The Chernobyl Nuclear Power Plant (ChNPP; Ukrainian: Чорнобильська атомна електростанція, romanized: Chornobylska atomna elektrostantsiia; Russian: Чернобыльская атомная электростанция, romanized: Chernobylskaya atomnaya elektrostantsiya) is a nuclear power plant undergoing decommissioning. ChNPP is located near the abandoned city of Pripyat in northern Ukraine, 16.5 kilometers (10 mi) northwest of the city of Chernobyl, 16 kilometers (10 mi) from the Belarus–Ukraine border, and about 100 kilometers (62 mi) north of Kyiv. The plant was cooled by an engineered pond, fed by the Pripyat River about 5 kilometers (3 mi) northwest from its juncture with the Dnieper river.
Originally named for Vladimir Lenin, the plant was commissioned in phases with the four reactors entering commercial operation between 1978 and 1984. In 1986, in what became known as the Chernobyl disaster, reactor No. 4 suffered a catastrophic explosion and meltdown; as a result of this, the power plant is now within a large restricted area known as the Chernobyl Exclusion Zone. Both the zone and the power plant are administered by the State Agency of Ukraine on Exclusion Zone Management. The three other reactors remained operational post-accident maintaining a capacity factor between 60 and 70%. In total, units 1 and 3 had supplied 98 terawatt-hours of electricity each, with unit 2 slightly less at 75 TWh.[1] In 1991, unit 2 was placed into a permanent shutdown state by the plant's operator due to complications resulting from a turbine fire. This was followed by Unit 1 in 1996 and Unit 3 in 2000. Their closures were largely attributed to foreign pressures. In 2013, the plant's operator announced that units 1–3 were fully defueled, and in 2015 entered the decommissioning phase, during which equipment contaminated during the operational period of the power station will be removed. This process is expected to take until 2065 according to the plant's operator.[2] Although the reactors have all ceased generation, Chernobyl maintains a large workforce as the ongoing decommissioning process requires constant management.[3]
From 24 February to 31 March 2022, Russian troops occupied the plant as part of their invasion of Ukraine.[4][5]
Construction
Construction of the plant began in 1972. The Chernobyl NPP was meant to have 12 units, made up of 6 construction phases, and if completed would be the biggest nuclear power plant in the world. The plant would eventually consist of four RBMK-1000 reactors, each capable of producing 1,000 megawatts (MW) of electric power (3,200 MW of thermal power), and the four together produced about 10% of Ukraine's electricity.[6] Like other sites which housed multiple RBMK reactors such as Kursk, the construction of the plant was also accompanied by the construction of a nearby city to house workers and their families. In the case of the ChNPP, the new city was Pripyat. Construction of the station concluded in the late 1970s, with reactor No. 1 being commissioned in 1977. It was the third Soviet RBMK nuclear power plant, after the Leningrad and Kursk power plants, and the first plant on Ukrainian soil.[7]
The completion of the first reactor in 1977 was followed by reactor No. 2 in 1978, No. 3 in 1981, and No. 4 in 1983. Two more blocks, numbered five and six, of more or less the same reactor design, were planned at a site roughly a kilometer from the contiguous buildings of the four older blocks. This is similar to the layout of units 5 and 6 at Kursk and shows the similarity in design between the RBMK sites. Reactor No. 5 was around 70% complete at the time of Reactor 4's explosion and was scheduled to come online approximately seven months later, on November 7, 1986. In the aftermath of the disaster, construction on No. 5 and 6 was suspended, and eventually cancelled in April 1989, days before the third anniversary of the 1986 explosion.[8] At one point six other reactors were planned on the other side of the river, bringing the total to twelve.[9] This would have made Chernobyl as the most powerful nuclear plant in the world if completed.[citation needed]
Reactors No. 3 and 4 were second-generation units, whereas No. 1 and 2 were first-generation units, like those in operation at the Kursk power plant. Second-generation RBMK designs were fitted with a more secure containment structure visible in photos of the facility.[10]
Design
Electrical systems
