Khmelnytskyi Nuclear Power Plant

Khmelnytskyi Nuclear Power Plant
Khmelnytskyi Nuclear Power Plant
Map
CountryUkraine
LocationNetishyn
Coordinates50°18′5.06″N 26°38′59.10″E / 50.3014056°N 26.6497500°E / 50.3014056; 26.6497500
StatusOperational
Construction began1981
Commission date1987
OwnerEnergoatom
Nuclear power station
Reactor typeVVER
Reactor supplierAtomstroyexport
Power generation
Units operational2 x 1,000 MW
Make and modelTurbines and generators:
Units under const.2 x 1,000 MW
Nameplate capacity2,000 MW
External links
Websitewww.xaec.org.ua
CommonsRelated media on Commons

The Khmelnytskyi Nuclear Power Plant generates nuclear power in Ukraine. The plant is operated by Energoatom. Two VVER-1000 reactors are operational, each generating 1000 MW (net) of electricity, with two AP1000 reactors under construction.[1]

Khmelnytskyi Nuclear Power Plant is connected to the Rzeszów–Khmelnytskyi powerline, one of three 750 kV lines running between Ukraine and the European Union.[2]

On two occasions in November 2023, explosions were heard near the Khmelnitsky Nuclear Power Plant and its two Soviet-era reactors, which was assumed to be the result of near-misses by Russian missile attacks on or near the facility.[3]

History

Construction of the first reactor started under the Soviet Union in 1981 and the first unit was put in operation in late 1987. Construction of the second reactor started in 1983 with plans to finish it in 1991. In 1990, however, construction was stopped as part of a moratorium on new plant construction introduced due to public mistrust following the Chernobyl disaster. Construction was completed only in August 2004 after the moratorium was lifted.[4]

Since 1992, it has been guarded by the 3rd NPP Protection Battalion.

Two more VVER-1000 reactors were under construction: Construction of the third reactor started in September 1985 and the fourth reactor in June 1986. Construction was stopped in 1990 when they were 75% and 28% complete, respectively. An intergovernmental agreement on the resumption of construction was signed between Ukraine and Russia in June 2010.[5] On 10 February 2011, Energoatom and Atomstroyexport signed a contract agreement for the completion of reactors 3 and 4. They should have been commissioned in 2018 and 2020, respectively.[6] Feasibility study of reactors 3 and 4 was conducted by Kyiv Institute Energoproekt.

Following the Russian attack on Ukraine going on since February 2014 with varying intensity the Ukrainian government of Arseniy Yatseniuk formally terminated the agreement with Russia in September 2015.

In August 2016 an agreement with Korea Hydro & Nuclear Power was made to assist with the completion of reactors 3 and 4,[7] but little progress was made. In 2020 a Ukrainian working group assessed the safety of the old cranes on the site needed to progress construction work.[8]

Energoatom considered disconnecting unit 2 from the Ukrainian power grid and connecting it to the Burshtyn energy island centered around the coal powered Burshtyn TES, which up to 2022 was the only part of Ukraine connected to the European power grid, to facilitate exports to Poland and Hungary.[2][9] In 2019 the Ministry of Energy created a consortium, Ukraine Power Bridge Company Limited, to progress the project, but as of 2020 the project was not agreed.[10]

AP1000 reactors

In late November 2021, Energoatom and Westinghouse Electric agreed on a contract to construct the first Westinghouse AP1000 reactor in Ukraine at the Khmelnytskyi plant.[11][12]

In May 2022, Energoatom stated that the full scale Russian invasion going on since February and occupations of other power stations had not changed their ambitions to construct these units. They are still working with Westinghouse to construct two AP1000 reactors at the site.[13]

Employees from the Russia-occupied Zaporizhzhia Nuclear Power Plant will be hired on these new reactors.[14]

See also

References

  1. ^ "Ukraine: Current status of nuclear power installations". Nuclear Energy Agency (NEA). Retrieved 2024-07-19.
  2. ^ a b Alexander Bor (27 May 2016). "Ukraine to build power line for power exports to Poland, Hungary: EnergoAtom". Platts. Retrieved 16 June 2016.
  3. ^ "Nuclear disasters–in–waiting". Science. 5 January 2024. Retrieved 4 January 2024.
  4. ^ "Nuclear Power Plants in Lithuania & Ukraine". industcards.com. Archived from the original on 2012-12-09. Retrieved 2011-02-13.
  5. ^ "Khmelnitsky feasibility study progresses". World Nuclear News. 2011-02-03. Retrieved 2011-02-13.
  6. ^ "Contract agreement for Khmelnitsky 3 and 4". World Nuclear News. 2011-02-10. Retrieved 2011-02-13.
  7. ^ "Korea agrees to help with construction of Ukrainian NPP". Nuclear Engineering International. 2 September 2016. Retrieved 21 July 2017.
  8. ^ "Ukraine must expand nuclear energy, says President". World Nuclear News. 5 October 2020. Retrieved 7 October 2020.
  9. ^ "Energoatom awaits approval for energy bridge tender". World Nuclear News. 18 April 2018. Retrieved 18 April 2018.
  10. ^ "Energy Bridge has geopolitical significance, says Polenergia". World Nuclear News. 4 December 2020. Retrieved 7 December 2020.
  11. ^ "Contract signed for first AP1000 unit in Ukraine -- ANS / Nuclear Newswire". www.ans.org. Retrieved 2021-12-02.
  12. ^ "Westinghouse Electric Company and Energoatom Sign Contract for First AP1000 Unit in Ukraine". www.businesswire.com. 2021-11-22. Retrieved 2021-12-02.
  13. ^ "Ukraine planning for post-war nuclear power plants : New Nuclear - World Nuclear News".