The Dual Contracts, which were signed on March 19, 1913, were contracts for the construction and/or rehabilitation and operation of rapid transit lines in the City of New York. The contracts were "dual" in that they were signed between the City and two separate private companies (the Interborough Rapid Transit Company and the Brooklyn Rapid Transit Company), all working together to make the construction of the Dual Contracts possible. The Dual Contracts promised the construction of several lines in Brooklyn. As part of Contract 4, the IRT agreed to build a branch of the original subway line south down Seventh Avenue, Varick Street, and West Broadway to serve the West Side of Manhattan.[4][5][6]
The construction of this line, in conjunction with the construction of the Lexington Avenue Line, would change the operations of the IRT system. Instead of having trains go via Broadway, turning onto 42nd Street, before finally turning onto Park Avenue, there would be two trunk lines connected by the 42nd Street Shuttle. The system would be changed from looking like a "Z" system on a map to an "H" system. One trunk would run via the new Lexington Avenue Line down Park Avenue, and the other trunk would run via the new Seventh Avenue Line up Broadway. In order for the line to continue down Varick Street and West Broadway, these streets needed to be widened, and two new streets were built, the Seventh Avenue Extension and the Varick Street Extension.[7] It was predicted that the subway extension would lead to the growth of the Lower West Side, and to neighborhoods such as Chelsea and Greenwich Village.[8][9]
Rector Street opened as part of an extension of the line from 34th Street–Penn Station to South Ferry on July 1, 1918.[10][11] Initially, the station was served by a shuttle running from Times Square to South Ferry.[10][12] The new "H" system was implemented on August 1, 1918, joining the two halves of the Broadway–Seventh Avenue Line and sending all West Side trains south from Times Square.[13] An immediate result of the switch was the need to transfer using the 42nd Street Shuttle in order to retrace the original layout. The completion of the "H" system doubled the capacity of the IRT system.[8]
Later years
The city government took over the IRT's operations on June 12, 1940.[14][15] On August 9, 1964, the New York City Transit Authority (NYCTA) announced the letting of a $7.6 million contract to lengthen platforms at stations from Rector Street to 34th Street–Penn Station on the line, and stations from Central Park North–110th Street to 145th Street on the Lenox Avenue Line to allow express trains to be lengthened from nine-car trains to ten-car trains, and to lengthen locals from eight-car trains to ten-car trains. With the completion of this project, the NYCTA project to lengthen IRT stations to accommodate ten-car trains would be complete.[16]
After the September 11, 2001 attacks, the subway tunnels around Cortlandt Street collapsed, and the line was closed temporarily. About 1,000 feet (300 m) of tunnels and trackage, including 575 feet (175 m) of totally destroyed tunnels and tracks in the vicinity of the World Trade Center site, were entirely rebuilt.[17] The station reopened on September 15, 2002.[18] During the intervening period, with service suspended indefinitely, the station underwent a $14 million renovation.[19]
Due to water damage to South Ferry caused by Hurricane Sandy, all 1 trains terminated at this station from October 2012 until April 4, 2013, when the former South Ferry Loop terminal station reopened.[20]
Each platform has mosaic trim line and name tablets of mostly green and brown. The tiles are painted light green below the "R" tablets.
Exits
This station has five fare control areas at three locations. There is no crossover between the uptown and downtown sides. On the northern end of the downtown platform, there are two High Entry/Exit Turnstiles leading to one street stair that goes up to the northwest corner of Rector and Greenwich Streets coming from two high entrance turnstiles directly on the platform. On the northern end of the uptown platform, a single staircase leads to the tiny, full-time mezzanine. It has a turnstile bank, token booth, and one street stair that leads to the north corner of Rector and Greenwich Streets.[24] The north end of the uptown platform had an exit to the basement of 88 Greenwich Street, which opened in 1931.[25] The exit to 88 Greenwich Street had closed by 1941.[26]
In the middle of the downtown platform, two staircases lead up to a tiny intermediate level where a single exit-only turnstile leads to a staircase that goes up midblock on Greenwich Street between Rector and Edgar Streets.[24]
The south end of the downtown platform has HEET turnstiles leading to a single staircase that goes up to Elizabeth H. Berger Plaza, just south of Edgar Street where Greenwich Street ends at the foot of the Brooklyn–Battery Tunnel. Directly across the street from this area, there are two street stairs that lead down to two HEET turnstiles on the uptown platform. These entrances are located directly across from another entrance to the separate Rector Street station on the BMT Broadway Line.[24]
^The Dual System of Rapid Transit. New York State Public Service Commission. September 1912. Archived from the original on January 26, 2021. Retrieved May 30, 2017.
^ ab"7th Avenue Subway System Is Opened To Public To-day: First Train Will Start at 2 O'Clock This Afternoon". New-York Tribune. July 1, 1918. p. 9. ProQuest575909557.
^"Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest1248134780.
^ abc"Rector Street Neighborhood Map". mta.info. Metropolitan Transportation Authority. April 2018. Archived from the original on August 29, 2021. Retrieved January 7, 2021.
Note: Service variations, station closures, and reroutes are not reflected here. Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Stations and line segments in italics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets. Struck through passenger track connections are closed or unused in regular service.