The power plant is connected to the 330 kV and 750 kV electrical grid. The block has two electrical generators connected to the 750 kV grid by a single generator transformer. The generators are connected to their common transformer by two switches in series. Between them, the unit transformers are connected to supply power to the power plant's own systems; each generator can therefore be connected to the unit transformer to power the plant, or to the unit transformer and the generator transformer to also feed power to the grid.[11]
The 330 kV line was normally not used, and served as an external power supply, connected to a station's transformer – meaning to the power plant's electrical systems. The plant was powered by its own generators, or at any event got power from the 750 kV national grid through the main grid backup feed in transformer, or from the 330 kV level feed in grid transformer 2, or from the other power plant blocks via two reserve busbars. In case of total external power loss, the essential systems could be powered by diesel generators. Each unit's transformer is therefore connected to two 6 kV main power line switchboards, A and B (e.g., 7A, 7B, 8A, 8B for generators 7 and 8), powering principal essential systems and connected to even another transformer at 4 kV, which is backed up twice (4 kV reserve busbar).[11]
The 7A, 7B, and 8B boards are also connected to the three essential power lines (for the coolant pumps), each also having its own diesel generator. In case of a coolant circuit failure with simultaneous loss of external power, the essential power can be supplied by spinning down turbogenerators for about 45 to 50 seconds, during which time the diesel generators should start. The generators were started automatically within 15 seconds at loss of off-site power.[11]
Turbo generators
Electrical energy was generated by a pair of 2x500 MW hydrogen-cooled turbo generators per unit. These are located in the 600 metres (1,969 ft)-long machine hall, adjacent to the reactor building. The turbines—the venerable five-cylinder K-500-65/3000—were supplied by the Kharkiv turbine plant; the electrical generators are the TBB-500. The turbine and the generator rotors are mounted on the same shaft; the combined weight of the rotors is almost 200 tonnes (220 short tons) and their speed was 3,000 revolutions per minute.[12][failed verification]
The turbo generator is 39 m (128 ft) long and its total weight is 1,200 t (1,300 short tons). The coolant flow for each turbine is 82,880 t/h. The generator produced 20 kV 50 Hz AC power. The generator's stator was cooled by water while its rotor was cooled by hydrogen. The hydrogen for the generators was manufactured on-site by electrolysis.[12] The design and reliability of the turbines earned them the State Prize of Ukraine for 1979.
The Kharkiv turbine plant later developed a new version of the turbine, K-500-65/3000-2, in an attempt to reduce use of valuable metal. The Chernobyl plant was equipped with both types of turbines; block 4 had the newer ones. The newer turbines, however, turned out to be more sensitive to their operating parameters, and their bearings had frequent problems with vibrations.[13]
Reactor fleet
The construction of two partially completed reactors, No. 5 and 6, were suspended immediately after the accident at reactor No. 4, and eventually cancelled in 1989.[14] Reactors No. 1 and 3 continued to operate after the disaster. Reactor No. 2 was permanently shut down in 1991 after a fire broke out due to a faulty switch in a turbine. Reactors No. 1 and 3 were to be eventually closed due to a 1995 agreement Ukraine made with the European Union (EU).
Ukraine agreed to close the remaining units in exchange for EU assistance in modernizing the shelter over reactor No. 4 and improving the energy sector of the country, including the completion of two new nuclear reactors, Khmelnitski 2 and Rovno 4. Reactor No. 1 was shut down in 1996 with No. 3 following in 2000.[15]
Computer systems
SKALA (Russian: СКАЛА, система контроля аппарата Ленинградской Атомной; sistema kontrolya apparata Leningradskoj Atomnoj, "Control system of the device of the Leningrad Nuclear [Power Plant]", lit. "rock"[16]) was the process computer for the RBMK nuclear reactor at the Chernobyl nuclear power plant prior to October 1995.[17] Dating to the 1960s, it used magnetic-core memory, magnetic tape data storage, and punched tape for loading software.
