The second largest motive power depot and repair facility on the Midland Rail was north of the station.[8] In 1861 a collision occurred at a siding near the station in which 16 people were killed and 317 were injured.
From May 1878 to September 1880 the MR Super Outer Circle service ran through the station, from St. Pancras to Earl's Court Underground station via Cricklewood and South Acton.[9]
The main line station was rebuilt in 1983, nothing of the original station building remains. The separate London Underground station was opened on 22 June 1907 by the Charing Cross, Euston and Hampstead Railway (CCE&HR), a precursor of the Northern line.[10] The station was designed by Leslie Green with the ox-blood red glazed terracotta façade and the semi-circular windows at first floor level common to most of the original stations on the CCE&HR and its two associated railways, the Baker Street and Waterloo Railway and Great Northern, Piccadilly and Brompton Railway which opened the previous year. When Kentish Town station opened the next CCE&HR station south was South Kentish Town but that station closed in 1924 due to low usage.[11]Gospel Oak station on the North London line opened in 1860 as "Kentish Town" but was given its present name in 1867 when the North London Railway opened Kentish Town West.
It was the junction of services to Barking until 1981 when services were diverted to terminate and start from Gospel Oak. The spur line to Junction Road Junction was then closed, the track was removed and the trackbed has been sold for industrial use.
In April 2023, Transport for London (TfL) announced that the Underground station would be closed for "up to a year" from 26 June 2023 to allow both escalators to be replaced.[12][13] TfL noted that the current escalators were the most unreliable on the network, owing to their age and bespoke manufacture. During the closure, the Underground station will be refurbished.[12][13]
Design
National Rail station
There are 6 tracks and 4 platforms at this station in northwest–southeast orientation.
Starting from the easternmost platform:
Platforms 1 and 2 are Thameslink platforms in regular use, where all Thameslink trains accessing the core pass through, although only a minority of them stop here.
Platforms 3 (which forms an island with platform 2) and 4 are on the slow lines of the Midland Main Line, which are normally used only by terminating services or a handful of Sunday morning services.
The fast lines of the Midland Main Line do not have platforms at this station in both directions.
The National Rail station entrance is normally locked, with access from the Underground station. It is only opened when the Underground station is closed.
London Underground station
There are 2 platforms at this station, Platform 1 heading northbound and Platform 2 heading southbound.
During the peak hours, the station is served by additional services to and from Luton, Orpington and Rainham, as well as some late evening services to and from Bedford.
The station is also served by a night service between Bedford and Three Bridges on Sunday to Friday nights.
The station is also served by a night service on Friday and Saturday nights as part of the Night Tube. The station is served by a train every 15 minutes between High Barnet and Morden via Charing Cross.
On 21 August 2020 a man was badly injured after he was hit by a sign that fell off the façade of the entrance to Kentish Town station. The sign, with the logos of TfL and British Rail, had been reported as looking as if it was about to fall, but no action was taken at the time.[16] In April 2023 it was announced that Kentish Town tube would close for one year from summer 2023, to allow for repair works, leading to fears for the impact on local business.[17]
^Radford, B., (1983) Midland Line Memories: a Pictorial History of the Midland Railway Main Line Between London (St Pancras) & Derby London: Bloomsbury Books
As the station was closed, the Northern Line platform roundels were changed. Instead of being kept to being "KENTISH TOWN", they changed it to "STATION CLOSED". Platform entrances were chained so that it could prevent trespassing if they managed to enter the station. Engineering equipment was put on the tracks, maybe to remodel the escalators.