Many countries tried to subsidise green technology such as wind power, and most failed to make it a viable industry. The Danish system was an exception, providing 30% of initial capital cost in the early years which was gradually reduced to zero, but still maintaining a feed-in tariff.[16] The capital cost subsidy was reduced to 20% in June 1985, when wind turbines received DKK 50 million per year. Other renewable energy forms received 37 million.[17] The research institution Teknologisk Institut identified many specific improvement needs, pushing development from ad hoc to systemised solutions.[18]
On 29 March 1985, one year before the Chernobyl disaster, the Danes passed a law forbidding the construction of nuclear power plants. In the process, the Danish grassroots movement had a substantial role. The Danish Anti-nuclear Movement's (OOA) smiling-sun logo "Atomkraft, Nej Tak" ("Nuclear Power, No Thanks") spread worldwide, and the renewable alternatives were promoted by the Danish Organisation for Renewable Energy (OVE).
Denmark adopted a target of cutting carbon emissions by 22% from 1988 levels by 2005.[15] Planning of wind power was deliberately streamlined by authorities to minimise hurdles.[19]
Policy measures
In June 2005, the Danish government published Energy Strategy 2025, which replaced the previous strategy from 1996. The strategy formulates policy projects that are intended to accelerate the expansion of wind power and restructure the electricity market. [20][21]
The Danish government also succeeded in drawing up energy agreements from 2008 to 2011 with broad-based support, which included the most far-reaching and effective programs for the expansion of wind energy to date.[22]
The parties agreed that the share of renewable energies in Danish energy consumption should be 20 % in 2011. The price for wind energy was also increased in the agreement. The parties also agreed to construct new offshore wind turbines with a capacity of 400 MW by 2012. The agreement introduced a compensation scheme for residents living near wind turbines, a scheme for purchase rights and a guarantee fund.[23][21]
After the government expressed the long-term vision of a Denmark 100% independent of reliance on fossil fuels[24] during the current agreement, in independent commission on climate change policy proposed detailed recommendations in September 2010 on how this vision can be achieved. This led to Energy Strategy 2050 a year later. The strategy consists of three tracks, as one of them focusses on more renewable energy with onshore and offshore wind power. It included tenders for over 1000 MW in offshore including Kriegers Flak in the Baltic Sea. Kriegers Flak is also used to connect Denmark and Germany with a 400MW cable, through the German Baltic 2 Offshore Wind Farm,[25] and it is the wind farm with the lowest guaranteed price (øre/kWh) for large offshore wind farms in Denmark.[26] In addition, the distance requirements for wind turbines were evaluated and revised. Such subsidies as compensation schemes for residents living near onshore windmills lost relevance and the offshore area was taken into focus.[27][21]
Ever since the first energy agreement with outstanding consensus in parliament in 2008, Denmark grew their wind power share in domestic electricity production from 19% to 55% in 2019.[28]
For the policy approach, one may note the adoption of incrementalism that helps this to be developed ahead of other more rational approaches such as those adopted by USA and UK. See the use of Wind Power development in the example section of Incrementalism.
