In January 2005, the US101 was selected for the VXX Presidential Helicopter Replacement Program, and was promptly re-designated as the VH-71. However, development was subject to delays, cost overruns, and engineering issues; Lockheed attributed much of these issues to unanticipated and extensive modifications being demanded by the government that had been absent from the request for proposal (RFP) issued. A Government Accountability Office (GAO) report in 2011 also recognised that a lack of flexibility and compromise on the part of the government had negatively impacted the program. By late 2008, the cancellation of the VH-71 was looking increasingly likely.
In February 2009, PresidentBarack Obama asked Secretary of DefenseRobert Gates about placing the project on hold or canceling it because of its high cost: over $13 billion for the planned 28 helicopters. In June 2009, the U.S. Navy terminated the contract after spending about $4.4 billion and taking delivery of nine VH-71s. After the cancellation, the delivered helicopters were sold to Canada for $164 million, where they were used as source of spare parts for its fleet of AgustaWestland CH-149 Cormorant search-and-rescue helicopters.
The AgustaWestland AW101, initially designated as EH101, was originally developed and produced by EH Industries, which was a joint venture between the British Westland Helicopters and Italian Agusta companies; Westland merged with Agusta to form AgustaWestland in 2001.[1] AgustaWestland held considerable interest in the export prospects of the AW101, including the prospects for an extensive overseas manufacturing consortium. On 23 July 2002, Lockheed Martin and AgustaWestland announced that they had signed a 10-year agreement to jointly market, manufacture and support a medium-lift helicopter, an AW101 derivative, in the United States. At that time, the team declared that the derivative, which was designated as the US101, would be "65% American". The companies envisaged the aircraft being adopted in three major roles; U.S. Air Force combat search and rescue, U.S. Coast Guard search and rescue, and U.S. Marine Corps executive transport.[2][3]
In early 2002, the Lockheed-AgustaWestland partnership sought out other firms to participate in the proposed local manufacturing effort for the US101; in particular, the team pursued Bell Helicopters, which was at that time part of another EH101 consortium, offering the type in Canada.[4] That same year, Rolls-Royce Holdings, who manufactured the EH101's RTM322, also sought out an American partner to locally produce the engine; Rolls-Royce also envisioned integrating US-specific technology into the engine and its potential use in powering the Sikorsky UH-60 Black Hawk helicopter.[5][6] By August 2002, there were reports in the media, of various US aircraft manufacturers, including Bell, Boeing and Kaman Aerospace, that were holding discussions with the consortium and may potentially be selected as a subcontractor to perform the domestic assembly of the US101.[7][8][9] Boeing showed persistent interest in joining the US101 consortium, as well as in alternate arrangements to produce the NHIndustries NH90 helicopter.[10][11]
On 15 May 2003, AgustaWestland signed an agreement with Bell Helicopter to undertake final assembly of the US101 in the U.S.[12][13] Under the pact, AgustaWestland would produce the main rotor blades and main fuselage sections at its headquarters in Yeovil, UK. The company would also manufacture other components, including the gearbox, at its facility in Cascina Costa, Italy; this represents a work share of 36 per cent. The remaining 64 per cent work share was split between Lockheed Martin (31 per cent) and Bell Helicopter (27 per cent) and other firms (6 per cent).[14][15]
In February 2002, the US Marine Corps commenced a study to identify potential replacement rotorcraft for the aging Sikorsky VH-3D presidential transport helicopters.[16] On 18 December 2003, the United States Department of Defense issued a Request for Proposals (RFP) for the supply of 23 helicopters to be used as a replacement for the 11 VH-3Ds and 8 VH-60Ns of the Marine Corps' HMX-1 squadron, which performs the role of Presidential helicopter transportation; this requirement was given the designation of VXX, or the Presidential Helicopter Replacement Program.[17][18] Two companies, AgustaWestland and Sikorsky Aircraft responded to the VXX RFP; additionally, that had been interest in a potential Bell Boeing V-22 Osprey-based bid, however the rotorcraft was deemed to be non-transportable by military airlift and thus unsuitable to qualify.[19][20]
Sikorsky had proposed the VH-92, a variant of the H-92 Superhawk, in partnership with FlightSafety International, L-3 Communications, Northrop Grumman, Rockwell Collins, Vought Aircraft Industries, and GE-Aviation.[21][22] During the bidding process, Sikorsky attacked the US101 for its foreign origins; in December 2004, Sikorsky VXX programme manager Nick Lappos derided the bid as: ""What is a socialist country and a socialist company going to teach us about competition?".[23] The selection was originally to occur in April 2004, however programme officials decided to postpone their decision for a further eight months to conduct more analysis on the bids.[24]
