Electricity sector in Nigeria

The electricity sector in Nigeria generates, transmits and distributes megawatts(MW) of electric power that is significantly less than what is needed to meet basic household and industrial needs. Nigeria has twenty-three (23) power-generating plants connected to the national grid with the capacity to generate 11,165.4 MW of electricity.[1][2] These plants are managed by generation companies (GenCos), independent power providers, and Niger Delta Holding Company. In 2012, the industry labored to distribute 5,000 MW, very much less than the 40,000 MW needed to sustain the basic needs of the population.[3] This deficit is also exacerbated by unannounced load shedding,[4][5] partial and total system collapse and power failure.[3] To meet demand, many households and businesses resort to purchasing generating sets to power their properties;[3] this source of energy provided 6,000 MW in 2008.[3] Nigeria has a chronic electricity shortage that has affected the country for many years.[6][7] In 2022, its power grid collapsed twice in one week.[8][9]

Historical Background

Development of electric power industry

Electricity generation in Nigeria began in Lagos in 1886 with the use of generators to provide 60 kW.[10] In 1923, tin miners installed a 2 MW plant on the Kwali River; six years later, the Nigerian Electricity Supply Company, a private firm, was established near Jos to manage a hydroelectric plant at Kura to power the mining industry. Then, another private enterprise was established in Sapele by United Africa Company to power the activities of the African Timber and Plywood Company.[11] Between 1886 and 1945, electric power generation was relatively low, with power provided primarily to Lagos and other commercial centers such as mining industries in Jos and Enugu.[11] The colonial government created an electricity department within the Public Works Department, which then installed generating sets in many cities to serve government reservation areas and commercial centers.[3] In 1950, the Legislative Council of Nigeria began moves to integrate the electricity industry when it enacted a law to establish the Electricity Corporation of Nigeria (ECN) with the duties of developing and supplying electricity.[10] ECN took over the electricity sector activities within PWD and the generating sets of Native Authorities. In 1951, the firm managed 46 MW of electricity.[11] Between 1952 and 1960, the firm established coal-powered turbines at Oji and Ijora, Lagos. It began making preliminary plans for a transmission network to link the power-generating sites with other commercial centers.[11] In 1961, ECN completed a 132 kV transmission line linking Lagos to Ibadan via Shagamu; in 1965, this line was extended to Oshogbo, Benin, and Ughelli to form the Western System.[10]

In 1962, a statutory organization, the Niger Dams Authority (NDA), was formed to build and maintain dams along River Niger and Kaduna River, NDA went on to commission a 320 MW hydropower plant at Kainji in 1969, with the power generated sold to ECN. In 1972 NDA and ECN merged to form the National Electric Power Authority (NEPA). NEPA was the major electricity firm in Nigeria until power sector reforms resulted in the creation of the Power Holding Company of Nigeria (PHCN) and later the privatization of electricity generation and distribution.[10]

Generation

Electricity in Nigeria is generated through thermal and hydropower sources. The primary source of electricity generation comes from fossil fuels, especially gas, which accounts for 86% of the capacity in Nigeria, with the remainder generated from hydropower sources.[12] Before the beginning of the Fourth Nigerian republic, power generation was mainly the federal government's responsibility through NEPA. But reforms started in 2005 with the Electric Power Sector Reform Act (EPSRA) signing opened up the industry to private investors.[12] In 2010, the Nigerian Bulk Electricity Trading Plc (NBET) was established as a credible off-taker of electric power generation companies.[13] In 2014, the sector was privatized with three groups having the responsibility of providing power. By November 2013, the privatization of all generation and 11 distribution companies was completed, with the Federal Government retaining the ownership of the transmission company.[14]

Month/Yr Available capacity(MW) Average daily generation
January 2018 7,457 3,744[15]
February 2018 7,515 4,005
March 2018 7,475 4,079
April 2018 7,250 3,999
May 2018 8,034 3,827

Generation companies (GenCos)

Nigeria has twenty-three (23) power-generating plants connected to the national grid with the capacity to generate 11,165.4 MW of electricity.[16] These plants are managed by generation companies (GenCos), independent power providers, and Niger Delta Holding Company. The primary independent power plants before the power sector reforms are Shell-owned Afam VI (642MW), Agip-built Okpai plant (480 MW), and AES (270 MW). The third sector is the Nigerian National Integrated Power Project, NIPP, a project that was initiated in 2004 to fast-track the development of new power plants in the country. The majority of the new proposed plants are gas-powered plants. In 2014, the proposed capacity of NIPP plants was 5,455 MW.

