Share to: share facebook share twitter share wa share telegram print page

Wind power in Arizona

Wind power in Arizona is located in Arizona
Kingman
Kingman
Perrin Ranch
Perrin Ranch
Red Horse
Red Horse
White Hills
White Hills
Wind power projects in Arizona
  Operating
  Under construction

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.[1]

History

Utility-scale wind power in Arizona began in 2009 with the commissioning of the first phase of the Dry Lake Wind Power Project[2][3] in Navajo County.

Installed capacity and wind resources

The following table compares the growth in wind power installed nameplate capacity in megawatts (MW) for Arizona and the entire United States since 2008.[3][4][5]

Year Arizona US
2008 0 25,410
2009 63 34,863
2010 128 40,267
2011 139 46,916
2012 238 60,005
2013 238 61,107
2014 238 65,880
2015 268 74,471
2016 268 82,171
2017 268 89,078
2018 268 96,487
2019 268 105,583
2020 618 122,478
2021 618 132,753
2022 618 141,402
2023 855 147,640
Installed capacity by state as of 2018 (animated map of installed capacity growth)
Average annual wind power density map for Arizona at 50m above ground

Arizona has the potential to install up to 10.9 GW of onshore wind power nameplate capacity at 80 meter, 74.4 GW at 110 meter, or 191.0 GW at 140 meter hub height, generating 585 TWh annually.[6][7][8] For comparison, Arizona consumed 69.391 TWh of electricity in 2005;[9][10] the entire U.S. wind power industry was producing at an annual rate of approximately 50 TWh at the end of 2008; Arizona's Palo Verde Nuclear Generating Station produced 26.782 TWh in 2007; and Three Gorges Dam (the world's largest electricity-generating station) produced an average of 80 TWh/yr in 2008 and 2009.

Wind farms

Operating

  • Dry Lake Wind Power Project in Navajo County is Arizona's first utility-scale wind farm. Phase 1 consists of 30 Suzlon 2.1 MW wind turbines, for a total nameplate capacity of 63 MW.[2][3] Iberdrola Renewables built the wind farm in 2009 for $100 million,[2] and sells the output to Salt River Project.
  • Chevelon Butte phase 1. On June 1, 2023 AES announced that phase one of the Chevelon Butte project began operations. This portion brings 238 megawatts to the Arizona power grid. The second phase, which is 216 megawatts will begin construction soon with plans to be operational in 2024[11]
  • Kingman Wind Farm, built in 2011, has 10 MW of wind turbines.[12]
  • Perrin Ranch Wind Farm in Coconino County began operation in 2012 with 62 wind turbines, generating 99.2 MW of electricity.[13]
  • Fort Huachuca has an 850 KW two blade wind turbine installed in 2011.[14]
  • Red Horse 2 Wind and Solar Project has 30 MW of wind turbines installed in 2015.[15]

Planned

  • As of 2012, BP Wind Energy of North America proposed building the Mohave County Wind Farm project comprising up to 258 wind turbines on federally managed lands in Mohave County. The site – about 49,000 acres of public land – is in the White Hills area about 40 miles northwest of Kingman and 20 miles southeast of Hoover Dam. The project should have up to 500 MW of capacity and construction may be in phases. Transmission lines are planned to connect to existing Western Area Power Administration lines.[16] The project was sold to NextEra Energy and renamed the White Hills Wind Project. Larger turbines will be used, reducing the number needed. An interconnection to WAPA's Mead-Peacock 345-kV transmission line was approved by WAPA in May 2019.[17] Construction of the 127 turbine farm began in 2020, with initial power output expected by the end of the year. Southern California Clean Power Alliance has signed a 20-year power purchase agreement for 300 MW from the wind farm.[18]
  • Utility-scale wind power at Babbitt Ranch Energy Center. Construction began on March 22, 2023 of a 161 Megawatt wind energy project in Coconino county. The project was proposed by NextEra Resources and SRP plans to start delivering power in 2024[19]
  • Chevelon Butte. AES is planning and in construction on a 454 megawatt wind project in Coconino and Navajo counties 20 miles south of Winslow, Arizona. The project is to be completed in two phases, the first 238 megawatt phase is expected to be fully operational before summer 2023.[20] With the second 216 megawatt phase to be operational sometime in 2024. The second phase turbines are being provided by Vestas, a Danish manufacturer. [21]
  • West Camp Wind Farm. AES has received approval from the Navajo County board of Supervisors for a 500 megawatt, 104 turbine, wind farm 10 miles south of Joesph City, Arizona. On December 23, 2023 Vestas announced an agreement to build and commission 89 wind turbines. Deliveries are scheduled to begin in the fourth quarter 2024 with operations expected to start in 2025. [22] [23]

