As part of the Lincoln Center 65th Street Development Project, the Juilliard School and Tully Hall underwent a major renovation and expansion by architects Diller Scofidio + Renfro and FXFOWLE, which were completed in 2009. The building utilizes new interior materials, technologies, and updated equipment for concerts, film, theater, and dance. The expansion of the Juilliard building features a three-story all-glass lobby and sunken plaza beneath a new, cantilevered extension, “projecting a newly visible public identity to Broadway.”[2]
The Juilliard School building sits along the west side of Broadway, between 65th and 66th Streets (across the street from Avery Fisher Hall and the Lincoln Center parking garage). Prior to its expansion, it maintained a rectangular footprint of approximately 200 x 350 feet (110 m). Also, prior to the re-development project, the building's primary means of connection to the main Lincoln Center complex was a large pedestrian footbridge (named the Paul Milstein Plaza) that crossed over and covered a large portion of West 65th Street. Despite the original building's shape, its site was rhomboidal in shape, due to the diagonal progression of Broadway through the orthogonal grid of Manhattan. Rejecting Broadway's diagonal progression, the architects oriented Juilliard to the grid, using the remaining triangular section as a small plaza.[3]
Though not located on the complex's superblock between West 62nd and 65th Streets, the architects identified the original Juilliard building with Lincoln Center through the footbridge connection and use of cladding. Gordon Bunshaft originally envisioned the bridge to better integrate Juilliard with the main Lincoln Center campus and hide street traffic. Little to no consideration was given to the effects of such a wide bridge on the street below.[4]
As Juilliard's main public theater, Alice Tully Hall was not given a prominent entrance, despite the fact that it was housed in the only Lincoln Center building on a site directly facing Broadway. The entrance was instead tucked under the second-story outdoor terrace/footbridge and the monumental exterior staircase that led up to it from the plaza.[3] This feature along with the rejection of the diagonal and the setting back of the building from Broadway follow a similar logic of detachment from the city street that the main Lincoln Center campus embodied. This original entrance to Tully Hall became fully visible only once the terrace, staircase, and footbridge was removed in 2006.
History
Context and construction
Before the construction of Alice Tully Hall, most of the chamber music performances in New York City were held at The Town Hall on West 43rd Street, which had been built in 1921. The founders of Lincoln Center wished to have a chamber music hall in the complex, as there was still a need for a dedicated space. Before construction on Lincoln Center began, the architects considered placing a chamber music hall in the basement of Philharmonic Hall (since renamed David Geffen Hall, formerly Avery Fisher Hall). However, as the Juilliard School needed a concert hall that was equal in size to a chamber music hall, Lincoln Center chose to build one in the Juilliard building. Construction on the Juilliard building began in 1965 on a site one block north of the original Lincoln Center complex and part of the parcel designated for improvement through urban renewal. The cost of the chamber music hall was approximately $4.2 million, all of which was covered by donations from Alice Tully, a New York chamber music patron and former singer.[5]
Alice Tully Hall was designed as part of the Juilliard School building by Pietro Belluschi, who became involved with the Lincoln Center project in October 1956, when he participated in a two-week conference devoted to discussing the planning of the center.[6] The president of the Juilliard School consulted with Belluschi on which architect to choose for the project, and though Belluschi had submitted a list of architects to be considered, he was ultimately chosen for the role. He collaborated with Eduardo Catalano and Helge Westermann. Westermann had established an office in New York, which Belluschi and Catalano used as a local liaison for the project.[6] Over twelve years, the architectural team had developed approximately 70 sets of preliminary drawings.[3]