Company Type Capacity
Kainji Jebba Power Plc Hydro 1,330MW[1]
Ughelli Power Plc Gas 942MW[16]
Sapele Power Plc Gas 1,020[16]
Shiroro Power Plc Hydro 600MW[16]
Afam Power Plc gas 987.2MW[16]
Niger Delta Power Holding Company gas 5,455[16]
IPP's gas 1,392[16]
Egbin Power Plc Gas 1,020MW[16]

Power supply deficit

Current electricity generated in Nigeria needs to be improved to meet the demand needs of households and businesses; as a result, Nigeria has a low per capita consumption of electricity, 109 kWh in 2006.[17] Besides this deficit, between 1970 and 2009, available power plants operated below optimal levels, and electricity generated was lost in transmission. While electricity capacity was 5600 MW in 2001, the power generated fell as low as 1750 MW. The hydropower plants in Kainji, Shiroro, and Jebba tend to have higher capacity utilization rates, while the gas-powered plant was affected by infrastructural and maintenance issues.[17] Between 1980 and 1996, the country witnessed a significant gap in electricity generated and electricity billed, which indicates electricity loss in transmission and theft from unauthorized connections. Since the coming of democracy in 1999, the loss ratio has reduced from 46.9% in 1996 to 9.4% in 2008. Vandalism of equipment, lack of proper maintenance of transformers, poor management, and corruption are a few of the reasons Nigeria has produced suboptimal electricity.[17]

Distribution

In Nigeria, electrical power generated by the GenCos is used to power the grid through the Transmission Company of Nigeria (TCN). Electricity is distributed through the transmission of electric power from TCN to the distribution companies (DisCos) primary substations, then to the secondary distribution system, and finally to the end consumers.[18] Alternating Current (AC) is used for the transmission of electric power; this is because AC can be easily changed from one voltage to another with a slight loss of energy with the use of a transformer.[19] The electric power is transmitted at high voltage (33kV) to the DisCos' primary substations in the six geopolitical zones based on the load allocation formula. The high voltage received is then stepped down to medium voltage (11kV) with the use of transformers. This medium voltage power is now transmitted to secondary distribution transformers near the consumer's residence. The secondary distribution transformers further step down the medium voltage to customers' consumption capacity (low voltage, usually 220 to 240V). However, some customers, for example, industries and commercial customers like Flour mills, Refineries, steel rolling mills, cement factories, rice mills, etc., may receive their power directly from the primary distribution line depending on their power utilization.[20]

Distribution companies (DisCos)

Nigeria has eleven distribution companies.[21]

Distribution company Districts
Kaduna Electricity Distribution Company Plc Kaduna including the districts of Makera, Doka, Birnin Kebbi, Gusau, Sokoto, and Zaria
Yola Electricity Distribution Company Plc Yola, Maiduguri, Taraba, and Damaturu districts
Enugu Electricity Distribution Company Plc Aba, Abakaliki, Abakpa, Awka, Ogui, Onitsha, Owerri, Nnewi, and Umuahia
Abuja Electricity Distribution Company Plc Abuja, Minna, Suleja, Lokoja, and Lafia Districts
Ibadan Electricity Distribution Company Plc Abeokuta, Dugbe, Molete, Ijebu-Ode, Osogbo, Ilorin, Sango-Ota, and Oyo
Jos Electricity Distribution Company Plc Jos, Makurdi, Bauchi, and Gombe districts
Eko Electricity Distribution Company Plc Festac, Ijora, Lagos Island, Ajah, and Badagry
Ikeja Electricity Distribution Company Plc Ikeja, Shomolu, Akowonjo, Ikorodu, Oshodi and Abule-Egba
Port Harcourt Electricity Distribution Company Plc Calabar, Diobu, Ikom/Ogoja, Borikiri, Uyo and Yenegoa
Benin Electricity Distribution Company Plc Ado-Ekiti, Afenonesan, Akure, Asaba, Akpakpava, 'Ugbowo and Warri
Kano Electricity Distribution Company Plc Nassarawa, Dala, Katsina, Dutse, Kumbotso, Funtua, and Dakata districts

