Lines 1, 2 and 3 have, in total, 52 stations, 59.1 km length and will cost 42.19 billion yuan to construct. Phase 1 of Line 1, has 20 stations and is 23.9 km[8] in length. Phase 2 of Line 1 has 8 stations and is 13.495 km in length.[9] Only 6 stations in Phase 2, from Xiaohedadao to Fuze (10.4 km[10]) are operational. Line 3, has 22 stations and is 26.7 km in length. Line 2, has 15 stations and is 15.5 km in length.[11] It was opened on 26 August 2020.[11]
Line 1 runs from west to east and then to the north of city. Line 3 runs from north-west to south-east and then eastwards. Each line intersects other two. Lines 1 and 3 intersects at Xinbaiguangchang. The stations of these two lines were named in January 2013.[7][12][13] Line 2 runs from north to south.[14]
Future development
There will be 63.6 km of new lines in the Phase 2 construction plan of Shijiazhuang Metro, including Line 1 (Phase 3), Line 4, Line 5 (Phase 1), Line 6 (Phase 1).[15]
^石家庄新客站:西站房将于明年底投入使用 [The New Shijiazhuang Passenger Station: The Western Section Will Be Opened by the End of the Next Year]. 河北新闻网 (in Chinese). 30 August 2010. Archived from the original on 31 October 2018.