On 28 January 2005, the Department of Defense announced that it had selected the US101 as the winner.[25][26] It has been speculated that the US101's three engines had been a decisive factor over the rivaling twin-engined VH-92.[27] John Young, the USN's assistant secretary for acquisition technology and logistics, stated of the selection: "The Lockheed team probably started with a helicopter that needed less. They more closely met the requirements we had laid out, and that allowed them to table less work that had to be completed to get to the finish line and deliver a product".[28] The US101 team was awarded a US$1.7 billion contract for the System Development and Demonstration phase.[19][29] In July 2005, the US101 received the military designation VH-71 Kestrel.[30]
Program problems and delays
Delays and engineering issues plagued the VH-71's development.[31] By 2007, the estimated cost of developing and modifying the aircraft had risen by 40% to $2.4 billion and had passed the $4.2 billion expected for the production of the fleet.[32] In March 2008, the program cost had risen and was projected to cost a total $11.2 billion,[33] or about $400 million per helicopter.[34]
During dialogue over the CSAR-X (in which the EH101 was LMSI's offering), the Air Force Source Selection Authority (SSA) stated the program's performance had been "unsatisfactory". In March 2007, a Government Accountability Office (GAO) report, upholding Sikorsky and Lockheed's protests against Boeing's HH-47, mentioned "LMSI had received a little confidence rating for past performance due to unsatisfactory performance under its current contract for the VH-71 Presidential helicopter, which was evaluated as the most highly relevant to this procurement." The SSA stated that LMSI had "show[n] that it could not reliably meet important schedule requirements and had difficulty in systems engineering flow-downs to their subcontractors."[35] Lockheed responded that government insistence on extensive modifications, unanticipated in the RFP, as the source of cost overruns.[32] A GAO report in 2011 concluded that the VH-71's development was not allowed flexibility or trade-offs considered by the customer.[36]
In December 2007, DoD officials met with the White House Military Office to discuss the program's future; the Pentagon had apparently wanted to terminate the VH-71 due to setbacks, budget issues, and design problems. The White House overruled a decision to cancel; the program was effectively placed on hold while options were considered.[37] In July 2008, the VH-71A (also called Increment 1) was to reach operating capability in 2010. The second phase of the development, VH-71B (Increment 2) was expected to start entering service in 2017.[38]
In October 2008, while commenting on defense programs likely to be cut following the change in government, John Young, the Undersecretary of Defense for Acquisition, Technology and Logistics, stated that the VH-71 "is very high on that list".[39] The rising cost of VH-71 program contrasted poorly with President Barack Obama's stance on curbing government spending; during a White House gathering in February 2009 President Obama commented that the procurement process had "gone amok and we are going to have to fix it." He additionally stated that "The helicopter I have now seems perfectly adequate to me."[40][41] In March 2009 the projected total cost for the planned 28 VH-71s was over $13 billion.[42] On 6 April 2009 the proposed Defense budget announced by Defense Secretary Robert Gates had not included funding for the VH-71.[43] On 1 June 2009, the U.S. Navy announced that the contract was officially canceled, and that remaining funds were to be reinvested in upgrades to the existing fleet of VH-3D and VH-60N helicopters.[44] Nine VH-71s had been completed at time of the cancellation.[45]
The aircraft's cancellation provoked commentators to speak out about its impact on future acquisition contracts with European businesses. The failure by the U.S. Department of Defense acquisition process as demonstrated by the VH-71 may scare away potential partners.[46] Around March 2009, a coalition of lawmakers encouraged the Administration to continue a variation of the VH-71 program. A letter issued by several members of Congress urged the President to support a VH-71 program.[47] On 22 July 2009, the House Appropriations Committee approved $485 million to make five VH-71As operational.[48]
Options and restructuring