The project had been put on hold, pending decisions on the final site and budget, but went forward in 1963. Tired of battling budget restrictions and changing program requirements, Belluschi and Catalano had difficulty generating new plans when the project restarted.[6] Several of their previously proposed plans were turned over to Robert Burns, Frederick Taylor, and Frederick Preis, three employees at Catalano's office. Burns’ plan was based heavily off Catalano's MIT Student Center (completed in 1965). Catalano was regularly available for guidance and criticism on the project, whereas Belluschi would only stop in occasionally to review the work of Catalano's office. Belluschi played a more public role, communicating with Juilliard and with donors. He also was highly involved in designing spaces like the performance hall lobbies and foyers.[6]
Acoustician Heinrich Keilholz designed the hall's acoustics. Alice Tully played an influential role in the design of the hall. In a 1992 interview, Patrick McGinnis, former director of operations of Alice Tully Hall, described Tully as "very, very particular and meticulous about her choices of colors and what she wanted in the hall that would bear her name." Tully also insisted on there creating ample space between the rows of seats, allowing concertgoers of all heights to be comfortable.[5][7]
Opening, use and renovation
Tully Hall opened on September 11, 1969. Its opening night showcased the first concert of the Chamber Music Society of Lincoln Center. The New York Times praised the “restrained, elegant interior” of basswood, deep lavender carpeting, and raspberry seats,” and Mildred Schmertz of Architectural Record stated that Alice Tully Hall and the other auditoriums in the Juilliard School building “prove that it is possible to create elegant halls in contemporary terms without resorting to skimpy evocations of the gilt, plaster, and crystal décor of the great halls of the past.”[5] Since its opening, Tully Hall has served as a venue for numerous events, including Mostly Mozart, Great Performers, the New York Film Festivals, and Jazz at Lincoln Center. In 1975, a cathedral-sized, 4,192-pipe organ was installed.[5]
Diller Scofidio + Renfro were chosen in 2003 as the design architects to redevelop Lincoln Center's 65th Street corridor, beating out Norman Foster, Richard Meier, and Santiago Calatrava in a 2002 design competition.[8] The plan called for the adjacent block of 65th Street to be renovated with a more pedestrian-friendly environment.[9] In April 2004, Lincoln Center unveiled the designs by Diller Scofidio + Renfro and FXFOWLE for the first phase of its redevelopment project, which included the expansion of the Juilliard building and the redesign of Alice Tully Hall.[10] The plan received final approval and construction began in March 2006. The plan was praised by many architecture critics, but it also received criticism from preservationists, such as advocacy group Docomomo International, which wished to see the original Belluschi building remain intact. The New York City Landmarks Preservation Commission declined in 2005 to designate Alice Tully Hall as a city landmark. The majority of the controversy has been focused on changes being made to other parts of Lincoln Center, in phase two of the redevelopment project.[11]
By June 2006, Lincoln Center, Inc. had raised $339 million, 75% of the $459 million it was responsible for raising for the project. The total goal for the project was $650 million, and the remainder of the money was provided by the federal government and the governments of New York City and State.[12] Lincoln Center also received 20 gifts of $5 million or more, nine of which were at $10 million and above. The donors included individuals, corporations, and foundations, as well as banks Morgan Stanley, Credit Suisse, and Bank of New York Mellon.[12] Work on Alice Tully Hall commenced in April 2007.[13]
Tully Hall reopened in February 2009 with a two-week celebration.[14][15] The Juilliard expansion and renovation was projected to cost around $100 million, but it was reported to have cost as much as $360 million; no official numbers have been released.[16][8] The entire West 65th Street project was projected to cost $325 million.[10] Charles Renfro, a partner at Diller Scofidio + Renfro, stated that the sum was probably twice as high as it would have cost to tear down Belluschi's building and build anew.[8]
Architecture
Exterior
The Juilliard School's architectural design reflects the Brutalist style, characterized by its emphasis on rigid geometries and distinctive cantilevered structures. Initial architectural concepts, led by Pietro Belluschi and Eduardo Catalano, initially leaned toward a more classical white temple appearance, consistent with the other structures at Lincoln Center. However, as the project evolved and the school's leadership underwent changes, the design approach also shifted. The selected design, created by Robert Burns, emerged as a result of these changes in location and programmatic modifications. This design was influenced by the MIT Student Center's layout, ultimately guiding the construction process.[17][6]