DisCos are saddled with the following responsibilities; receiving energy from GenCos via TCN Plc, distributing energy to the end consumers, metering, billing of energy, revenue collection, revenue remittance to Nigeria Bulk Electricity Trading (NBET) Plc for energy received, remittance of revenue to TCN Plc for services provided, receiving complaints from customers, compliance to NERC's Service Level Agreements (SLAs), customers enlightenment ('Electricity Update') through local radio stations in the thirty-six (36) states and the Federal Capital Territory (FCT) Abuja and load demand forecast.[22]

References

  1. ^ a b "Generation". www.nerc.gov.ng. Retrieved 2019-01-08.
  2. ^ "Implementation of sub-scrotal MRV System in Grid Connected Electricity Sub-Sector in Nigeria". MRV Africa - Greenhouse Gas Monitoring Reporting and Verification. Retrieved 2022-03-30.
  3. ^ a b c d e Adedeji, Adesina Akanji (2016-03-11). Spatial exploration and analysis of electricity poverty: a case study of Ibadan, Southwestern, Nigeria (Thesis thesis). Department of Geography.
  4. ^ Oguguo, I (8 April 2020). "'When They Bring Light' Policy". thecable.ng. The Cable. Retrieved 1 May 2020.
  5. ^ Oguguo, I. "Nigeria's Electricity Providers And COVID Uncertainties". Issuu.com. THISDAY. Retrieved 1 May 2020.
  6. ^ AfricaNews (2022-03-23). "Oil rich, electricity poor. What will it take to solve Nigeria's energy crisis?". Africanews. Retrieved 2023-02-02.
  7. ^ "Renewable Energy as Viable Solution to Nigeria's Electricity Crisis – THISDAYLIVE". www.thisdaylive.com. Retrieved 2023-02-02.
  8. ^ Online, Tribune (2022-03-19). "Nigeria has to have world's worst electricity crisis". Tribune Online. Retrieved 2023-02-02.
  9. ^ "Nigeria's electricity grid collapses second time in less than 48 hours". The Guardian Nigeria News - Nigeria and World News. 2022-03-15. Retrieved 2023-02-02.
  10. ^ a b c d "The Genesis of Power Generation in Nigeria". The Nigerian Economist. 1: 40. October 1987.
  11. ^ a b c d Simpson, E. S. (July 1969). "Electricity Production in Nigeria". Economic Geography. 45 (3): 239–257. doi:10.2307/143093. ISSN 0013-0095. JSTOR 143093.
  12. ^ a b Oyewo, Ayobami; Aghahosseini, Arman; Bogdanov, Dmitirii; Breyer, Christian (2018-12-15). "Pathways to a fully sustainable electricity supply for Nigeria in the mid-term future". Energy Conversion and Management. 178: 44–64. doi:10.1016/j.enconman.2018.10.036. ISSN 0196-8904. S2CID 106320954.
  13. ^ "History". nerc.gov.ng. Retrieved 2022-04-09.
  14. ^ "Electricity: Investments in sector surpasses N2trn post-privatisation". Vanguard News. 2022-03-01. Retrieved 2022-04-09.
  15. ^ "NERC Quarterly Reports". www.nerc.gov.ng. 2018. Retrieved 2019-01-09.
  16. ^ a b c d e f g h "A Guide to the Nigerian Power Sector" (PDF). KPMG. September 2016.
  17. ^ a b c Oseni (2011-12-01). "An analysis of the power sector performance in Nigeria". Renewable and Sustainable Energy Reviews. 15 (9): 4765–4774. doi:10.1016/j.rser.2011.07.075. ISSN 1364-0321.
  18. ^ "Nigerian Electricity Supply Industry".
  19. ^ Awe, Olumuyiwa; Okunola, O O (1992). Comprehensive Certificate Physics. Ibadan: University Press Plc. p. 406. ISBN 9782492892.
  20. ^ "NESI". NERC. Retrieved 2022-05-03.
  21. ^ "Inside Nigeria's electricity companies and their perpetual loss-making | Premium Times Nigeria". 2021-08-23. Retrieved 2022-03-28.
  22. ^ "NERC Quarterly Reports 2021 Q2". www.nerc.gov.ng. 2021. Retrieved 2022-03-12.