The Congressional Research Service (CRS) estimated that shutting down VH-71 production, upgrading the existing fleet, and later implementing a successor program would cost $14–$21 billion. It was reported not only that a new fleet would not be available until 2024 (at which point the existing helicopters would have remained in service while being over 50 years old), but that terminating the existing program would waste more than $3 billion in sunk VH-71 costs.[49] Following the President's decision to terminate the program a variety of lawmakers, think tanks and media outlets publicly concluded it would be more cost-effective and less time-consuming to continue with a variation of the existing VH-71 program.[50]
In 2009, the CRS proposed four options: Option 1 was to continue the VH-71 program with Increment I and II versions; the additional cost was estimated at $10 billion and the entry into service date was 2019. Option 2 was to restructure the program to provide 23 Increment I aircraft; at an additional cost of $6.4 billion and would be operational by 2012. Option 3 was a restructure to provide 19 Increment I aircraft to replace the current fleet; the additional cost for this option was estimated at $5.6 billion and the entry into service by 2012. The last option was to upgrade and extend life of current fleet at a cost of $1.4 billion; however this would not meet the standards required for future presidential helicopters, and would require replacement sooner.[51]
In addition to the cost of a new procurement program, industry officials stated that to merely extend the operating life of the current fleet is a risky choice because it is both less secure and costly to maintain.[52] Lawmakers from both sides of the aisle, including Senator Chuck Schumer (D-NY) and Representative Roscoe Bartlett (R-MD) have been outspoken critics of the Pentagon in the matter—Bartlett recently claiming that "they had this conversation outside the partnership and we regret that."[52] Loren Thompson, an analyst for the Lexington Institute, stated "I do not believe that the story of VH-71 is over... Secretary Gates has not made a convincing case for terminating the program, and there is no alternative helicopter that can satisfy range and payload requirements while still landing on the White House lawn."[53]
On 19 December 2009, President Obama signed a joint House and Senate Defense Appropriation Bill for FY 2010, which includes $130 million funding for the Marine One program: $100 million to recoup technologies developed under the VH-71 Kestrel program, and $30 million for the Navy's initial studies on a new VH-XX program.[54] In February 2010, the Navy issued a request for information to the aviation industry.[55] In April 2010, Lockheed Martin announced they would team with Sikorsky in offering the Sikorsky S-92 instead of the VH-71.[56][57] In June 2010, Boeing announced it was considering a U.S.-built licensed version of the AgustaWestland AW101 for the renewed VXX program as well as the Bell-Boeing V-22 Osprey and Boeing CH-47 Chinook.[58][59]
In June 2011, the nine VH-71s were purchased for $164 million by Canada for use as spare parts for its fleet of AgustaWestland CH-149 Cormorant search and rescue helicopter, which is also based upon the AW101.[60] The transferred VH-71s were stripped of sensitive parts, and seven remained in an airworthy condition. In 2013, media reports stated Canada is studying whether up to four of the VH-71s can be certified for operational use; manufacturer AgustaWestland has openly stated their support for the regeneration initiative.[61][62][63] On 8 August 2018, it was reported that Leonardo S.p.A. was converting the seven airworthy helicopters into mission-ready CH-149s.[64]
Testing
The first test VH-71A, Test Vehicle #2 (TV-2), made its initial flight on 3 July 2007 at AgustaWestland's facility in Yeovil in the UK. Lockheed Martin also used an EH101, designated TV-1, for initial testing in the United States; these tests included landing on the lawn of the White House.[65]
The first production VH-71A, Pilot Production #1 (PP-1), made its maiden flight on 22 September 2008 from Yeovil. The US Air Force transported the helicopter in a C-17 Globemaster III to Naval Air Station Patuxent River, Maryland, for further testing.[66] The first production VH-71 joined the test program at NAS Patuxent River, beginning ground testing in early December 2008.[67]
Variants
VH-71A
The initial production VH-71 aircraft or Increment one of the presidential helicopter replacement program, designed to meet an urgent need for new helicopters.[38]
VH-71B
Increment two was to provide 23 operational helicopters with increased range, and upgraded navigation and communications systems that fulfill White House requirements to maintain continuity of government and allow the president to carry out the duties of the office.[38]
Other competitions
The US101 also competed for two further USAF contracts, the 141-aircraft Combat Search and Rescue Replacement (CSAR-X) project (originally won by the Boeing HH-47 on 10 November 2006, but now subject to a second procurement competition), and the 70-aircraft Common Vertical Lift Support Program (CVLSP).[68]
^Kreisher, Otto (1 February 2012). "The Saga of Marine One". Air & Space Forces Magazine. Archived from the original on 1 December 2022. Retrieved 13 January 2024.