SKALA monitored and recorded reactor conditions and control board inputs. It was wired to accept 7200 analog signals and 6500 digital signals.[18] The system continuously monitored the plant and displayed this information to operators. Additionally, a program called PRIZMA (Russian: ПРИЗМА, программа измерения мощности аппарата; programma izmereniya moshchnosti apparata, "Device power measurement program", lit. "prism"[16]) processed plant conditions and made recommendations to guide plant operators. This program took 5 to 10 minutes to run, and could not directly control the reactor.[19]
Known accidents and incidents
1982 reactor #1 partial meltdown
On 9 September 1982, a partial core meltdown occurred in reactor No. 1 due to a faulty cooling valve remaining closed following maintenance. Once the reactor came online, the uranium in the tank overheated and ruptured. The extent of the damage was comparatively minor, and no one was killed during the accident. However, due to the negligence of the operators, the accident was not noticed until several hours later, resulting in significant release of radiation in the form of fragments of uranium oxide and several other radioactive isotopes escaping with steam from the reactor via the ventilation stack. The accident was not made public until several years later, despite cleanups taking place in and around the power station and Pripyat. The reactor was repaired and put back into operation after eight months.[20]
1984 reactor #3 and #4 incident
According to KGB documents, declassified in Ukraine on 26 April 2021,[21] serious incidents occurred in the third and fourth reactors in 1984. According to the same documents, the central government in Moscow knew as early as 1983 that the powerplant was "one of the most dangerous nuclear powerplants in the USSR". It had to do with the building's integrity. The room which housed the steam separators, got as hot as 270 degrees Celsius. That caused the concrete of the building to shift its position, which made the building unsafe and could also result in the collapse of the steam separators, which would then fall onto the reactor hall, causing a nuclear meltdown.
On 26 April 1986, reactor No. 4 suffered catastrophic meltdown resulting in a core explosion and open-air fires. This caused large quantities of radioactive materials to be dispersed in the atmosphere and surrounding land. The disaster is regarded as the worst accident in the history of nuclear power.
Reactor No. 2 was permanently shut down shortly after October 1991 when a fire broke out due to a faulty switch in a turbine.[23]
On 11 October 1991, a fire broke out in the turbine hall of reactor No. 2.[24] The fire began in reactor No. 2's fourth turbine, while the turbine was being idled for repairs. A faulty switch caused a surge of current to the generator, igniting insulating material on some electrical wiring.[25] This subsequently led to hydrogen, used as a coolant in the synchronous generator, being leaked into the turbine hall "which apparently created the conditions for fire to start in the roof and for one of the trusses supporting the roof to collapse."[26] The adjacent reactor hall and reactor were unaffected, but due to the political climate it was decided to shut down this reactor permanently after this incident.
The Chernobyl Exclusion Zone was the site of fighting between Russian and Ukrainian forces during the Battle of Chernobyl as part of the Russian invasion of Ukraine. On 24 February 2022, Russian forces captured the plant.[4][28] The resulting activity reportedly led to a 20-fold increase of detected radiation levels in the area due to disturbance of contaminated soil.[29]
On 9 March 2022, there was a power cut at the plant itself. No radiation leaks were reported as of 9 March 2022. However, Ukrainian authorities reported that there was a risk of a radiation leak due to spent fuel coolant being unable to circulate properly.[30]
On 31 March 2022, Russian forces formally handed control of the plant back to its employees, and most occupying forces withdrew. Ukrainian National Guard personnel were moved to Belarus as prisoners of war.[31][5] On 2 April 2022, Ukrainian media reported that the flag of Ukraine was raised at the plant.[32]
Chernobyl operator Energoatom claimed that Russian troops had dug trenches in the most contaminated part of the Chernobyl exclusion zone, receiving "significant doses" of radiation.[3]BBC News mentioned unconfirmed reports that some were being treated for radiation burns in Belarus.[3]
Decommissioning
After the explosion at reactor No. 4 and construction of the sarcophagus, the remaining three reactors were de-contaminated and re-launched (reactor No. 1 on 1 October, 1986, reactor No. 2 on 5 November, 1986, & reactor No. 3 on 4 December, 1987) and continued to operate until the post-Soviet period.[33] The Chernobyl New Safe Confinement is equipped with 2 overhead main cranes, which will be used to remove unstable parts of the original sarcophagus.[34][35] The majority of the external gamma radiation emissions at the site are from the isotopecaesium-137, which has a half-life of 30.17 years. As of 2016[update], the radiation exposure from that radionuclide has declined by half since the 1986 accident.
On 11 October, 1991, reactor No. 2 caught fire, and was subsequently shut down.[23] Ukraine's 1991 independence from the Soviet Union generated further discussion on the Chernobyl topic, because the Verkhovna Rada, Ukraine's new parliament, was composed largely of young reformers. Discussions about the future of nuclear energy in Ukraine ultimately moved the government toward a decision to decommission reactor No. 2.