Denmark has relatively modest average wind speeds in the range of 4.9–5.6 m/s measured at 10 m height. Onshore wind resources are highest in the western part of the country, and on the eastern islands with coastlines facing south or west. Wind is higher in autumn and winter and lower in summer, and Denmark also has about 2.3 GW of solar power.[29][30] The country has very large offshore wind resources, and large areas of sea territory with a shallow water depth of 5–15 m, where siting is most feasible. These sites offer higher wind speeds, in the range of roughly 8.5–9.0 m/s at 50 m height.[31] There have been no major problems from wind variability, although there is a temporary problem resulting from the connection of a large bloc of wind power from offshore wind farms to a single point on a weak section of the transmission network.[32] The wind resource over Denmark was mapped in 1999 by EMD International A/S and Risø National Laboratory. The mapping was made using a 200 m grid resolution using the models in WindPRO and WAsP. The results were validated on more than 1200 wind turbines nationwide.[33]
Denmark is connected by transmission line to other European countries (e.g. Cross-Skagerrak)[34] at an electricity interconnection level (transmission capacity relative to production capacity) of 44% in 2015,[35] and increased since then. Denmark has also retained 6 GW of its traditional power plants,[30] therefore it does not need to install additional peak-load plants to balance its wind power. Instead, it purchases additional power from its neighbours when necessary. With some strengthening of the grid, Denmark plans to increase wind's share even further.[36] In 2010 the plan was to reach 50% of consumption in 2020[37] (which was almost met), and up to 84% in 2035.[38]
Analysts expect the cost of wind power to be 30 øre/kWh and its handling cost to be 15 øre/kWh, being lower than coal and natural gas at 55 øre/kWh minimum.[39] Due to their inability to follow load wind power gets a lower price.[40]
The number of household heat pumps has stalled at 70,000 in 2015 due to tax-free wood pellets, and the goal of 300,000 small heat pumps in 2035 is unlikely to be reached, reducing the value of more wind power unless electricity tax is reduced.[50]
Denmark has the highest proportion of wind power in the world. In 2015, Denmark produced 42% of electricity from wind,[51][5] up from the 2014 record of 39% of total power consumption. For the month of January 2014, that share was over 61%. The month of lowest wind power share was July at 23%.[6] Denmark also had 548 MW of solar power[52] (790 MW in late 2015).[53] A peak generation period occurred on 21 December 2013 when the wind share was 102%, and for 1 hour the share was 135%.[8]
In 2005, Denmark had installed wind capacity of 3,127 MW, which produced 23,810 TJ (6.6 TW·h) of energy, giving an actual average production of 755 MW at a capacity factor of 24%.[54]
In 2009, Denmark's wind capacity grew to 3,482 MW; most of the increase came from the 209 MW Horns Rev 2 offshore wind farm, which was inaugurated on 17 September 2009 by Crown Prince Frederik.[55] In 2010, capacity grew to 3,752 MW, and most of the year's increase came from the Rødsand II off-shore wind farm.
On 22 March 2012, a coalition of parties representing 95% of all members of the Danish parliament agreed that the Danish state would increase the country's offshore wind capacity by 1,500 MW.[56][57] The 1,500 MW extra capacity was achieved by constructing several offshore wind farms; the 400 MW Anholt wind farm in 2014,[6] the 407 MW Horns Rev 3 in the North Sea[57] at 77 øre/kWh[58] in 2019,[59][60] and the Kriegers Flak at 37.2 øre/kWh[61] with a capacity of 600 MW in the Baltic Sea close to the borders of Germany and Sweden in 2021.[57] Kriegers Flak is also used to connect Denmark and Germany with a 400MW cable, through the German Baltic 2 Offshore Wind Farm,[25] and Energinet ordered electrical equipment in early 2016.[62][63] Eight groups applied for pre-qualification for Kriegers Flak,[64] of which 7 were approved[65] – 3 more than the 4 companies approved to compete for Horns Rev 3,[66] both having more bidders than the single bidder for Anholt. By 2018, Danish offshore wind farms had average 40% capacity factor. Newer farms had higher CF than older.[67]
Wind power output reduces spot market prices in general via the Merit Order effect; in 2008 this caused a net reduction of pre-tax electricity prices (balancing the increase from the feed-in law).[69]
Statistics
Wind power net electricity generation (GWh) 2007–2019
5,000
10,000
15,000
20,000
2007
2009
2011
2013
2015
2017
2019
Wind power net electricity generation 2007–2014[70][71]
The chart shows the minimum (guaranteed) price a plant receives during the FLH period in øre/kWh. Subsidy = guaranteed price minus market price. FLH=Full Load Hours; the amount of production the plant receives support for. After that, the plant usually receives market price. Transmission is included in the nearshore "Vesterhav", but not the other plants. The levels are usually below levels in Germany and UK.[75][76][77][78][61][79]
Peak records