The scheme is based on the placement of main performance spaces on either side of a central vertical circulation core.[6] At a cost of nearly $30 million in 1969, the 490,000-square-foot (46,000 m2) building contained: 10 floors (4 above ground, 4 below), 3 Juilliard theaters, the public Alice Tully Hall, 15 large dance, opera, and drama studios, 3 organ studios, 84 practice rooms, 27 classrooms and ensemble studios, 30 private instruction studios, numerous orchestra and choral rehearsal rooms, scenery and costume studios and workshops, a library, lounge, snack bar, and administration offices.[17] The theaters and working floors are tied together by a West 65th Street vestibule-lobby that rises several stories, allowing one to orient oneself upon entering the building. The arrangement and packing of a campus’ worth of spaces into a single building greatly impressed architectural critics, but was not as well received by the students of Juilliard, who were confused by the building's circulation.[6]
The Juilliard building, set on a regular structural grid, was designed in steel and concrete with a travertine veneer (for which the material was donated by the Italian government).[6] However, the public entrance to Alice Tully Hall under the second-story terrace and exterior staircase was difficult to find. The removal of the West 65th Street footbridge, in 2006, unveiled this entrance, but it did not attain full prominence until the renovation and expansion of Tully Hall and Juilliard.[3]
Interior
Most of the building's interior was extremely simple, with walls often left as bare concrete aggregate with wall-to-wall carpeting on the floors in several areas. The theaters, on the other hand, were far more finely detailed. Tully Hall was (in accordance with the desires of Alice Tully herself) designed with wood batten with dampening behind, and lavender carpet “casting 1930s-ish mauve lights in the foyer.”[17] Though the theater's lobby was large, it was depressed several feet below grade. The theater was designed mainly for recitals and chamber music performances, but because the first three rows of seats could be replaced by an expanded stage, it could also accommodate small orchestras. Tully Hall is located within 22 feet (6.7 m) of the subway tunnel under Broadway, and this required the insertion of a one-inch-thick, cork-lined asbestos pad between the theater's foundation and bedrock, as well as the isolation of the theater's walls from structural columns.[3] Tully Hall's acoustics were praised as being among the best of any performance hall in Lincoln Center, thanks to the work of acoustician Heinrich Keilholz (who consulted on the acoustics of the entire building as well).
After its renovation, Tully Hall's lobby doubled in size from 5,157 to 9,468 square feet (479.1 to 879.6 m2), with a 3,600-square-foot (330 m2) patron's salon added on the mezzanine level. A public café named at65 is visible in the lobby along Broadway, backed by blood-red walls of tongue-and-groove muirapiranga wood, which now wrap the new performance hall (renamed the Starr Theater). The lobby's floors are made of Portuguese ataija azul limestone.[2] The east and south elevations are sheathed with a mullionless one-way-cable wall system, allowing for maximum transparency.
Narrow passageways lead to the side entrances of the concert hall. The passageway walls are lined with dark gray felt and the floors are covered with gray industrial carpeting. Elisabeth Diller calls this the “sensory deprivation space”, as it is meant to heighten the drama of coming into the auditorium.[18] The theater's new skin consists almost entirely of translucent eco-friendly resin and African moabi wood panels that were developed with 3form (and are between 1 and 1.5 inches thick). The panels form gill-like acoustic baffles along the side walls or become pivoting pyramid shapes that bounce sound.[19] Sections of the balcony and side walls give emit a soft pinkish light as LEDs hidden behind them glow through the opaque moabi veneer. Aesthetics, acoustics, and lighting were all incorporated into these panels to remove visual clutter and create a more inviting space.[19] The stage can now be configured in three different ways, as the front rows are capable of sliding down and underneath it.