On 30 November 1996, following pressure from foreign governments, reactor No. 1 was shut down.[36] Removal of uncontaminated equipment began at reactor No. 1 in 2007.[37][needs update]
On 15 December 2000, reactor No. 3 was shut down after operating briefly since March 1999 following almost 3 months of repairs,[38][39] and the plant as a whole ceased producing electricity.[36] In April 2015, units 1 through 3 entered the decommissioning phase.[40] Upon being shut down, the plant was re-classified as a 'State Special Enterprise,' while 'V. I. Lenin' was removed from the name following Ukraine's independence.
In 2013, the pump lifting river water into the cooling reservoir adjacent to the facility was powered down, with the thermal sink expected to slowly evaporate.[41]
Originally announced in June 2003, a new steel containment structure named the New Safe Confinement was built to replace the aging and hastily built sarcophagus that protected ruined reactor No. 4.[42] Though the project's development had been delayed several times, construction officially began in September 2010.[43] The New Safe Confinement was financed by an international fund managed by the European Bank for Reconstruction and Development and was designed and built by the French-led consortium Novarka.[44]
In February 2013, a 600 square metres (6,458 sq ft) portion of the roof and wall adjacent to the covered part of the turbine hall collapsed into the entombed area of the turbine hall. The collapse did not affect any other part of the Object Shelter (sarcophagus) or the New Safe Confinement. No variances in radiation levels as a result of the incident were detected.[45] The collapsed roof was built after the Chernobyl disaster and was later repaired.[46]
Novarka built a large arch-shaped structure out of steel 270 meters (886 ft) wide, 100 meters (328 ft) high, and 150 meters (492 ft) long to cover the old crumbling concrete dome that was in use at the time.[36] The structure was built in two segments which were joined in August 2015.[47] In November 2016, the completed arch was placed over the existing sarcophagus.[48] This steel casing project was expected to cost $1.4 billion, and was completed in 2017. The casing also meets the definition of a nuclear entombment device.[49]
A separate deal has been made with the American firm Holtec International to build a storage facility within the exclusion zone for nuclear waste produced by Chernobyl.[50][51][52] This facility, named the Interim Storage Facility 2, has storage for the 21,297 Spent Fuel assemblies currently at the power plant, which will be loaded into approximately 231 waste canisters, and stored in the ISF-2 for 100 years.[53] In 2020, the storage facility was completed, and on November 18, 2020, the first canister of nuclear waste was loaded into the storage area.[54]
^"Soviets Cancel Plans for 2 New Reactors at Chernobyl". Los Angeles Times. Moscow, USSR. Times Wire Services. 21 April 1989. Archived from the original on 27 June 2019. Retrieved 26 August 2019. The Soviet Union has canceled plans to construct two more reactors at the stricken Chernobyl nuclear power station...The decision was announced six days before the third anniversary of the accident at Chernobyl...
Pyotr KoshevoyLahir21 Desember 1904Oleksandriia, Kegubernuran Kherson, Kekaisaran Rusia (sekarang Ukraina)Meninggal30 Agustus 1976(1976-08-30) (umur 71)PengabdianTentara MerahLama dinas1920–1969PangkatMarsekal Uni SovietPenghargaanPahlawan Uni Soviet (dua kali)Tanda tangan Petr Kirillovich Koshevoi (bahasa Rusia: Пётр Кириллович Кошевой) (21 Desember 1904 – 30 Agustus 1976) adalah seorang pemimpin militer Soviet. Koshevoi lahir dari kelua…