Small-scale wind power

The ASU School of Sustainability

Flagstaff is the home of Southwest Windpower.

The ASU School of Sustainability in Tempe, Arizona features an array of small wind turbines on its roof, with real-time data available to the public through the ASU Campus Metabolism[24] web site.

Environmental impact

According to the USDOE, each 1000 MW of wind power capacity installed in Arizona will annually save 818 million gallons of water and eliminate 2.0 million tons of carbon dioxide emissions.[25]

For comparison, Arizona emitted a total of 101,510,000 tonnes of carbon dioxide in 2007.[26]

Wind generation

Arizona Wind Generation (GWh, Million kWh)
Year Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2009 30 12 8 10
2010 136 6 7 15 14 18 12 7 6 6 9 13 23
2011 255 9 27 31 38 34 33 13 11 9 14 26 10
2012 532 47 47 61 51 59 52 34 30 30 41 32 48
2013 450 31 35 45 55 60 49 24 18 30 41 27 35
2014 467 28 36 43 58 63 62 26 25 23 21 53 29
2015 451 16 35 31 53 44 34 32 29 31 35 56 55
2016 542 42 38 56 50 55 46 46 21 44 51 44 49
2017 570 53 52 54 54 52 39 32 35 36 55 52 56
2018 528 47 43 55 55 41 45 36 38 38 40 44 46
2019 555 48 47 47 50 46 42 43 39 49 48 48 48
2020 643 43 42 59 52 54 60 34 35 31 31 84 118
2021 1,600 126 132 166 157 153 137 111 131 99 123 108 157
2022 1,565 106 150 156 185 186 156 119 63 101 76 153 114
2023 1,733 159 145 180 121 155 152 180 120 147 147 149 77
2024 . . . . . . . .
Source:[27]