As Denmark continues to install additional capacity, they continue to set new production records. This is a natural consequence of capacity growth. On 9 July 2015, in the evening, unusually strong wind conditions resulted in 116% of national electricity consumption being produced by wind farms and at 3 am the next morning at low demand, wind production exceeded 140% of current demand.[5][80][needs update][81]
The 1,000 MW Thor offshore wind (a $2.5 billion project scheduled for 2027 in the North Sea) was agreed in December 2021. 5 of 6 bidders bid the same price of 0.01 øre/kWh, and drew lots to find the winner (RWE) for a Contract for difference,[79] which included connection costs and a potential DKK 2.8 billion (€377m) payment to the state.[82][83] The similar bids raised questions about the suitability of the auction.[84] Three days after the auction, the Parliament agreed on a further 2 GW offshore wind by 2031 due to the success of the Thor auction.[85]
In early June 2023, an agreement was made by Germany and Denmark to link the Danish island of Bornholm's wind energy producing capacity to the mainland by the early 2030s, with a minimum capacity of 3 gigawatts.[86]
In addition 6 nearshore wind farms with a total capacity of up to 450 MW are scheduled along with 50 MW of experimental offshore wind farms. The nearshore differ from conventional offshore in having the being close enough to the coast to have the transformer on land, decreasing cost.[57] The first 350 MW were called for tenders in 2015, with a maximum price of 70 øre/kWh.[87][88][89] Vattenfall bid the lowest price for the 350 MW nearshore farms at 47,5 øre/kWh in September 2016,[90] but the political situation was unclear.[91]
Onshore
In addition to the offshore projects, a further 500 MW additional net capacity of onshore windfarms is expected to be constructed until 2020. The 500 MW of additional net capacity is the expected result of the scrapping of 1,300 MW capacity from obsolete wind turbines combined with the simultaneous building of 1,800 MW capacity of modern wind turbines – a process also known as repowering.[92]
Electricity exports from Denmark
In 2020, Denmark produced 16.3 TWh of wind power, of which 15 TWh (91.8%) were consumed in Denmark, measured hourly. A further 0.8 TWh of wind power were imported.[93]
In 2017, annual wind power production corresponded to about 43% of electricity consumed in Denmark.[94] The proportion of this that is actually consumed in Denmark has been disputed, as the larger hydropower resources of Norway (and to some extent, Sweden) is used as grid storage with low loss. Hydropower can rapidly reduce generation whenever wind farms are generating power, saving water for later, and can export electricity to Denmark when wind power output drops. Short term, Denmark imports electricity from Norway during daytime and exports in nighttime. Long term, Denmark imports electricity in summer and exports in winter. Wind is higher in autumn and winter, when consumption is also high.[95] This service of timeshifting production and consumption is also found around the world in pumped-storage hydroelectricity balancing coal and nuclear plants.
For timeshifting trade with Norway, Denmark exports at DKK 157/MWh and imports at DKK 212/MWh.[49] The correlation is low between wind power in Norway and Denmark.[95] Market price sometimes falls to near or below zero, particularly in high winds and low consumption.[96] In 2014, there were 46 hours with negative prices, costing DKK 37.7 million.[97] In 2015, negative prices occurred in 65 hours in West Denmark and 36 hours in East Denmark – less than 1% of the time. Danish prices are mainly negative when German prices are even more negative;[98] 90% of curtailment happens as a request from German power producers, and represents 2% (or DKK 80 million in 2018) of wind power production.[99] In most years, curtailment mainly happened at thermal power plants, but became mostly by wind turbines in 2020.[100] In 2019, Germany paid for curtailment of 420 GWh of Danish wind power, and the number increased to 1,463 GWh in 2020 (plus 1,066 GWh for thermal power), earning DKK 522 million.[101]
The 24-hour period of 2 September 2015 was the first occasion when most electricity came from wind, and no central power plants were running in West Denmark, while grid stability was maintained by compensators.[5][102]
Denmark is generally a transit country for electricity trade between the much larger markets in Norway, Sweden, Germany and Netherlands (COBRAcable),[102][103] and plans to add cables to England (Viking Link) as well, further increasing the function of being a crossroads for electricity.
From 2005 to 2010, claims of up to 40% of wind power being exported have been made[who?],[104][105] countered by claims that only 1% was exported.[106]
According to the first argument, power in excess of immediate demand is exported to neighbouring countries at lower prices. Part of the benefit of this goes to Denmark's northern neighbours: when Denmark exports power, it is sold at the spot market price which must be lower than at the importing market to be transmitted.
According to the second argument, the correlation between exports and wind power is weak, and a similar correlation exists with conventional thermal plants running partly for district heating; meanwhile, causal analysis shows that export from Denmark typically occurs as a consequence of the merit order effect, when large thermal plants have reserve capacities at times the spot market price of electricity is high.