Read other articles:

Untuk permainan video, lihat Pyre (permainan video). Untuk lagu band Inggris The Jam, lihat Funeral Pyre. Pyres beralih ke halaman ini. Untuk gitaris Inggris, lihat Gian Pyres. Sebuah upacara kremasi Ubud pada 2005 Pyre (bahasa Yunani Kuno: πυρά; pyrá, dari πῦρ, pyr, api),[1][2] juga dikenal sebagai pyre pemakaman, adalah sebuah struktur, biasanya terbuat dari kayu, untuk membakkar jasad sebagai bagian dari upacara pemakaman atau eksekusi. Sebagai sebuah bentuk dari …

أوسيوغو   الإحداثيات 43°25′00″N 76°33′04″W / 43.4167°N 76.5511°W / 43.4167; -76.5511   [1] تقسيم إداري  البلد الولايات المتحدة  التقسيم الأعلى مقاطعة أوسويغو  خصائص جغرافية  المساحة 29.3 ميل مربع  ارتفاع 104 متر  عدد السكان  عدد السكان 7914 (1 أبريل 2020)[2]  الك…

هذه المقالة تحتاج للمزيد من الوصلات للمقالات الأخرى للمساعدة في ترابط مقالات الموسوعة. فضلًا ساعد في تحسين هذه المقالة بإضافة وصلات إلى المقالات المتعلقة بها الموجودة في النص الحالي. (أغسطس 2022) كأس يوغوسلافيامعلومات عامةالبداية 1947 الرياضة كرة القدم البلد يوغوسلافيا تكرار …

Koordinat: 7°44′46″S 112°13′05″E / 7.746224°S 112.2181374°E / -7.746224; 112.2181374 Hasil rekonstruksi bagian dasar Candi Surawana Candi Surawana (Surowono) adalah candi bercorak hinduistik yang terletak di Desa Canggu, Kecamatan Badas, Kabupaten Kediri, berjarak sekitar 25 km arah timur laut dari Kota Kediri. Candi ini disebut dalam kitab Negarakertagama dengan nama 'Wishnubhawanapura dan diperkirakan dibangun pada abad ke-14 untuk memuliakan Bhre Wengker, p…

1937 film by Alfred L. Werker Big Town GirlTheatrical release posterDirected byAlfred L. WerkerScreenplay byLou BreslowRobert EllisHelen LoganJohn PatrickStory byFrances Whiting ReidDarrell WareProduced byMilton FeldStarringClaire TrevorDonald WoodsAlan DinehartAlan BaxterMurray AlperSpencer ChartersCinematographyLucien N. AndriotEdited byHanson T. FritchProductioncompany20th Century FoxDistributed by20th Century FoxRelease date December 3, 1937 (1937-12-03) Running time66 minutes…