Renovation
As part of the Lincoln Center Redevelopment Project, the Juilliard School needed another 45,000 square feet (4,200 m2) of space and wanted Alice Tully Hall's interiors and public spaces to be more welcoming.[19] The expansion by Diller Scofidio + Renfro and FXFOWLE extended the travertine cladding of the original building along the West 65th Street facade, and also created an adapted extension of the Brutalist geometries on the upper stories. The fourth-story row of recesses housing windows is extended, but with the glass displaced and extending beyond the recesses, differentiating the extension from the original building and subtly beginning to break the original Brutalist box. The Juilliard extension cantilevers over a sunken public plaza and a new 38-foot-6-inch-high glazed lobby. The underside of the extension tilts up at a 16-degree angle.[18] A dance studio punches through the curtain wall, overlooking Broadway. The transparency of the entry makes it feel like an extension of the Broadway sidewalk. A grandstand of bleacher-style seating on the far corner of the plaza rises at a similar angle to the canopy.
Structural glazed walls bring daylight into three stories of rehearsal space and classrooms in the extension, and the protruding dance studio is suspended beneath its soffit.[18] East-west running trusses were installed between the third and sixth levels to carry the load for the four floors of the expansion, the longest of which has a 75-foot (23 m) back span with a 50-foot (15 m) cantilever.[18] Some of the trusses’ diagonals needed to be offset to accommodate doors, passageways, and other obstructions. Steel diagonal brace frames extend from the ground to the roof to support the lateral load.[18]
Acoustician Mark Holden and his team measured every surface of the old performance hall to determine which were re-radiating the noise of the subway, and found that the stage and seating floors, and proscenium stage's vertical panels were the responsible members. The new floors sit on a floating concrete slab with a rubber pad, and the spin walls are mounted on giant rubber isolators, which work to mitigate the sounds of the subway.[19]
Significance
Elizabeth Diller called Lincoln Center the “place that architects love to hate,” but said that DS+R wanted to give it a “second chance.”[19] It had long been criticized by the architectural community, due to the general dissatisfaction with the complex's overall feeling of detachment from its urban environment (the consequence of an antiquated architectural and planning ideology), the unsavory forms of the main theatre buildings, and the inadequacies of the actual performance spaces. The Juilliard Building, by comparison, received far more favorable reviews, especially with regard to its performance spaces. Despite its improvements over the superblock buildings, it was not without its problems: no clear, distinct public entrance for Tully Hall, the massive exterior stair and footbridge, lack of engagement with Broadway (either its social vitality and unique diagonal shape).
The expansion of Juilliard and the comprehensive renovation of Alice Tully Hall resolve many of the original building's issues, meeting the program requirements of the Juilliard School while actively engaging the once-reclusive Juilliard building with Broadway and Lincoln Square, making it an integral part of the area's vibrant street life. Furthermore, the expansion and renovation successfully merge the Brutalist/Modernist language of the original building with the contemporary Post-Modernist language of the addition. It is this Post-Modern language that interacts most with the streetscape, reflecting contemporary ideas regarding the creation of public space and the relationship/transition between indoor and outdoor spaces. The new Tully Hall and Juilliard building has received rave reviews, with critics who liked the original building praising the architects for “pulling off the near-impossible feat of improving a good building without subverting its finer traits.”[20]