In any case, the export price is the intermediate between the prices of the two areas, so the exporting TSO (Energinet) uses the profit to relieve tariffs[107] at around DKK 500 million per year.[108] Wind power organisations state that Denmark exports power at a higher price than it imports at.[109]
Economic conditions
Wind turbine industry
The Danish wind turbine industry is the world's largest.[citation needed] Around 90% of the national output is exported, and Danish companies accounted for 38% of the world turbine market in 2003, when the industry employed some 20,000 people and had a turnover of around 3 billion euro.[110] The return on investment dropped from near 20% before the financial crisis, to 10% some years later.[111][112] The Danish wind turbine industry had a turnover of DKK 84 billion in 2014.[113]
The development of wind power in Denmark has been characterised by a close collaboration between publicly financed research and industry in key areas such as research and development, certification, testing, and the preparation of standards.[114] For example, in the 1980s, a large number of small Danish companies were developing wind turbines to sell to California, and the Danish Risø laboratory provided test facilities and certification procedures. These resulted in reliable products and the rapid expansion of the Danish turbine manufacturing industry.[115] Components are tested at LORC in Odense, and new large prototype turbines between 4–8 MW (including some non-Danish ones) are being tested at Østerild. Limited production turbines (four Siemens 7MW with 66kV cabling) are to be supported at Nissum Bredning at a cost of DKK 300m, partially financed by local people.[116][117][118]
Denmark's electricity costs (including PSO; costs for cleaner energy) are average in the EU,[120][121][122] but taxes increase the price to the highest in Europe.[123] The tax money is a considerable income for the state, and changing the composition of the taxes towards a "greener" mix is difficult. According to a government official, the majority of taxes are not based on environment concerns,[124] in contrast to the DKK 5 billion per year in PSO-money for cleaner energy, paid by electricity consumers to producers of clean electricity. These tolls are not available for government consumption.[125]
Actual consumer-paid incentives (PSO) to new wind turbines depend on year of commission, but is generally around 25 øre (3.4 eurocent) per kWh for a limited number of hours, although support is discounted if combined price exceeds 58 øre/kWh. PSO is also used for biomass, solar, and district heating; total PSO was DKK 5.8 billion in 2013, of which DKK 3.2 billion went to wind power.[125] In 2015, the cost of power was only 32% of the price, while PSO was 9%, and tolls and VAT the remaining 59%.[119] In 2021, the Thor offshore contract was the first time a developer had to pay connection costs in Denmark, and also pay the state.[82]
Wind power displaces coal, oil and gas to some degree, reducing running cost for fossil fuels. Consumption of coal was more than halved from 1990 to 2020.[126][30] Wind power reduces price variability slightly.[127]
Criticism
In 2009, the think tank Institute for Energy Research (IER) commissioned the Danish think-tank CEPOS (Centre for Political Studies) to report on electricity exports from Denmark and the economic impact of the Danish wind industry. The resulting report states that Danes pay the highest residential electricity rates in the European Union (mostly for government revenue, but partly to subsidise wind power), and that the cost of saving a ton of carbon dioxide between 2001 and 2008 has averaged 647 DKK (€87, US$124). It also estimated that 90% of wind industry jobs were transferred from other technology industries, and states that as a result Danish GDP is 1.8 billion DKK (US$270 million) lower than it would have been without wind industry subsidies of 1.7–2.6 billion DKK (roughly $320M – $480M) yearly in 2001–2005.[128]
The report was later heavily criticised.[129]
The Danish engineering magazine Ingeniøren claimed that the report was ordered and paid for by the American oil and coal lobby through IER.[130]
Later, several Danish researchers and professors from all technical universities in Denmark wrote a joint response to the report, refuting it.[131][132]
The report from CEPOS was even brought to government level, where minister of Climate and Energy Lykke Friis discredited the work done by CEPOS and the report.[133]
The World Nuclear Association estimates that the report was IER's response to US president Obama's 2009 Earth Day speech in Newton, Iowa, claiming that the United States could generate 20% of its electricity from wind by 2030, as Denmark already was.[134][135]
To encourage investment in wind power, families were offered a tax exemption for generating their own electricity within their own or an adjoining municipality.[136] While this could involve purchasing a turbine outright, more often families purchased shares in wind turbine cooperatives which in turn invested in community wind turbines. By 1996 there were around 2,100 such cooperatives in the country.[136] Opinion polls show that this direct involvement has helped the popularity of wind turbines, with some 86% of Danes supporting wind energy when compared with existing fuel sources.[110]
The role of wind turbine cooperatives is not limited to single turbines. The Middelgrunden offshore wind farm – with 20 turbines the world's largest offshore farm at the time it was built in 2000 – is 50% owned by the 10,000 investors in the Middelgrunden Wind Turbine Cooperative, and 50% by the municipal utility company,[137] as is the Avedøre near-shore turbines.
