It has a capacity of 45 trains and has an area of 130,000 square metres. Train inspections are carried out at this depot.
Commuters can have a glimpse of it while on a train between Clementi and Jurong East stations. It is located off Toh Tuck Avenue and sits along Toh Tuck Avenue. The depot is located between Clementi station and Jurong East station on the East West line and has 3 reception tracks: 2 tracks Westbound towards Jurong East station and 1 track Eastbound towards Clementi station.
History
Hiap Shing had won the contract for the earthworks at Ulu Pandan Depot on 13 August 1985.[1]
Plans have also been made for the expansion of Ulu Pandan MRT Depot, with LTA commissioning an engineering study in 2015.[2][3]