^ abLincoln Center: June 12, 2006 Press Release. "Archived copy"(PDF). Archived from the original(PDF) on July 17, 2011. Retrieved December 20, 2010.{{cite web}}: CS1 maint: archived copy as title (link)
EuroJet Turbo GmbHJenisJoint ventureIndustriAeronautikaDidirikan1986; 38 tahun lalu (1986)KantorpusatHallbergmoos, Munich, GermanyProdukMesin pesawat terbangPemilikRolls-Royce Holdings MTU Aero Engines Avio Industria de Turbo PropulsoresSitus webwww.eurojet.de Eurojet Turbo GmbH adalah konsorsium multi-nasional, perusahaan mitra Rolls Royce dari Inggris, Avio dari Italia, ITP dari Spanyol dan MTU Aero Engines dari Jerman. Berdiri di Hallbergmoos dekat Munich. Eurojet GmbH dibentuk pada tahu…
Wilkes County, North CarolinaLokasi di negara bagian North CarolinaLokasi negara bagian North Carolina di Amerika SerikatDidirikan1778Asal namaJohn WilkesSeatWilkesborotown terbesarNorth WilkesboroWilayah • Keseluruhan757 sq mi (1.961 km2) • Daratan754 sq mi (1.953 km2) • Perairan26 sq mi (67 km2), 0.3%Populasi • (2010)69,340 • Kepadatan92/sq mi (36/km²)Distrik kongres5thZona waktuTimur…
Artikel ini perlu dikembangkan agar dapat memenuhi kriteria sebagai entri Wikipedia.Bantulah untuk mengembangkan artikel ini. Jika tidak dikembangkan, artikel ini akan dihapus. Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada April 2024. Teknologi IsaKidd adalah teknologi pemurnian dan pemurni listrik tembaga yang di…
جزء من سلسلة مقالات حولالتصنيع طرق التصنيع انتاج بالدفعة انتاج على أساس الطلب انتاج متواصل طرق التحسين تصنيع محدود الفاقد صيانة إنتاجية شاملة تصنيع بالاستجابة السريعة صيانة مسيرة بالقيمة نظرية القيود ستة سيغما صيانة موثوقية مركزية معلومات واتصالات آي أس ايه 88 آي أس ايه 95 ن…
Canadian TV series or program CrackedGenrePolice crime dramaCreated byTracey Forbes Calum de HartogStarringDavid SutcliffeTheme music composerWintersleepOpening themeWeighty GhostCountry of originCanadaOriginal languageEnglishNo. of seasons2No. of episodes21 (list of episodes)Original releaseNetworkCBC TelevisionReleaseJanuary 8 (2013-01-08) –November 25, 2013 (2013-11-25) Cracked is a Canadian police crime drama television series which aired from January 8 to November 25, 2013 …
Coordinate: 29°01′48″S 167°57′00″E / 29.03°S 167.95°E-29.03; 167.95 Isola Norfolk (dettagli) (dettagli) Motto: Inasmuch Isola Norfolk - Localizzazione Dati amministrativi Nome completo Territorio dell’Isola Norfolk Nome ufficiale Territory of Norfolk Island Dipendente da Australia Lingue ufficiali inglese Capitale Kingston Politica Status Territorio Capo di Stato Carlo III Capo di Governo Eric Hutchinson Superficie Totale 34,6 km² Popolazione Totale 1 74…
The brewery that was clipped by the B-50 Superfortress before it crashed into the Lester. Interstate 5 now runs through where the apartment building once stood.[1] The Lester Apartments was a building on the west side of Beacon Hill, Seattle, Washington, United States. It was constructed in 1910–1911, originally intended to be the world's largest brothel. After scandal (and women's suffrage[2]) forced Seattle mayor Hiram Gill from office, the building was converted to be an ord…
Ank BijleveldBijleveld pada 2018 Menteri PertahananMasa jabatan26 Oktober 2017 – 17 September 2021Perdana MenteriMark RuttePendahuluKlaas DijkhoffPenggantiFerdinand Grapperhaus (ad interim)Komisioner Raja OverijsselMasa jabatan1 Januari 2011 – 26 Oktober 2017Penguasa monarkiBeatrix (2011–2013) Willem-Alexander (2013–2017)PendahuluGeert JansenPenggantiAndries HeidemaSekretaris Negara untuk Dalam Negeri dan Hubungan KerajaanMasa jabatan22 February 2007 – 14 Oct…