By 2001 over 100,000 families belonged to wind turbine cooperatives, which had installed 86% of all the wind turbines in Denmark.[138] By 2004 over 150,000 were either members or owned turbines, and about 5,500 turbines had been installed, although with greater private sector involvement the proportion owned by cooperatives had fallen to 75%.[110] The cooperative model has also spread to Germany and the Netherlands.
Samsø Island
The island of Samsø erected 11 one-megawatt, land-based wind turbines in 2000, followed by ten offshore 2.3 MW wind turbines completed in 2003. Together with other renewable energy measures, this community of 4,200 achieved fame,[139] claiming that it is the largest carbon neutral settlement on the planet.[140]
This claim exploits the general understanding that one can neglect carbon-dioxide and other pollution from fossil fuel consumption (cars, imported electricity, heating for houses, etc.), If the yearly average electricity production from sustained sources is higher than the total energy consumed.[citation needed] However, the government of Samsø is addressing the fossil fuel consumption issue in motoring – they've decided that all traffic on Samsø is to go electric.
^Hansen, Hans Christian (1985): "Poul la Cour, grundtvigianer, opfinder og folkeoplyser." Doctoral thesis in Danish with an English summary. ExtractArchived 13 September 2016 at the Wayback Machine
^ abcdTherese Kofoed Jensen, Adviser, Danish Energy Agency (14 March 2014). "Offshore investments in Denmark"(PDF). Danish Energy Agency. Archived from the original(PDF) on 18 April 2014. Retrieved 17 April 2014.{{cite web}}: CS1 maint: multiple names: authors list (link)
^Lund 2010, p. 6 "The cost of wind power is paid solely by the electricity consumers and the net influence on consumer prices was as low as 1–3 percent on average in the period 2004–2008. In 2008, the net influence even decreased the average consumer price, although only slightly."
^ abHannele Holttinen, Simo Rissanen, Xiaoli Larsen, Anne Line Løvholm. "Wind and load variability in the Nordic countries" pages 20, 25, 53. VTT Technical Research Centre of Finland, 2013. Quote: "correlation between Finland and Denmark, and Norway and Denmark is almost non-existent" "Wind power production is higher during autumn and winter in all countries and the Nordic region." "in Denmark where the production is at the highest level in the afternoons from 1 to 5 pm"
^"Analysis of Wind Power in the Danish Electricity Supply in 2005 and 2006"(PDF). Techconsult. 8 October 2007. Retrieved 4 April 2009. It is often said that wind power covers ca. 20% of Danish electricity consumption. It is more correct to say that the production of power by Danish wind turbines corresponds to about 20% of electricity demand. But a considerable part of the wind energy produced is exported to neighbouring countries and thus does not cover any part of Danish electricity consumption. (...) For the whole country the degree of cover in 2005 was 13.6% (not 18.7% as stated by the Wind Turbine Industry), and in 2006 it was 10.3%, not 17%. Translation of "Analyse af Vindkraft i Dansk Elforsyning 2005 og 2006", Summary.
^Sharman, Hugh (May 2005). "Why Wind Power Works in Denmark"(PDF). Proceedings of ICE, Civil Engineering. Thomas Telford, Ltd.: 66–72. Archived from the original(PDF) on 29 January 2011. Retrieved 4 April 2009.