See also

References

  1. ^ "Arizona Wind Energy" (PDF). U.S. Wind Energy State Facts. American Wind Energy Association. Retrieved 27 December 2017.
  2. ^ a b c Randazzo, Ryan (2009-05-12). "Harvesting Arizona wind". Arizona Republic. Retrieved 2010-05-04.
  3. ^ a b c "U.S. Wind Energy Projects – Arizona". American Wind Energy Association. 2009-12-31. Retrieved 2010-05-04.
  4. ^ Wind Energy in Arizona
  5. ^ WINDExchange: Installed and Potential Wind Power Capacity and Generation
  6. ^ "Estimates of Windy Land Area and Wind Energy Potential by State for Areas >= 30% Capacity Factor at 80m" (XLS). National Renewable Energy Laboratory. 2010-02-04. Retrieved 2010-05-06.
  7. ^ "Arizona Wind Activities". National Renewable Energy Laboratory. 2010-02-19. Retrieved 2010-05-06.
  8. ^ "Arizona Wind Resource Map and Potential Wind Capacity". Department of Energy's Wind Program. 2015-09-24. Retrieved 2016-03-06.
  9. ^ "Electric Power and Renewable Energy in Arizona". USDOE, EERE. 2008-06-25. Retrieved 2010-05-06.
  10. ^ "Arizona Quick Facts". USDOE, EIA. 2010-05-06. Retrieved 2010-05-06.
  11. ^ "AES Commences Operation of First Phase of Chevelon Butte Wind Farm" (Press release).
  12. ^ 5 Wind Turbines Are Up South Of Kingman
  13. ^ Perrin Ranch Wind Energy Center
  14. ^ Military Budget Blowing Away?
  15. ^ Big wind farm starts producing electricity for Tucson
  16. ^ Bureau of Land Management (2011-09-27). "Mohave County Wind Farm Project".
  17. ^ Mohave County Wind Farm Project Record of Decision, Federal Register, 84 FR 20622, May 10, 2019
  18. ^ Hawins, DAvid (Mar 5, 2020). "Wind farm under construction in White Hills". Mohave Valley Daily News.
  19. ^ "Construction begins on Babbitt Ranch Energy Center near Flagstaff". 22 March 2023.
  20. ^ "Chevelon Butte Wind Farm | AES".
  21. ^ "Vestas to supply turbines for 216MW Chevelon Butte wind farm phase 2".
  22. ^ "West Camp Wind Farm | AES".
  23. ^ "Vestas secures a 401 MW order for a wind farm in Arizona, USA | REVE News of the wind sector in Spain and in the world". 22 December 2023.
  24. ^ Campus Metabolism
  25. ^ Lantz, Eric; Tegen, Suzanne (October 2008). "Economic Benefits, Carbon Dioxide (CO2) Emissions Reductions, and Water Conservation Benefits from 1,000 Megawatts (MW) of New Wind Power in Arizona" (PDF, 514kB). EERE, NREL. Retrieved 2010-05-06.
  26. ^ CO2 Emissions from Fossil Fuel Combustion - Million Metric Tons CO2
  27. ^ "Electricity Data Browser". U.S. Department of Energy. March 28, 2018. Retrieved August 14, 2021.

External links

Read more information:

LG Household & Health Care Ltd.Nama asli주식회사 LG생활건강Nama latinJusikhoesa LG (El-Ji) SaenghwalgeongangJenisPublikKode emitenKRX: 051900IndustriBarang konsumenPendahuluLG ChemDidirikanApril 2001; 22 tahun lalu (2001-04)KantorpusatSeoul, Korea SelatanWilayah operasiSeluruh duniaTokohkunciSuk Y. Cha (Wakil Chairman dan CEO)ProdukKosmetik, Barang Rumah Tangga, MinumanPendapatanKRW 4.677 milyar (2014)[1]Laba operasiKRW 511 milyar (2014)[1]Laba bersihKRW 355 mily…

Peta Lokasi Kota Sawahlunto di Sumatera Barat Berikut adalah daftar kecamatan dan kelurahan/desa di Kota Sawahlunto, Sumatera Barat, Indonesia. Kota Sawahlunto memiliki 4 kecamatan, 10 kelurahan, dan 27 desa. Luas wilayahnya mencapai 231,93 km²[1] dan penduduk 64.299 jiwa (2017) dengan sebaran 277 jiwa/km².[2][3] Kode Kemendagri Kecamatan Jumlah Kelurahan Jumlah Desa Status Daftar Desa/Kelurahan 13.73.02 Barangin 4 6 Desa Balai Batu Sandaran Kolok Mudiak Kolok Nan Tuo L…

Lith adalah sebuah bekas gemeente Belanda yang terletak di provinsi Brabant Utara. Pada tahun 2004 daerah ini memiliki penduduk sebesar 6.724 jiwa. Artikel bertopik geografi atau tempat Belanda ini adalah sebuah rintisan. Anda dapat membantu Wikipedia dengan mengembangkannya.lbs