Liga Leumit 1959-1960 Competizione Liga Leumit Sport Calcio Edizione 20ª Organizzatore IFA Date dal 19 settembre 1959all'11 giugno 1960 Luogo  Israele Partecipanti 12 Risultati Vincitore Hapoel Petah Tiqwa(3º titolo) Retrocessioni Hapoel Ramat Gan Statistiche Miglior marcatore Rafi Levi (19) Incontri disputati 132 Gol segnati 416 (3,15 per incontro) Cronologia della competizione 1958-1959 1960-1961 Manuale La Liga Leumit 1959-1960 è stata la 20ª edizione della massima seri…

Cet article est une ébauche concernant la Chine. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Taishi CiBiographieNaissance 166LongkouDécès 206Activité Chef militaireMère Mother of Taishi Ci (d)Enfant Taishi Xiang (en)modifier - modifier le code - modifier Wikidata Taishi Ci Ziyi (166/169 - 206/209) est un guerrier chinois du IIIe siècle au service du royaume de Wu. Biographie À cause de son profond se…

Questa voce sull'argomento stagioni delle società calcistiche italiane è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Voce principale: Società Sportiva Cavese 1919. CaveseStagione 2008-2009Sport calcio Squadra Cavese Allenatore Andrea Camplone Presidente Antonio Fariello Lega Pro Prima Divisione6º posto nel girone B Coppa Italiasecondo turno Coppa Italia Lega Prosecondo turno 2007-2008 2009-2010 S…

Częstochowa city with powiat rights (en)kotakota besar Częstochowa (pl) flag of Częstochowa (en) Moto«Częstochowa to dobre miasto» Tempat Negara berdaulatPolandiaProvinsi di PolandiaProvinsi Silesia Ibu kota dariCzęstochowa Voivodeship (en) (1975–1998)Częstochowa County (en) NegaraPolandia PendudukTotal213.107  (2021 )Bahasa resmiPolandia GeografiLuas wilayah159,71 km² [convert: unit tak dikenal]Ketinggian317 m Berbatasan denganGmina Kłobuck (en) Gmina Mykanów (en) Gmi…

سفارة إسبانيا في بولندا إسبانيا بولندا الإحداثيات 52°13′06″N 21°02′17″E / 52.218413888889°N 21.038002777778°E / 52.218413888889; 21.038002777778 البلد بولندا  المكان وارسو  الاختصاص بولندا  الموقع الالكتروني الموقع الرسمي تعديل مصدري - تعديل   سفارة إسبانيا في بولندا هي أرفع تمثيل دبلو…

Malaysian food company Ramly Food Processing Sdn. Bhd.Company typePrivate Limited CompanyIndustryFrozen and fast foodFounded1979; 45 years ago (1979) in Kuala Lumpur, MalaysiaFoundersRamly Bin Mokni (Managing Director)Shala Siah binti Abdul Manap (Executive Director)HeadquartersSME Industrial Park, Mukim Batu, Kuala Lumpur, MalaysiaKey peopleRamly bin MokniShala Siah binti Abdul ManapSiti Hayu binti RamlyMohd Zaharin bin RamlySiti Hazura binti RamlySiti Hazira binti RamlyProduc…

Wally WestWally West sulla copertina di Flash n. 39 (RW Lion) UniversoUniverso DC AutoreJohn Broome DisegniCarmine Infantino EditoreDC Comics 1ª app.dicembre 1959 - gennaio 1960 1ª app. in Kid Flash: Flash (I serie) n.110 Flash III: Crisis on Infinite Earths n. 12 Caratteristiche immaginarieNome completoWallace Rudolph West Alter ego Kid Flash Flash III SpecieUmana EtniaCaucasica Luogo di nascitaKeystone City Poteri Velocità che supera nove volte quella della luce Velocità warp Guari…

I. liga 1959-1960 Competizione I. liga Sport Calcio Edizione 53ª Organizzatore ČMFS Luogo  Cecoslovacchia Partecipanti 14 Risultati Vincitore  Spartak Hradec Králové(1º titolo) Retrocessioni  Jednota Košice Pardubice Statistiche Miglior marcatore Michal Pucher (18) Incontri disputati 182 Gol segnati 513 (2,82 per incontro) Cronologia della competizione 1958-1959 1960-1961 Manuale L'edizione 1959/60 del campionato cecoslovacco di calcio vide la vittoria finale …

