Currently, the Drakensberg Pumped Storage Scheme of the electricity producer Eskom allows, since 1981, essentially energy storage, and its exploitation by pumped storage. The current system already includes the Spioenkop Dam. Other dams to be built, around the towns of Ladysmith (Jana dam) and Escourt (Mielietuin dam), will collect water which will be transported by pipeline to the Kilburn dam lake, at the foot of the Drakensberg, to be then sent to the Vaal Basin by pumping.[4]
History
The first phase of the project, which began in 1970, was commissioned on 8 November 1974.[5]
From 1994, the Department of Water Affairs and Forestry of the Government of South Africa studied the means of increasing the volume of water available in the Vaal basin for agricultural use in particular. A feasibility study using water supply from the Tugela basin in the vicinity of Bergville was launched in December 1996.
The works are currently being built gradually, and the project was to be fully completed during the 2010s. The transfer of water from the Tugela River to the Sterkfontein Dam was expected to begin in August 2019, but was delayed to December due to technical and safety issues.[6]