bridge. This option would not have served the part of the city experiencing the fastest growth of employment, and would have necessitated the destruction of eight office buildings. A previous MetroPitt proposal, travelling further east (and under its namesake Pitt Street) and through the financial district, could also be built deeper underground, limiting the impact on existing infrastructure.
In 2006, both of these corridors were protected with planning buffers to allow the option of future construction.[46] Developers who want to excavate deeper than two metres within a 25-metre buffer zone of the corridors need to seek RailCorp's approval.[47]
In the plan the stations along the CBD Rail Link would have included:[48]
St Leonards – interchanging with the North Shore and Northern Lines
Chatswood – interchanging with the North Shore and Northern Lines
A map[49] of the protected corridors suggested there may have been the potential for another station at Macquarie Place, between The Rocks and Castlereagh Street.
In March 2008 the State Government announced that the line would be cancelled, its role to be partly superseded by future metro rail lines.[50]
One of the metro lines announced in 2009 by the Rees state government was CBD Metro, which ran along a similar CBD alignment to the current Sydney Metro proposal between Central and Barangaroo. However, the alignment continued west from Baranagaroo, crossing Darling Harbour and heading towards Rozelle and beyond. Therefore, there were no metro lines proposed linking the CBD to Chatswood.
In 2010, the new Keneally government cancelled the entire metro project, and the CBD Relief Line & Western Express concept was announced as replacement. The relief line was largely a return to the CBD Rail Link proposal, but used the MetroWest alignment instead. The line would have offered an alternative heavy rail link in the CBD between Redfern and Wynyard, but also did not cross the harbour into the North Shore. The relief line was cancelled by the incoming Liberal-Nationals government when they won the 2011 state election, who then announced the current project in 2014.
^Transport for NSW (2017). "Project Overview". 5.1 Overview and key components. p. 56. Archived from the original on 9 February 2021. Retrieved 10 June 2017. New metro stations at Crows Nest, Victoria Cross, Barangaroo, Martin Place, Pitt Street and Waterloo as well as new underground platforms at Central Station{{cite web}}: CS1 maint: location (link)
^"Protected CBD Rail Corridors Map"(PDF). Sydney Metropolitan Strategy. NSW Government - Department of Planning. Archived from the original(PDF) on 12 December 2006. Retrieved 24 January 2007.
Sarah Bernhardt fotografata da Nadar nel 1864. Sarah Bernhardt, nata Henriette Rosine Bernard[1] (Parigi, 22 ottobre 1844 – Parigi, 26 marzo 1923), è stata una celebre attrice teatrale e cinematografica francese. Soprannominata La voix d'or (La voce d'oro) e La divina, Sarah Bernhardt è considerata una delle più grandi attrici teatrali del XIX secolo. Indice 1 Biografia 2 Vita privata 3 Teatro 4 Filmografia 4.1 Attrice 4.2 Sceneggiatrice 5 Opere 6 Onorificenze 7 Nella cultura di mas…
His Favourite PastimeCuplikan filmSutradaraGeorge NicholsProduserMack SennettDitulis olehCraig HutchinsonPemeranCharles Chaplin Roscoe 'Fatty' Arbuckle Viola BarrySinematograferFrank D. WilliamsDistributorKeystone StudiosTanggal rilis16 Maret 1914 (1914-03-16)Durasi16 menitNegaraAmerika SerikatBahasaBisu (intertitel Inggris) His Favorite Pastime His Favourite Pastime adalah sebuah film komedi Amerika tahun 1914 yang dibintangi oleh Charlie Chaplin. Sinopsis Charlie mabuk di bar. Ia melangka…
Artikel ini berisi konten yang ditulis dengan gaya sebuah iklan. Bantulah memperbaiki artikel ini dengan menghapus konten yang dianggap sebagai spam dan pranala luar yang tidak sesuai, dan tambahkan konten ensiklopedis yang ditulis dari sudut pandang netral dan sesuai dengan kebijakan Wikipedia. (Mei 2020) Samsung SDS Co. Ltd.JenisPublikKode emiten KRX: 018260 ISINKR7018260000Pendiri1 Mei 1985Kantorpusat35 Olympic-Ro, 125, Songpa-gu, Seoul, Korea Selatan, Korea SelatanTokohkunciHong Won-Pyo (CEO…
S&T Motiv Co., LtdJenisPerusahaan terbukaKode emiten064960: Korea ExchangeIndustriOtomotif dan PertahananDidirikan1981KantorpusatBusan, South KoreaTokohkunciTae-kwon Kim CEOProdukSuku cadang kendaraan, senjata api ringanPendapatan440 Miliar Won (2009)Laba operasi23 Miliar Won (2009)Laba bersih8.8 Miliar Won (2009)Situs webhttp://www.sntdaewoo.com S&T Motiv (dahulu Daewoo Precision Industries) adalah perusahaan asal Korea Selatan yang memproduksi senjata api dan suku cadang kendaraan berm…
Ilustrasi gelombang transversal (bidang) sederhana yang merambat melalui media elastis dalam arah horizontal, dengan partikel-partikel yang dipindahkan dalam arah vertikal. Hanya satu lapisan material yang ditampilkan Ilustrasi medan listrik dan magnet di sepanjang sinar dalam gelombang cahaya (bidang) sederhana. Untuk bidang apa pun yang tegak lurus dengan sinar, setiap bidang selalu memiliki nilai yang sama di semua titik bidang. Propagasi gelombang bola transversal dalam garis 2d (model empir…