Canadian politician Michael KramMPKram in 2019Member of Parliamentfor Regina—WascanaIncumbentAssumed office October 21, 2019Preceded byRalph Goodale Personal detailsBorn (1978-12-20) December 20, 1978 (age 45)Regina, Saskatchewan, CanadaPolitical partyConservativeResidenceRegina, Saskatchewan[1]Education University of Regina (BA, BS) Michael Kram MP (born December 20, 1978) is a Canadian politician who was elected as a Conservative to represent the riding of Regina—Wascana i…

У этого термина существуют и другие значения, см. Родригес. Внешние острова МаврикияОстров Родригесангл. Rodrigues Islandфр. Île Rodriguesкреол. Zil Rodrigues Флаг Гимн Маврикия 19°43′ ю. ш. 63°25′ в. д.HGЯO Страна Маврикий Адм. центр Порт-Матурин Президент Анируд Джагнот Глава адми…

ندى بسيوني ندى بسيوني على قناة الأهلي، 25 أبريل 2022 معلومات شخصية اسم الولادة ندى محمد مصطفى بسيوني  الميلاد 2 نوفمبر 1963 (61 سنة)  الإسكندرية  مواطنة مصر  الزوج سناء شافعشريف يحيى  الأولاد مايا سناء شافع الحياة العملية المدرسة الأم المعهد العالي للفنون المسرحية  ا…

Natanz and QamsarElectoral district constituencyfor the IsfahanNatanz, and Qamsar shown within Isfahan ProvinceRegionCentral District (Natanz County), Emamzadeh District, and Qamsar DistrictCurrent constituencyAssembly MembersMorteza Saffari Natanzi Natanz and Qamsar (electoral district) is an electoral district in the Isfahan Province of Iran. This electoral district elects 1 member of parliament. References Representatives 9 terms of Islamic Consultative Assembly. Fars News Agency. Retrieved 2…

The HonorableBernardo LeightonLeighton in the early 1970s.Chilean Minister of the InteriorIn officeNovember 3, 1964 – February 5, 1968PresidentEduardo Frei MontalvaPreceded bySótero del RíoSucceeded byEdmundo Pérez ZujovicChilean Minister of EducationIn officeFebruary 27, 1950 – February 4, 1952PresidentGabriel González VidelaPreceded byManuel Rodríguez ValenzuelaSucceeded byEliodoro DomínguezChilean Minister of LaborIn officeMay 24, 1937 – March 12, 1938Pr…

Ramses VIIIBassorilievo raffigurante il principe Sethiherkhepshef II (forse il futuro Ramses VIII) a Medinet Habu.Re dell'Alto e Basso EgittoIn caricaNuovo Regno Incoronazione1128 a.C. PredecessoreRamses VII SuccessoreRamses IX Nome completoUsermaatra-Akhenamon Ramses-Meriamon-Seth(i)herkhepshef Morte1128 a.C. DinastiaXX dinastia egizia PadreRamses III? Ramses VIII (... – 1128 a.C.) è stato un faraone della XX dinastia egizia. Indice 1 Biografia 2 Titolatura 3 Note 4 Bibliografia 5 Altr…

周處除三害The Pig, The Snake and The Pigeon正式版海報基本资料导演黃精甫监制李烈黃江豐動作指導洪昰顥编剧黃精甫主演阮經天袁富華陳以文王淨李李仁謝瓊煖配乐盧律銘林孝親林思妤保卜摄影王金城剪辑黃精甫林雍益制片商一種態度電影股份有限公司片长134分鐘产地 臺灣语言國語粵語台語上映及发行上映日期 2023年10月6日 (2023-10-06)(台灣) 2023年11月2日 (2023-11-02)(香港、…

Kembali kehalaman sebelumnya