The station and most trains calling are operated by Great Northern, with limited peak services being operated by Greater Anglia.
Waterbeach station is unstaffed, and has only basic waiting shelters on each of the two platforms. All the station buildings have been demolished. The platforms are staggered on each side of a half barrier level crossing. Until electrification and the automation of the crossing, the platforms were located opposite each other.
History
Before electrification, British Rail services often did not stop at Waterbeach; or if they did, stops would be unofficial. However, since electrification, virtually all King's Lynn/Ely - Cambridge/London services have stopped there (the present timetable shows only three Monday - Friday in both directions not stopping there) passenger numbers surged, with people all across the area north of Cambridge in South Cambridgeshire using it as their primary station. As a result, passenger numbers are nearly as high as Downham Market, and the station sees a lot of parking problems.[2]
Future plans
Plans to develop a New Town of 8,000 to 9,000 homes on the former Waterbeach Barracks site have been outlined by South Cambridgeshire District Council. As part of the proposal, there are plans to close the existing station and build a new station closer to the New Town.[3]
During the peak hours, the services to London King's Cross call additionally at Royston and Letchworth Garden City and all northbound services are extended to King's Lynn.
The station is also served by a number of peak-hour services operated by Greater Anglia. The station is served by two daily services from and one to Norwich as well as two daily services to and one from London Liverpool Street.