^Lund 2010, pp. 20–21 "the wind export in 2008 was only 61 GWh, equal to approx. 1 percent of the wind power production"
^"Nuclear Energy in Denmark". World Nuclear Association. Archived from the original on 5 March 2016. Retrieved 7 March 2016. the CEPOS report was funded by American Institute of Energy Research .. and seems to be aimed at addressing the analogy made by President Barack Obama in his 22 April 2009 Earth Day speech, where he cited the example of Denmark and claimed that, by 2030, the USA could generate 20% of its electricity from wind
^Obama, Barack. "Remarks by the President in Newton, IAArchived 2017-01-26 at the Wayback Machine" White House Office of the Press Secretary, 22 April 2009. Quote: "Even as we're conserving energy, we need to change the way we produce energy.
Today, America produces less than 3 percent of our electricity through renewable sources like wind and solar – less than 3 percent. Now, in comparison, Denmark produces almost 20 percent of their electricity through wind power."
Lund, Henrik; et al. (19 February 2010). Danish Wind Power Export and Cost(PDF). CEESA (Coherent Energy and Environmental System Analysis) Research Project. Department of Development and Planning, Aalborg University. ISBN978-87-91830-40-2. Retrieved 2 November 2011.
Keuskupan Vila RealDioecesis VilaregalensisDiocese de Vila RealKatedral Vila RealLokasiNegaraPortugalProvinsi gerejawiBragaMetropolitKeuskupan Agung BragaStatistikLuas4.237 km2 (1.636 sq mi)Populasi- Total- Katolik(per 2010)293.400289,600 (98.7%)InformasiRitusRitus LatinPendirian20 April 1922KatedralKatedral Santo Dominikus di Vila RealPelindungDikandung Tanpa NodaKepemimpinan kiniPausFransiskusUskupAmândio José TomásUskup agungJorge IVPetaSitus webSitus Web…
Este artículo o sección necesita referencias que aparezcan en una publicación acreditada.Este aviso fue puesto el 19 de enero de 2018. Diagrama 1. Apariencia del espacio-tiempo a lo largo de una línea de universo de un observador acelerado.La dirección vertical indica el tiempo, la horizontal indica la distancia espacial, la línea punteada es la trayectoria del observador en el espacio tiempo. El cuarto inferior representa el conjunto de sucesos pasados visibles al observador. Los puntos p…
Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Alexandra David-Néel – berita · surat kabar · buku · cendekiawan · JSTOR Alexandra David-NéelAlexandra David-Néel in Tibet, 1933LahirLouise Eugénie Alexandrine Marie David(1868-10-24)24 Oktober 1868Sain…
Questa voce o sezione sull'argomento competizioni calcistiche non è ancora formattata secondo gli standard. Commento: correggere i calendari come da modello. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Prima Divisione 1932-1933 Competizione Prima Divisione Sport Calcio Edizione 5ª Organizzatore Direttorio Divisioni Superiori Date dal 2 ottobre 1932al 25 giugno 1933 Luogo Italia Partecipanti 121 Risultati P…
Kota ParepareKotaTranskripsi bahasa daerah • Lontara Bugisᨀᨚᨈ ᨄᨑᨙᨄᨑᨙDari kiri kanan, atas ke bawah: Monumen Habibie Ainun, Masjid Terapung B.J. Habibie, GPIB Immanuel Parepare, dan Taman Mattirotasi. LambangJulukan: Kota Cinta Habibie & AinunMotto: ᨆᨔᨗᨉᨗ ᨔᨗᨑᨗ ᨆᨔᨗᨉᨗ ᨁᨕᨘ massiddi siri massiddi gau(Bugis) Satu prinsip, satu perbuatanPetaKota PareparePetaTampilkan peta SulawesiKota ParepareKota Parepare (Indonesia)Tam…
Perlindungan serangan udara di Nagasaki Perlindungan serangan udara adalah struktur untuk perlindungan non-kombatan serta kombatan terhadap serangan musuh dari udara. Mereka mirip dengan bunker dalam banyak hal, meskipun mereka tidak dirancang untuk bertahan melawan serangan darat (tetapi banyak yang telah digunakan sebagai struktur pertahanan dalam situasi seperti itu). Pada November 1937, hanya ada kemajuan yang lambat, karena kurangnya data yang menjadi dasar rekomendasi desain dan Komite men…