العلاقات الرواندية الفانواتية رواندا فانواتو رواندا فانواتو تعديل مصدري - تعديل العلاقات الرواندية الفانواتية هي العلاقات الثنائية التي تجمع بين رواندا وفانواتو.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومرجعية للدولتين: وجه المقا…
Joseph Marie Jacquard. Joseph Marie Jacquard (1752–7 Agustus 1834) adalah seorang pembuat topi jerami[1] sebelum menjadi seorang pemintal sutera dan penemu Prancis, yang memperbaiki rancangan awal kartu berlubang dari perkakas tenun Jacques de Vaucanson tahun 1745, untuk menemukan mekanisme perkakas tenun Jacquard antara tahun 1804-1805. Mekanisme perkakas tenun Jacquard dikendalikan dengan pola lubang tercatat di seuntai kartu, dan memungkinkan pemintalan pola yang lebih rumit untuk m…
Wat Saket Ratcha Wora Maha WihanAgamaAfiliasiBuddhismeLokasiNegaraThailandShown within BangkokKoordinat13°45′14″N 100°30′29″E / 13.753864°N 100.508097°E / 13.753864; 100.508097 Gunung Emas Wat Saket Ratcha Wora Maha Wihan (Thai: วัดสระเกศราชวรมหาวิหารcode: th is deprecated , biasanya disingkat menjadi Wat Saket (RTGS: Wat Sa Ket) adalah sebuah kuil Buddhis (wat) di distrik Pom Prap Sattru Phai, Bangkok, Thailand. Kui…
Magnet high school in the United StatesCentral Visual and Performing Arts High SchoolLocation3125 S. Kingshighway St. Louis, MissouriUnited StatesCoordinates38°36′17″N 90°16′15″W / 38.6046°N 90.2709°W / 38.6046; -90.2709InformationTypeMagnet high schoolMottoThere Will Always Be a Central High[1]EstablishedFebruary 7, 1853; 171 years ago (February 7, 1853)School districtSt. Louis Public SchoolsSuperintendentKeisha ScarlettPrincipalAmy Phill…
Pour les articles homonymes, voir Lauer. Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. Cet article ne cite pas suffisamment ses sources (février 2014). Si vous disposez d'ouvrages ou d'articles de référence ou si vous connaissez des sites web de qualité traitant du thème abordé ici, merci de compléter l'article en donnant les références utiles à sa vérifiabilité et en les liant à la section « Notes et références ». En pratique : …
Masakazu Sekiguchi (関口 昌一code: ja is deprecated , Sekiguchi Masakazu, lahir 4 Juni 1953) adalah seorang politikus Partai Demokrat Liberal, anggota Dewan Penasihat di Parlemen Jepang. Referensi 政治家情報 〜関口 昌一〜. JANJAN (dalam bahasa Jepang). Diakses tanggal 2007-11-14. Parameter |script-newspaper= yang tidak diketahui akan diabaikan (bantuan) Pranala luar Situs web (dalam bahasa Jepang) Artikel bertopik biografi Jepang ini adalah sebuah rintisan. An…
Peta pembagian administratif tingkat pertama Dominika Pembagian administratif Dominika terdiri atas 10 paroki pada tingkat pertama. Tingkat pertama Saint Andrew Saint David Saint George Saint John Saint Joseph Saint Luke Saint Mark Saint Patrick Saint Paul Saint Peter lbsPembagian administratif Amerika Amerika Utara Amerika Selatan Negara berdaulat Amerika Serikat Antigua dan Barbuda Argentina Bahama Barbados Belize Bolivia Brasil Chili Dominica Republik Dominika Ekuador El Salvador Grenada Guat…
C3O redirects here. For the C3O type of meteorite, see CM chondrite. Tricarbon monoxide Names Preferred IUPAC name 3-Oxopropa-1,2-dien-1-ylidene Other names 3-Oxopropadienylidene Identifiers CAS Number 11127-17-6 [1] 3D model (JSmol) Interactive image PubChem CID 101860484 InChI InChI=1S/C3O/c1-2-3-4Key: ZCNKODXATWVMAO-UHFFFAOYSA-N SMILES [C-]#CC#[O+] Properties Chemical formula C3O Molar mass 52.032 g·mol−1 Appearance Gas Related compounds Related oxides carbon …