Galileo di fronte al Sant'Uffizio, dipinto di Joseph-Nicolas Robert-Fleury. Il celebre processo a Galileo Galilei si tenne nel 1633 e venne istruito in quanto il celebre scienziato era sospettato di eresia, all'epoca una fattispecie di reato perseguito dall'Inquisizione romana. Il procedimento si concluse con la condanna all'abiura. Il diritto dell'età moderna è il diritto vigente in Europa dalla fine del Basso Medioevo, solitamente collocata intorno alla metà del XV secolo, fino alla Rivoluz…
John HageePotret Pendeta John Hagee tahun 2022LahirJohn Charles Hagee12 April 1940 (umur 83)Texas, Amerika SerikatKebangsaan Amerika SerikatPendidikanSouthwestern Assemblies of God UniversityTrinity UniversityUniversitas Texas UtaraSuami/istriMartha Downing (m. 1960–1975) Diana Castro (m. 1976)AnakMatthew HageeChristopher HageeSandy HageeTis HageeChristina HageeOrang tuaWilliam Bythel Hagee (Ayah) Vada …
Stasiun Togura戸倉駅Stasiun Togura, Mei 2009Lokasi1445 Togura, Chikuma-shi, Nagano-ken 389-0804 JepangKoordinat36°29′32″N 138°09′11″E / 36.49222°N 138.15306°E / 36.49222; 138.15306Ketinggian376 m[butuh rujukan]Operator Shinano RailwayJalur■ Jalur Kereta ShinanoLetak54.9 km dari KaruizawaJumlah peron1 peron sisi + peron pulauJumlah jalur3Informasi lainStatusStaffedSitus webSitus web resmiSejarahDibuka11 Februari 1912PenumpangFY20112,650 harian…
Auguste BurdeauBiografiKelahiran10 September 1851 Lyon Kematian12 Desember 1894 (43 tahun)Palais Bourbon Tempat pemakamanPemakaman Père-Lachaise, 65 Grave of Auguste Burdeau (en) President of the Chamber of Deputies of Italy (en) 5 Juli 1894 – 12 Desember 1894 ← Jean Casimir-Perier (en) – Henri Brisson (en) → Minister of the Navy (en) 13 Juli 1892 – 11 Januari 1893 ← Éléonore-Louis Godefroi Cavaignac (en) – H…
Terremotos de Turquíay Siria de 2023 7.8[1] y 7.5[2] en potencia de Magnitud de Momento (MW) Localización de los epicentros de los dos sismos principales que azotaron Turquía y Siria En el sentido de las agujas del reloj desde arriba a la izquierda: vista aérea y edificio derrumbado de la provincia de Hatay, una vista de los restos de Alepo, Siria, equipos de búsqueda y rescate de Chinese Blue Sky e iraníes en Adıyaman, una asistencia de USAID en la Base aérea de Incirlik y…
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Februari 2023. Artikel ini bukan mengenai EMD SDP40. EMD SDP40FEMD SDP40F No. 629 dengan San Francisco Zephyr pada tahun 1978.Data teknisSumber tenagaDiesel elektrikProdusenGM Divisi Electro-Motive (EMD)Tanggal dibuatJuni 1973–Agustus 1974Jumlah dibuat150Spesifikasi …
Gunung RajoNagariTugu Durian Gunung RajoNegara IndonesiaProvinsiSumatera BaratKabupatenTanah DatarKecamatanBatipuhKode Kemendagri13.04.02.2005 Luas5,12 km²Jumlah penduduk2.202 jiwaSitus webgunungrajo.desa.id Gunung Rajo merupakan salah satu nagari yang termasuk ke dalam wilayah kecamatan Batipuh, Kabupaten Tanah Datar, Provinsi Sumatera Barat, Indonesia. Nagari ini terletak di dekat Batusangkar, ibu kota dari kabupaten Tanah Datar. nagari ini terkenal dengan buah duriannya yang cukup enak.…
10 MPHSampul DVDSutradaraHunter WeeksProduserHunter Weeks Josh Caldwell Johnathan F. KeoughDitulis olehHunter WeeksPemeranJosh Caldwell Hunter Weeks Johnathan F. KeoughPenata musikEverett GriffithsPenyuntingJosh CaldwellPerusahaanproduksiSpinning BlueDistributorWonderPhil ProductionsTanggal rilis29 Mei 2007 (2007-05-29)Durasi92 menitNegaraAmerika SerikatBahasaInggrisAnggaranUS $54,000 10 MPH adalah film dokumenter yang disutradarai oleh Hunter Weeks dan dibintangi oleh Josh Caldwell. …
CaneléCaneléNama lainCanneléTempat asal PrancisDaerahBordeauxDibuat olehCouvent des Annonciades[1]Suhu penyajianWarmBahan utamaTepung, susu, kuning telur, mentega, vanilla, rum, gulaSunting kotak info • L • BBantuan penggunaan templat ini Media: Canelé Canelé (bahasa Prancis: [kan.le]) adalah kue yang menjadi ciri khas daerah Bordeaux di Prancis, walaupun kini kue ini tersedia di berbagai pâtisserie di Prancis dan belahan dunia lainnya. Kue ini dib…