The harbour of Willemstad, capital of Curaçao. This article presents a list of populated places in Curaçao. Curaçao is a Lesser Antilles island country in the southern Caribbean Sea and the Dutch Caribbean region, about 65 km (40 mi) north of the Venezuelan coast. It is a constituent country (Dutch: land) of the Kingdom of the Netherlands. The island is divided in three districts. The current division dates from 1930.[1] Bandabou - North-west Barber Lagún Sint Willibrordus …
.et البلد إثيوبيا الموقع الموقع الرسمي تعديل مصدري - تعديل et. هو نطاق إنترنت من صِنف مستوى النطاقات العُليا في ترميز الدول والمناطق، للمواقع التي تنتمي لإثيوبيا.[1][2] مراجع ^ النطاق الأعلى في ترميز الدولة (بالإنجليزية). ORSN [الإنجليزية]. Archived from the original on 2019-05-07. Ret…
Barca beralih ke halaman ini. Untuk jenderal Hannibal Barca, lihat Hannibal. Untuk tim cadangan, lihat FC Barcelona B. Untuk tim futsal, lihat FC Barcelona Futsal. Untuk tim sepak bola putri, lihat FC Barcelona Femení. Penyuntingan Artikel oleh pengguna baru atau anonim untuk saat ini tidak diizinkan.Lihat kebijakan pelindungan dan log pelindungan untuk informasi selengkapnya. Jika Anda tidak dapat menyunting Artikel ini dan Anda ingin melakukannya, Anda dapat memohon permintaan penyuntingan, d…
le Tholon Le Tholon à Aillant-sur-Tholon. Cours du Tholon (carte interactive du bassin de l'Yonne). Caractéristiques Longueur 37,9 km [1] Bassin 167 km2 [1] Bassin collecteur la Seine Débit moyen 0,823 m3/s (Champvallon) [2] Régime pluvial Cours Source au lieu dit le Vivier · Localisation Parly · Altitude 217 m · Coordonnées 47° 44′ 17″ N, 3° 22′ 02″ E Confluence l'Yonne · Localisation Cézy · Altitude 78 m · Coordonnée…
Species of alga Chlamydomonas reinhardtii Scientific classification (unranked): Viridiplantae Division: Chlorophyta Class: Chlorophyceae Order: Chlamydomonadales Family: Chlamydomonadaceae Genus: Chlamydomonas Species: C. reinhardtii Binomial name Chlamydomonas reinhardtiiP.A.Dang. Chlamydomonas reinhardtii is a single-cell green alga about 10 micrometres in diameter that swims with two flagella. It has a cell wall made of hydroxyproline-rich glycoproteins, a large cup-shaped chloroplast, a…
David W. C. MacMillanFRS FRSELahir1968 (umur 55–56)Bellshill, ScotlandAlmamaterUniversity of Glasgow (BSc)University of California, Irvine (PhD, 1996)PenghargaanCorday-Morgan medalMember of the National Academy of Sciences (2018)Nobel Prize in Chemistry (2021)Karier ilmiahInstitusi Princeton University California Institute of Technology University of California, Berkeley Harvard University DisertasiStereocontrolled formation of bicyclic tetrahydrofurans and Enantioselective total …
ХристианствоБиблия Ветхий Завет Новый Завет Евангелие Десять заповедей Нагорная проповедь Апокрифы Бог, Троица Бог Отец Иисус Христос Святой Дух История христианства Апостолы Хронология христианства Раннее христианство Гностическое христианство Вселенские соборы Ни…
Bombing in Kabul, Afghanistan 2021 Kabul school bombingPart of the War in Afghanistan andthe 2021 Afghanistan attacksBombing2021 Kabul school bombing (Kabul)Location of the schoolLocationKabul, AfghanistanDate8 May 2021TargetHazarasAttack typeBombingWeaponsCar bombDeaths90Injured240PerpetratorsDisputed vteWar in Afghanistan (2001–2021)History Timeline 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Battles and operationsvteInvasion Cresc…
Pour les articles homonymes, voir Cartel. Cet article est une ébauche concernant la criminalité. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Un cartel de la drogue est une organisation criminelle qui est dirigée par un Jefe (chef en espagnol) ou un « baron de la drogue », développée avec pour principal objectif de promouvoir et de contrôler les opérations de trafic de drogues. Les cartels de l…