Institutional corruption in the country Political corruption Forms and concepts Bribery Cronyism Economics of corruption Electoral fraud Elite capture Influence peddling Kleptocracy Mafia state Nepotism Pyrrhic defeat theory Slush fund Simony State capture State-corporate crime Throffer Anti-corruption International Anti-Corruption Court Group of States Against Corruption International Anti-Corruption Academy International Anti-Corruption Day United Nations Convention against Corruption Corrupti…
Chemical reaction that releases energy as light or heat The thermite reaction is famously exothermic. The reduction of iron(III) oxide by aluminium releases sufficient heat to yield molten iron. In thermochemistry, an exothermic reaction is a reaction for which the overall standard enthalpy change ΔH⚬ is negative.[1][2] Exothermic reactions usually release heat. The term is often confused with exergonic reaction, which IUPAC defines as ... a reaction for which the overall stan…
Questa voce sull'argomento rifugi è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Un locale invernale sui Monti del Karwendel Il locale invernale (detto anche stanza invernale, in tedesco Winterraum) è una stanza tipica dei rifugi alpini presenti nelle Alpi. Descrizione Locale invernale del Rifugio Avanzà Ha la caratteristica di venire lasciata sempre aperta durante la stagione invernale, nonostante il r…
Untuk musisi shehnai India, lihat Bismillah Khan. Bismillah Khan MohammadiBismillah Khan pada Mei 2011 Menteri Pertahanan AfghanistanMasa jabatan15 September 2012 – 15 Agustus 2021PresidenHamid KarzaiPendahuluAbdul Rahim WardakPenggantiAbdul Qayyum ZakirMenteri Dalam Negeri AfghanistanMasa jabatan6 Januari 2010 – 15 September 2012PresidenHamid KarzaiPendahuluMohammad Hanif AtmarPenggantiMujtaba PatangKetua Staf Angkatan Darat Nasional AfghanistanMasa jabatan8 Maret 2002…
Jean-Pierre JeunetJeunet di Deauville, 2009Lahir3 September 1953 (umur 70)Roanne, Loire, PrancisPekerjaanSutradara, penulis latar, produser filmTahun aktif1978–presentSuami/istriLiza Sullivan Jean-Pierre Jeunet (bahasa Prancis: [ʒɑ̃ pjɛʁ ʒœnɛ]; kelahiran 3 September 1953) adalah seorang sutradara dan penulis latar Prancis[1][2][3] yang dikenal karena film Delicatessen, The City of Lost Children, Alien: Resurrection dan Amélie. Kehidupan dan karie…
Voce principale: Associazione Sportiva Roma. AS RomaStagione 1937-1938Una formazione della Roma nel 1937-1938 Sport calcio Squadra Roma Allenatore Guido Ara Presidente Igino Betti Serie A6º Coppa ItaliaOttavi di Finale Maggiori presenzeCampionato: Gadaldi, Borsetti (30)Totale: Gadaldi, Borsetti (32) Miglior marcatoreCampionato: Michelini (16)Totale: Michelini (16) StadioCampo Testaccio [1]del Partito Nazionale Fascista[2] 1936-1937 1938-1939 Si invita a seguire il modello d…
Untuk tempat lain yang bernama sama, lihat Pantai (disambiguasi). PantaiDesaNegara IndonesiaProvinsiKalimantan TengahKabupatenKapuasKecamatanKapuas BaratKode Kemendagri62.03.05.2005 Luas45 km²Jumlah penduduk1.334Kepadatan29,64 jiwa/km² Pantai adalah nama desa di wilayah Kecamatan Kapuas Barat, Kabupaten Kapuas, Provinsi Kalimantan Tengah, Indonesia. Pranala luar (Indonesia) Keputusan Menteri Dalam Negeri Nomor 050-145 Tahun 2022 tentang Pemberian dan Pemutakhiran Kode, Data Wilayah Admini…