Jeff Sessions [[Jaksa Agung Amerika Serikat]] 84Masa jabatan9 Februari 2017 – 14 Februari 2019PresidenDonald TrumpWakilDana Boente (Penjabat)Rod Rosenstein PendahuluLoretta LynchPenggantiWilliam BarrSenator Amerika Serikat dari AlabamaMasa jabatan3 Januari 1997 – 8 Februari 2017 PendahuluHowell HeflinPenggantiLuther Strange[[Jaksa Agung Alabama]] 44Masa jabatan16 Januari 1995 – 3 Januari 1997GubernurFob James PendahuluJimmy EvansPenggantiBill PryorJaksa A…

Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. Cet article ne cite pas suffisamment ses sources (février 2019). Si vous disposez d'ouvrages ou d'articles de référence ou si vous connaissez des sites web de qualité traitant du thème abordé ici, merci de compléter l'article en donnant les références utiles à sa vérifiabilité et en les liant à la section « Notes et références ». En pratique : Quelles sources sont attendues ? Com…

Diego Godín Godín with Uruguay at the 2018 FIFA World CupInformasi pribadiNama lengkap Diego Roberto Godín Leal[1]Tanggal lahir 16 Februari 1986 (umur 38)[2][3]Tempat lahir Rosario, UruguayTinggi 187 m (613 ft 6 in)[3]Posisi bermain Centre-backKarier junior Estudiantes El Colla2000–2003 DefensorKarier senior*Tahun Tim Tampil (Gol)2003–2006 Cerro 63 (6)2006–2007 Nacional 26 (0)2007–2010 Villarreal 91 (4)2010–2019 Atlético Madrid 27…

Giorgio Vecchietti ed Enza Sampò nel 1972 durante la registrazione di una puntata di Paese mio, sorta di viaggio televisivo fra le opere d'arte. Giorgio Vecchietti (Bologna, 7 marzo 1907 – Roma, 12 ottobre 1975) è stato un giornalista e conduttore televisivo italiano. Biografia Fu uno dei 'padri' in Italia del giornalismo in televisione e conduttore di numerose rubriche giornalistiche della RAI. Collaboratore dagli anni trenta di riviste di cinema, fu anche condirettore della rivista cultura…

You can help expand this article with text translated from the corresponding article in Spanish. (May 2012) Click [show] for important translation instructions. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia. Do not translate text that appears unreliable or low-quali…

سيجيبيرت الثالث هو ملك الفرنجة حكم مابين 639 و656. سيجيبيرت الثالث (باللاتينية: Sigibertus)‏  ملك الفرنجة في أوستراسيا فترة الحكم19 كانون الثاني 639 ـ 1 شباط 656 نوع الحكم ملكي داجوبيرت الأول شيلديبيرت الثالث معلومات شخصية الميلاد 630 الوفاة 1 شباط 656 الزوجة شيمنيشيلد الأولاد داجوبيرت ا…

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Mimeograph EP – news · newspapers · books · scholar · JSTOR (January 2021) (Learn how and when to remove this template message) 2010 EP by Old 97'sMimeographEP by Old 97'sReleased6 July 2010GenreAlternative countryLength15:11LabelNew West RecordsOld 9…

Peta menunjukkan lokasi provinsi Davao Oriental Davao Timur atau Davao Oriental (Filipino:Silangang Davao) merupakan sebuah provinsi di Filipina. Ibu kotanya ialah Mati. Provinsi ini terletak di Region Davao. Provinsi ini memiliki luas wilayah 5.670,07 km² dengan memiliki jumlah penduduk 486.104 jiwa (2007). Provinsi ini memiliki angka kepadatan penduduk 86 jiwa/km². Pembagian wilayah Secara administratif provinsi Davao Oriental terbagi menjadi 11 munisipalitas dan 1 Kota komponen, yaitu:…

† Человек прямоходящий Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:ЧелюстноротыеНадкласс:ЧетвероногиеКлада:АмниотыКлада:СинапсидыКл…