This is a list of flags that are inscribed with English-language text. # Flag Dates used English text 10th Mountain Division 2001–present MOUNTAIN 101st Airborne Division 2001–present AIRBORNE 82nd Airborne Division 2001–present 1. AIRBORNE2. AA[abbreviation of All American] A Flag Dates used English text Annapolis Royal –present ANNAPOLIS ROYAL N.S. Albay —present 1. PROVINCE OF ALBAY 2. OFFICIAL SEAL Anne Arundel County, Maryland 1997–1998 1. ANNE ARUNDEL COUNTY2. M…
Badan Penelitian dan Pengembangan Pertanian Kementerian PertanianRepublik IndonesiaLogo Kementerian PertanianGambaran umumDibentuk1974; 50 tahun lalu (1974)Dibubarkan2022; 2 tahun lalu (2022)Nomenklatur pengganti Organisasi Riset Pertanian dan Pangan Badan Standardisasi Instrumen Pertanian Susunan organisasiKepala BadanFadjry DjufrySekretaris Badan- Kepala PusatPusat Penelitian dan Pengembangan Tanaman Pangan-Pusat Penelitian dan Pengembangan Hortikultura-Pusat Penelitian dan Pengemban…
Artikel ini perlu diwikifikasi agar memenuhi standar kualitas Wikipedia. Anda dapat memberikan bantuan berupa penambahan pranala dalam, atau dengan merapikan tata letak dari artikel ini. Untuk keterangan lebih lanjut, klik [tampil] di bagian kanan. Mengganti markah HTML dengan markah wiki bila dimungkinkan. Tambahkan pranala wiki. Bila dirasa perlu, buatlah pautan ke artikel wiki lainnya dengan cara menambahkan [[ dan ]] pada kata yang bersangkutan (lihat WP:LINK untuk keterangan lebih lanjut). …
Penyuntingan Artikel oleh pengguna baru atau anonim untuk saat ini tidak diizinkan.Lihat kebijakan pelindungan dan log pelindungan untuk informasi selengkapnya. Jika Anda tidak dapat menyunting Artikel ini dan Anda ingin melakukannya, Anda dapat memohon permintaan penyuntingan, diskusikan perubahan yang ingin dilakukan di halaman pembicaraan, memohon untuk melepaskan pelindungan, masuk, atau buatlah sebuah akun. Halaman ini berisi artikel tentang Australia sebagai negara. Untuk Australia sebagai…
Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Windows Registry – berita · surat kabar · buku · cendekiawan · JSTOR Registry, dalam platform sistem operasi Microsoft Windows, merupakan sebuah basis data yang disusun secara hierarkis dan mengandung infor…
Untuk kegunaan lain, lihat Jatiluhur (disambiguasi). Waduk JatiluhurPemandangan lain dari Waduk Jatiluhur dilihat dari Gunung ParangNamaWaduk Ir. H. JuandaLokasiJatiluhur, Kabupaten Purwakarta, Jawa BaratKoordinat6°32′26″S 7°20′28″E / 6.5406617°S 07.34104°E / -6.5406617; 07.34104Koordinat: 6°32′26″S 7°20′28″E / 6.5406617°S 07.34104°E / -6.5406617; 07.34104KegunaanSerbagunaStatusDigunakanMulai dibangun1957Mulai diop…
Bahan baku Karet Bahan baku atau barang mentah adalah bahan yang dibeli dan digunakan dalam membuat produk akhir barang jadi yang akan dijual kepada konsumen. Bahan baku belum mengalami proses pengolahan sama sekali. Contoh bahan baku dalam hal makanan adalah mentega, gula, telur, tepung, vanili, bubuk pemuai, soda kue dan coklat untuk pembuatan produk coklat. Sedangkan biaya bahan baku adalah seluruh biaya untuk memperoleh sampai dengan bahan siap untuk digunakan yang meliputi harga bahan, ongk…
Nokia 6020 adalah produk telepon genggam yang dirilis oleh perusahaan Nokia. Telepon genggam ini memiliki dimensi 106 x 44 x 20 m dengan berat 90 gram. Nokia 6020 Fitur Kamera digital VGA, 640x480 pixels SMS MMS Obrolan Pesan suara Polifonik Permainan Pinball Backgammon II Beach Rallye Space Park Bowling Puzzle Internet GPRS Internet Inframerah Lihat pula Daftar produk Nokia Pranala luar Informasi Nokia 6020 di GSM arena