Don't Phunk with My HeartSingel oleh The Black Eyed Peasdari album Monkey BusinessSisi-BBend Your BackDirilis10 Mei 2005FormatCD singel, maxi singel, unduh digitalDirekam2004GenreHip hop, R&BDurasi4:04LabelA&M, will.i.am music group, InterscopePenciptaWilliam Adams, Stacy Ferguson, Printz Board, G.Pajon Jr., Full Force, Anadi, IndewarProduserwill.i.am Don't Phunk with My Heart atau Don't Mess with My Heart pada beberapa suntingan radio, adalah sebuah lagu oleh The Black Eyed Peas dari al…
العلاقات المكسيكية الإستونية المكسيك إستونيا المكسيك إستونيا تعديل مصدري - تعديل العلاقات المكسيكية الإستونية هي العلاقات الثنائية التي تجمع بين المكسيك وإستونيا.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومرجعية للدولتين: وجه المق…
Lingga BayuKecamatanPeta lokasi Kecamatan Lingga BayuNegara IndonesiaProvinsiSumatera UtaraKabupatenMandailing NatalPemerintahan • CamatSaipuddin S.sosPopulasi • Total- jiwaKode Kemendagri12.13.14 Kode BPS1202021 Luas- km²Desa/kelurahan17/2 Lingga Bayu adalah sebuah kecamatan di Kabupaten Mandailing Natal, Sumatera Utara, Indonesia. Pranala luar (Indonesia) Keputusan Menteri Dalam Negeri Nomor 050-145 Tahun 2022 tentang Pemberian dan Pemutakhiran Kode, Data Wilayah …
تشاك بيري (بالإنجليزية: Chuck Berry)، و(بالإنجليزية: Charles Edward Berry) تشاك بيري في عام 1957 معلومات شخصية اسم الولادة (بالإنجليزية: Charles Edward Anderson Berry) الميلاد 18 أكتوبر 1926 [1][2][3][4][5][6][7] سانت لويس[3] الوفاة 18 مارس 2017 (90 سنة) [8]سانت تشارلز…
Political party in Ukraine Power of the People Сила людейLeaderYuri Bova [uk][1]FoundedAugust 20, 2014 (2014-08-20)HeadquartersKyiv, KhreshchatykIdeologyLiberalismPro-EuropeanismPolitical positionCentreEuropean affiliationAlliance of Liberals and Democrats for Europe PartyColours Blue YellowVerkhovna Rada0 / 450 Regions[2]0 / 43,122 Websitewww.sylalyudey.orgPolitics of UkrainePolitical partiesElections Power of the People…
Cette page d’homonymie répertorie les différents sujets et articles partageant un même nom. Sur les autres projets Wikimedia : écusson, sur le Wiktionnaire Écusson orné de crosses, table des Marchand. Un écusson peut être : un meuble en héraldique ; un écusson ou écu : élément d'architecture ; un écusson : cartouche plus ou moins quadrangulaire ou ogival dans l'art néolithique, pouvant présenter toute une gamme d'appendices (rostre sommital, boucle…
Politics of Bulgaria Constitution1879194719711991 Presidency President (list) Rumen Radev Vice President Iliana Iotova ExecutiveLegislative Government Prime Minister (list) Nikolay Denkov National Assembly Speaker: Rosen Zhelyazkov LawJudiciary Nationality law Human rights Courts Constitutional Court Supreme Administrative Court Supreme Court of Cassation Office of the General Prosecutor Major political partiesPPGERBDPSBulgarian Socialist PartyDemocratic BulgariaRevivalBulgarian Rise Recent elec…
Children's television channel, 1996–2020 Television channel Disney XDBroadcast areaUnited KingdomRepublic of IrelandHeadquartersHammersmith, LondonProgrammingLanguage(s)EnglishPicture format1080i HDTV (downscaled to 16:9 576i for the SDTV feed)Timeshift serviceDisney XD +1 (2009–30 April 2020)OwnershipOwnerDisney Channels Worldwide The Walt Disney Company Limited(Walt Disney Direct-to-Consumer & International)Sister channelsDisney Channel (1995–2020)Disney Junior (2000–2020)HistoryLa…
Part of a sundial that casts a shadow For other uses, see Gnomon (disambiguation). This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Gnomon – news · newspapers · books · scholar · JSTOR (August 2023) (Learn how and when to remove this message) The gnomon is the triangular blade in this sundial. A gnomon (/ˈnoʊ…
Battle in the Middle East in 1119 Battle of Ager SanguinisPart of the CrusadesBattle of Ager-Sanguinis, 1337 miniatureDate28 June 1119LocationBalat, near Sarmada[a]Result Artuqid victoryBelligerents Artuqids of Aleppo Principality of AntiochCommanders and leaders IlghaziIbn al-Khashshab Roger of Salerno †Strength 20,000[1] 7,000–11,000[1] 700 knights[2]500 Armenian cavalry[3]3,000 infantry[4]Turcopoles and auxiliaries[1]Casualt…
This article uses bare URLs, which are uninformative and vulnerable to link rot. Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style. Several templates and tools are available to assist in formatting, such as reFill (documentation) and Citation bot (documentation). (June 2022) (Learn how and when to remove this message) This article relies excessively on references to primary sources. Please improve this article by …
Сельское поселение России (МО 2-го уровня)Новотитаровское сельское поселение Флаг[d] Герб 45°14′09″ с. ш. 38°58′16″ в. д.HGЯO Страна Россия Субъект РФ Краснодарский край Район Динской Включает 4 населённых пункта Адм. центр Новотитаровская Глава сельского посел…
Северный морской котик Самец Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:ЧелюстноротыеНадкласс:ЧетвероногиеКлада:АмниотыКлада:Синапсиды…