Muscat International Airport (IATA: MCT, ICAO: OOMS), formerly Seeb International Airport,[1] is the main international airport in Oman and is located in Seeb, 32 km from the old city and capital Muscat within the Muscat metropolitan area. The airport serves as the hub for flag carrierOman Air and Oman's first budget airline, Salam Air, and features flights to several regional destinations as well as some intercontinental services to Asia, Africa and Europe.
History
Muscat's original airport, Bayt al Falaj, began operations in 1929. It served as the capital's first airport and was known for sharp turns and steep descents. Airlines such as Gulf Aviation (later Gulf Air) and Oman International Services were its first users.
With the need for larger space to expand operations, the current airport was built on its present site, and opened as Seeb International Airport on January 1, 1973.[2]
On 1 February 2008, the airport was given its present name.[1]
Facilities
The airport is spread over an area of 2,200 hectares (5,500 acres). It originally featured one passenger terminal building and one runway, as well as minor cargo and maintenance facilities. Part of the airport complex extension featured housing for airport employees and Oman Air employees.
During the expansion, a new terminal and control tower was built along with a new runway. The current terminal is the biggest airport in Oman. Construction was started in 2007, and the airport opened in 2018. The new facilities also include a VIP terminal for private jets and an onsite airport hotel.
The airport is also a joint-use military and public facility, acting as the base of operations for both the Royal Flight of Oman and Royal Air Force of Oman. A Royal Terminal and Royal Flight hangars are located adjacent to the old terminal.
In 2019, the Aaronia AARTOS C-UAS drone detection system was installed,[5] which makes this the first international airport in the world to have an operational drone detection system.
Terminals
Terminal 1 (new terminal)
The airport's newer and significantly larger terminal located north of the existing terminal and first runway opened in 2018. This new building initially brought the airport's capacity up to 20 million passengers a year upon completion of the first phase.[6] Subsequent enlargements under second and third phases will increase the airport capacity to 24 and 48 million annual passengers respectively.[6] The terminal covers 580,000 sqm and features 118 check-in counters, 10 baggage reclaim belts, 82 immigration counters, 45 gates and a new, 97-meter control tower. The new terminal is located between the old and new runways and is capable of handling large aircraft such as Airbus A380s and Boeing 747s.[7] The terminal opened on 18 March 2018, with the first flight, an Oman Air flight from Najaf, arriving at 6:30 p.m.[8]
Terminal 2 (old terminal)
Terminal 2 is a single-building, two-story, T-shaped passenger terminal. Built in 1970, it opened in 1973 as a replacement of the Bait al-Falaj airport and has been expanded several times during the last years to cater for growing passenger numbers.[9] This terminal featured 58 check-in counters, 23 departure gates, four baggage reclaim belts and several service counters and shops.[9] A new pier was constructed in 2007, with additional shops, restaurants, and outlets, opening in 2009. During its years of operation, passengers and crew were transported to and from the aircraft using shuttle buses as the terminal offered no jet bridges.
The last international flight to depart from the old terminal was an Oman Air flight to Zurich, Switzerland, while another Oman Air flight bound for Salalah became the last domestic flight.[8] The old facility was planned to be redeveloped into a low-cost carrier terminal,[10] but was instead turned into a field hospital and COVID-19 vaccination site ever since the outbreak of the COVID-19 virus.
Runways and apron
The airport features two runways: the original Runway 08R/26L and the second Runway 08L/26R, situated north of the new terminal building and inaugurated on 14 December 2014. Both runways are equipped to accommodate large aircraft, including the Boeing 747-8, Airbus A380, and the Antonov An-225. The original runway, situated between the new and the former passenger terminal, underwent closure in 2015 for refurbishment and expansion,[11] aligning with the construction of a completely new main terminal building and apron area. The refurbishment of the original runway was finalized in October 2023, and it officially resumed operations in November 2023.[12]
The old terminal's apron features 32 stands[9] on both sides of the T-shaped passenger terminal building with 30 new ones constructed in two phases[7] in front of the new terminal building, of which several were already in use as of September 2016.
Airlines and destinations
Passenger
The following airlines operate regular scheduled and charter flights to and from Muscat:[13]
Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found on Phabricator and on MediaWiki.org.
Annual passenger traffic at MCT airport.
See Wikidata query.
Oman National Transport Company (Mwasalat) operates 24-hour service special airport buses at fixed intervals. The Route A1 operates between Mabela and Ruwi bus station with a stop at Muscat Airport. Bus Route 8 (Al Mouj-Al Khuwair) also has a stop at Muscat Airport. Metered-airport taxis are available with special counters at the baggage and arrival halls. Car hire and chauffeur services are also available. [70]