Софийская синагога 42°42′01″ с. ш. 23°19′16″ в. д.HGЯO Тип сооружение и синагога Страна Болгария Местоположение София и Столична Конфессия иудаизм Архитектурный стиль неомавританский стиль Архитектор Фридрих Грюнангер Дата основания 13 ноября 1905 Сайт sofias…
Unincorporated community in Washington, United StatesGlenrose, WashingtonUnincorporated communityGlenrose, WashingtonCoordinates: 47°37′41″N 117°20′05″W / 47.62806°N 117.33472°W / 47.62806; -117.33472CountryUnited StatesStateWashingtonCountySpokaneElevation2,240 ft (680 m)Time zoneUTC-8 (Pacific (PST)) • Summer (DST)UTC-7 (PDT)ZIP code99223Area code509GNIS feature ID1510993[1] Glenrose is an unincorporated community in Spokane Cou…
School in AustraliaThe Scots CollegeThe Scots College, as viewed from Victoria Road, Bellevue HillLocationBellevue Hill, Eastern Suburbs, SydneyAustraliaCoordinates33°52′30″S 151°15′11″E / 33.875012°S 151.252961°E / -33.875012; 151.252961InformationMottoLatin: Utinam Patribus Nostris Digni Simus(O that we may be worthy of our forefathers[1])DenominationPresbyterianismEstablished1893; 131 years ago (1893)[2]ChairmanRev Glen Pat…
American football league in Austria This article is about American football. For association football, see Austrian Football Bundesliga. Austrian Football LeagueSportAmerican footballFounded1982; 42 years ago (1982)First season1982No. of teams8 in top league AFLCountryAustriaCzech RepublicMost recentchampion(s)Danube DragonsMost titlesVienna Vikings (15)QualificationPyramid TierTV partner(s)ORF SportOfficial websitehttps://football.at/afl/ AFL The Austrian Football League (AFL)…
Chemical compound DianolIdentifiers IUPAC name 4-[(1E)-3-(4-Hydroxyphenyl)-2-methylpent-1-en-1-yl]phenol Chemical and physical dataFormulaC18H20O2Molar mass268.356 g·mol−13D model (JSmol)Interactive image SMILES CCC(\C(C)=C\C1=CC=C(O)C=C1)C1=CC=C(O)C=C1 InChI InChI=1/C18H20O2/c1-3-18(15-6-10-17(20)11-7-15)13(2)12-14-4-8-16(19)9-5-14/h4-12,18-20H,3H2,1-2H3/b13-12+Key:LYDGPZXLJYBDEM-OUKQBFOZNA-N Dianol is a synthetic, nonsteroidal estrogen that was never marketed.[1] It is a dimer …
Federal statistical agency of the United States National Center for Science and Engineering StatisticsAgency overviewFormedFebruary 15, 2011; 13 years ago (2011-02-15)Preceding agencyNational Science Foundation, Division of Science Resources StatisticsHeadquartersNational Science Foundation Building, 2415 Eisenhower Ave, Alexandria, VA, USEmployees56 full-time permanent (2020)[1]Annual budgetUS$58 million (2020)[1]Agency executiveEmilda Rivers, Director[…
Musical genres from the second half of the 20th century Oldie redirects here. For the magazine, see The Oldie. For the Ukrainian writers, see H. L. Oldie. For the Odd Future song, see The OF Tape Vol. 2. This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article may need to be rewritten to comply with Wikipedia's quality standards. You can help. The talk page may contain suggestions. (May …
Radio station in Montreal This article is about CKGM, the Montreal radio station branded TSN Radio 690 since September 4, 2012. For the national radio network, see TSN Radio. CKGMMontreal, QuebecBroadcast areaGreater MontrealFrequency690 kHz (AM)BrandingTSN 690 MontrealProgrammingFormatSportsAffiliationsToronto Blue Jays Radio Network[1]Montreal Canadiens Radio NetworkMontreal Alliance Radio NetworkLaval Rocket Radio NetworkCF Montréal Radio NetworkOwnershipOwnerBell Media Radioprogramm…
1592 siege Siege of Coevorden 1592Part of the Eighty Years' War & the Anglo–Spanish WarSiege of Coevorden,1592, print by Johannes JanssoniusDate26 July – 2 September 1592LocationCoevordenPresent day the NetherlandsResult Dutch and English victory[1][2]Belligerents Dutch Republic England German Mercenaries Spanish EmpireCommanders and leaders Maurice of Orange Francis Vere Frederik van den Bergh (Coevorden) Francisco Verdugo Cristóbal de MondragónStrength 8,000 1,9…