Konsulat Jenderal Republik Indonesia di Davao CityKoordinat7°02′59″N 125°35′48″E / 7.049676°N 125.596729°E / 7.049676; 125.596729Lokasi Davao City, FilipinaAlamatPhase IV, Ecoland DriveMatina, Davao City, FilipinaYurisdiksi Daftar Mindanao Sulu Tawi-Tawi Konsul JenderalAgus TrenggonoSitus webkemlu.go.id/davaocity/id Konsulat Jenderal Republik Indonesia di Davao City (KJRI Davao City) adalah perwakilan konsuler Indonesia di Davao City, Filipina. Perwakilan yang…

Pour les articles homonymes, voir 122e régiment. Cet article est une ébauche concernant une unité ou formation militaire française. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. 122e régiment d'infanterie Insigne régimentaire du 122e régiment d'infanterie Centre d'Entraînement de l'Infanterie au Tir Opérationnel (CEITO) Création 1794 Dissolution 2016 Pays France Branche Armée de terre Typ…

Reale Marina dell'Oman البحرية السلطانية العمانيةL'emblema della marina omanita Descrizione generaleNazione Oman Dimensione4.200 uomini Guarnigione/QGAs Sib Fonti nel testo Voci su marine militari presenti su Wikipedia La Al-Bahriyya al-Malikiyya al-‘Umāniyya, Reale Marina dell'Oman nota internazionalmente come Royal Navy of Oman (arabo: البحرية السلطانية العمانية), abbreviato RNO, è la forza navale delle forze armate del Sultanato di Oman…

Культура Армении Литература Архитектура Музыка Театр Танец Одежда Ковроделие Миниатюра Изобразительное искусство Мифология Книгопечатание Образование Кино Календарь Система счисления Философия Право Кулинария Исто́рия армя́нского книгопеча́тания — история изда…

TFAM التراكيب المتوفرة بنك بيانات البروتينOrtholog search: PDBe RCSB قائمة رموز معرفات بنك بيانات البروتين 3FGH, 3TMM, 3TQ6, 4NNU, 4NOD المعرفات الأسماء المستعارة TFAM, MTTF1, MTTFA, TCF6, TCF6L1, TCF6L2, TCF6L3, transcription factor A, mitochondrial, MTDPS15 معرفات خارجية الوراثة المندلية البشرية عبر الإنترنت 600438 MGI: MGI:107810 HomoloGene: 31139 GeneCards: 70…

American politician Henry Alexander BaldwinKnown as Harry BaldwinDelegate to the U.S. House of Representatives from Hawaii Territory's At-large districtIn officeMarch 25, 1922 – March 3, 1923Preceded byJonah Kūhiō KalanianaʻoleSucceeded byWilliam P. Jarrett Personal detailsBorn(1871-01-12)January 12, 1871Maui, Kingdom of HawaiiDiedOctober 8, 1946(1946-10-08) (aged 75)Pāʻia, Maui, Territory of HawaiiPolitical partyHawaii Republican PartySpouseEthel Frances SmithChildrenFrance…

This article's lead section may be too short to adequately summarize the key points. Please consider expanding the lead to provide an accessible overview of all important aspects of the article. (January 2021) Aerospace operation in the United Kingdom and Ireland Boeing United Kingdom Ltd.Boeing Flight Services in CrawleyCompany typeSubsidiaryIndustryAerospaceFounded17 January 2002; 22 years ago (2002-01-17)[1]HeadquartersLondon, England, UKArea servedUnited Kingdom, Ir…

此條目可参照英語維基百科相應條目来扩充。 (2021年5月6日)若您熟悉来源语言和主题,请协助参考外语维基百科扩充条目。请勿直接提交机械翻译,也不要翻译不可靠、低品质内容。依版权协议,译文需在编辑摘要注明来源,或于讨论页顶部标记{{Translated page}}标签。 约翰斯顿环礁Kalama Atoll 美國本土外小島嶼 Johnston Atoll 旗幟颂歌:《星條旗》The Star-Spangled Banner約翰斯頓環礁地…

Kembali kehalaman sebelumnya